Before laying the floor tile, the line should be played first, and the floor and the door form a 90-degree baseline. The elastic line should start from the door and ensure that the entrance is a whole brick.
Apply cement mortar evenly.
When paving the floor tiles, cement mortar should be evenly coated on the back of the tiles, and then the tiles should be lightly compacted with a rubber hammer.
Pay attention to the drainage slope
The floor of kitchen and bathroom should be paved with sufficient drainage slope to ensure no water accumulation.
Splicing or even laying
Pay attention to whether the tiles need to be patched or paved in a unified direction when paving. After laying the tiles, fill the wet joints with caulking agent or white cement.