Section 1 Duties and Tasks of the Builders
First, the status of builders
Second, the builder's mission
Third, the task of the builder
Four, the builder's rights and responsibilities in quality control.
Five, the builder's job responsibilities
In the second quarter, the builder should have the conditions
A, the builder should have business knowledge.
Second, the builder should have professional quality
Third, builders should learn and master ISO2000 international standards.
Four, the builder should master the basis and methods of quality control.
Five, the builder should have legal knowledge.
Chapter II Reading of Construction Drawings of Water Supply and Drainage Works
The first section construction drawing reading basis
I. Forecast
Second, the axonometric drawing
Third, plan
Four. front view
Verb (abbreviation for verb) outline
Cross section of intransitive verbs
Legend symbols commonly used in the second water-saving and warm construction drawing
A, water supply and drainage engineering construction drawing commonly used legend symbols
Second, the heating project commonly used legend symbols
Three, fire installation project commonly used legend
In the third quarter, water supply and drainage, heating installation engineering construction drawing reading
I. Basic provisions
Second, the water supply and drainage engineering construction drawing reading
Three, heating engineering construction drawing reading
Chapter III Common Materials for Pipeline Engineering
Section 1 pipeline
I. Classification of pipelines
Second, the choice of pipes
Section 2 steel
First of all, angle steel
Second, flat steel
Third, channel steel
Four. flanged beam
Verb (abbreviation of verb) steel plate
Section 3 fillers and coatings
I. Fillers
Second, coating
Chapter IV Indoor Water Supply System Engineering
Section 1 Installation of Indoor Water Supply Pipes and Fittings
A, indoor water supply system layout and installation requirements
Second, the indoor water supply pipeline and accessories installation
Third, the project quality control and acceptance criteria
Section 2 Installation of Indoor Fire Water Supply System
First, the quality requirements of materials and equipment for fire protection system
Second, the installation and testing of indoor fire hydrant
Third, the project quality control and acceptance criteria
Section 3 Installation of Water Supply Equipment
First, the water pump installation
Second, the water tank installation
Third, the pipeline and equipment insulation
Four, engineering quality control and acceptance criteria
Chapter V Installation of Indoor Drainage System
Section 1 Installation of Indoor Drainage Pipes and Fittings
First, the layout and laying of indoor drainage pipes
Second, the setting of inspection port and cleaning port
Third, the pipeline connection and installation
Four. Installation of pipeline drainage snorkel
Verb (abbreviation for verb) Drainage pipe test
Six, engineering quality control and acceptance criteria
Section 2 Installation of Rainwater Pipes and Fittings
A, the composition of the rainwater pipeline system
Second, the rainwater pipeline system installation
Three, rainwater pipe irrigation test
Four, engineering quality control and acceptance criteria
Chapter VI Installation of Indoor Hot Water Supply System
Section 1 Installation of Indoor Hot Water Supply Pipes and Accessories
I. Classification and Composition of Hot Water Supply System
Second, the compensator pretension and installation
Third, the hot water supply pipeline installation
Four, hot water supply pipe installation
Verb (abbreviation for verb) Pipe insulation
Six, hot water supply system test
Seven, engineering quality control and acceptance criteria
Section 2 Installation of Auxiliary Equipment
A, material (equipment) quality requirements
Second, the solar water heater installation
Third, the heat collection equipment installation
Fourth, the heat exchanger installation
Verb (abbreviation of verb) Installation of water pump
Six, water tank installation
Seven, engineering quality control and acceptance criteria
Chapter VII Installation of Sanitary Ware
Section 1 Installation of Sanitary Ware and Water Supply Fittings
I. Material specifications and quality requirements
Second, the selection and installation of sanitary ware
Three. Installation of toilet sanitary ware
Four, the installation of sanitary ware for washing and bathing.
Verb (abbreviation for verb) Install sanitary ware for washing.
Six, drain plug and floor drain installation
Seven, sanitary ware filled with water and water test
Eight, engineering quality control and acceptance criteria
Section 2 Installation of Sanitary Ware Drain Pipe
I. Installation of Drainage Fittings and Pipes
Second, the project quality acceptance criteria
Chapter VIII Installation of Indoor Heating System
Section 1 Installation of Indoor Heating Pipes and Accessories
I. Material specifications and quality requirements
Second, the indoor heating pipe installation
Third, the compensator installation
Four, pipeline valve installation
Five, branch pipe installation
VI. Protection and insulation of pipelines, supports and equipment
Section 2 Installation of Auxiliary Equipment and Radiator
I. Material specifications and quality requirements
Second, the radiator assembly and installation
Section 3 Manufacture and Installation of Metal Radiant Plate
A, radiant panel production and water pressure test
Second, the radiant panel installation
Section 4 Installation of Low Temperature Hot Water Floor Radiant Heating System
First, coil laying
2. Specification and installation of water distributor and water collector
Third, the floor construction of each structural layer
Section 5 Hydrostatic Test and Debugging of Indoor Heating System
First, the system water pressure test
Second, the system flushing and debugging
Section 6 Engineering Quality Acceptance Criteria
I. Installation of Pipes and Accessories
Second, the auxiliary equipment and radiator and metal radiant panel installation
Three, low temperature hot water floor radiant heating system installation
Chapter 9 Installation of Outdoor Water Supply Pipe Network
Section 1 General Provisions
I. Requirements for pipes and fittings of water supply pipes
Second, the fire pump and outdoor fire hydrant installation regulations
Section 2 Installation of Water Supply Pipeline
A, water supply pipeline laying
Second, the pipeline connection
Third, the cast iron pipe connection
Four, pipe network hydrostatic test
Five, pipeline flushing
Six, engineering quality control and acceptance criteria
The third quarter fire pump adapter and outdoor fire hydrant installation
A, outdoor fire pump adapter and fire hydrant settings
Second, the configuration of fire hydrant
Third, outdoor fire hydrant installation
Fourth, the project quality acceptance criteria
Section 4 Trench and Well Chamber
A, pipe trench construction
Second, the well chamber construction
Third, the project quality control and acceptance criteria
Chapter 10 Installation of Outdoor Drainage Pipe Network
Section 1 Installation of Drainage Pipe
First, the specifications and quality of the drainage pipe
Second, the drainage pipe slope requirements
Third, the drainage cast iron pipe installation
Fourth, the drain pipe connection
Verb (abbreviation of verb) laying of drainage pipe
Six, pipeline irrigation test and water test
Seven, engineering quality control and acceptance criteria
Section 2 Drains and Wells
A, pipe trench foundation treatment and well floor
Second, the drainage pipeline foundation
Three, the form and structure of drainage wells and drainage pools
Four, engineering quality control and acceptance criteria
Chapter 11 Installation of Outdoor Heating Pipe Network
Section 1 Installation of Pipes and Fittings
A, pipeline quality requirements
Second, the pipeline laying
Third, the pipeline insulation and protection
Four, pipe installation
Five, engineering quality control and acceptance criteria
In the second quarter, the system water pressure test and debugging
A, pipeline hydrostatic test
Second, the pipeline flushing, commissioning and debugging
Third, the project quality control
Chapter XII Installation of Building Water Supply System and Swimming Pool Water Supply System
Section 1 Installation of Water System Pipes and Auxiliary Equipment in Buildings
First, the reclaimed water system pipeline installation
Second, the water system auxiliary equipment installation
Third, the project quality control and acceptance criteria
Section 2 Installation of Swimming Pool Water System
A, swimming pool water system installation materials
Second, the swimming pool system installation
Third, the project quality control and acceptance criteria
Chapter XIII Installation of Heating Boiler and Auxiliary Equipment
Section 1 Overview
First, the boiler
Second, the boiler room
Section 2 Boiler Installation
A, boiler equipment foundation construction
Second, the basic provisions of boiler installation
Third, the boiler body installation
Four, economizer installation
Five, grate installation
Six, boiler water pressure test
Seven, engineering quality control and acceptance criteria
Section 3 Installation of Auxiliary Equipment and Pipes
I. Foundation of Auxiliary Equipment
Second, send, induced draft fan installation
Three. Installing water jet (water jet)
Fourth, the trap installation
Five, dust collector installation
Six, soft water equipment installation
Seven, single bucket elevator installation
Eight, water pump installation
Nine, engineering quality control and acceptance criteria
Section 4 Installation of Safety Accessories
First, the safety valve installation
Second, the pressure gauge installation
Third, the water level gauge installation
Fourth, the pressure reducing valve installation
Verb (abbreviation for verb) Installation of thermometer
Six, engineering quality control and acceptance criteria
Section 5 Oven, Boiling Furnace and Trial Operation
First, the oven
Second, the cooking stove.
Third, the boiler debugging
Four, engineering quality control and acceptance criteria
Section 6 Installation of Heat Exchange Station
I. Horizontal heat exchanger
Second, the heat exchanger installation
Third, the equipment insulation
Fourth, the project quality acceptance criteria
Chapter XIV Construction Organization and Management of Pipeline Engineering
The first section construction organization design
First, the concept and function of construction organization design
Second, the classification of construction organization design
Third, the basic content of construction organization design
Four, the construction organization design principles
Five, the construction organization design basis
Six, the steps and procedures of construction organization design
Seven, construction drawing design
Section 2 Engineering Technology Management
I. Functions, Tasks and Contents of Technology Management
Second, the basic system of technology management
The third quarter project quality management
First, the principle of quality management
Second, the process of quality management
Third, the quality management stage.
Fourth, the process quality management
Verb (abbreviation of verb) finished product protection
Six, the classification of engineering quality problems
Seven, engineering quality problems.
The fourth quarter construction site safety management and civilized construction
A, the construction site safety management
Second, the construction site civilization construction
Three. Handling and investigation of safety accidents
Fourth, aerial work technology
Five, site fire prevention
Six, the basic safety requirements of welding operation
Seven, the basic safety requirements of gas welding operation
Eight, winter and rain construction safety measures
Section 5 Engineering Data Management
A, data management regulations
Second, the construction data management process
Three. Classification and numbering of engineering data
Fourth, the quality requirements of engineering data compilation
appendix
Appendix 1 Common symbols and codes
Appendix II Conversion of Universal Units of Measurement
Annex III Calculation Formula of Shared Area and Shared Volume
refer to