Current location - Education and Training Encyclopedia - Education and training - Integrated catalogue of pipeline builders
Integrated catalogue of pipeline builders
Chapter I Overview of the Builders

Section 1 Duties and Tasks of the Builders

First, the status of builders

Second, the builder's mission

Third, the task of the builder

Four, the builder's rights and responsibilities in quality control.

Five, the builder's job responsibilities

In the second quarter, the builder should have the conditions

A, the builder should have business knowledge.

Second, the builder should have professional quality

Third, builders should learn and master ISO2000 international standards.

Four, the builder should master the basis and methods of quality control.

Five, the builder should have legal knowledge.

Chapter II Reading of Construction Drawings of Water Supply and Drainage Works

The first section construction drawing reading basis

I. Forecast

Second, the axonometric drawing

Third, plan

Four. front view

Verb (abbreviation for verb) outline

Cross section of intransitive verbs

Legend symbols commonly used in the second water-saving and warm construction drawing

A, water supply and drainage engineering construction drawing commonly used legend symbols

Second, the heating project commonly used legend symbols

Three, fire installation project commonly used legend

In the third quarter, water supply and drainage, heating installation engineering construction drawing reading

I. Basic provisions

Second, the water supply and drainage engineering construction drawing reading

Three, heating engineering construction drawing reading

Chapter III Common Materials for Pipeline Engineering

Section 1 pipeline

I. Classification of pipelines

Second, the choice of pipes

Section 2 steel

First of all, angle steel

Second, flat steel

Third, channel steel

Four. flanged beam

Verb (abbreviation of verb) steel plate

Section 3 fillers and coatings

I. Fillers

Second, coating

Chapter IV Indoor Water Supply System Engineering

Section 1 Installation of Indoor Water Supply Pipes and Fittings

A, indoor water supply system layout and installation requirements

Second, the indoor water supply pipeline and accessories installation

Third, the project quality control and acceptance criteria

Section 2 Installation of Indoor Fire Water Supply System

First, the quality requirements of materials and equipment for fire protection system

Second, the installation and testing of indoor fire hydrant

Third, the project quality control and acceptance criteria

Section 3 Installation of Water Supply Equipment

First, the water pump installation

Second, the water tank installation

Third, the pipeline and equipment insulation

Four, engineering quality control and acceptance criteria

Chapter V Installation of Indoor Drainage System

Section 1 Installation of Indoor Drainage Pipes and Fittings

First, the layout and laying of indoor drainage pipes

Second, the setting of inspection port and cleaning port

Third, the pipeline connection and installation

Four. Installation of pipeline drainage snorkel

Verb (abbreviation for verb) Drainage pipe test

Six, engineering quality control and acceptance criteria

Section 2 Installation of Rainwater Pipes and Fittings

A, the composition of the rainwater pipeline system

Second, the rainwater pipeline system installation

Three, rainwater pipe irrigation test

Four, engineering quality control and acceptance criteria

Chapter VI Installation of Indoor Hot Water Supply System

Section 1 Installation of Indoor Hot Water Supply Pipes and Accessories

I. Classification and Composition of Hot Water Supply System

Second, the compensator pretension and installation

Third, the hot water supply pipeline installation

Four, hot water supply pipe installation

Verb (abbreviation for verb) Pipe insulation

Six, hot water supply system test

Seven, engineering quality control and acceptance criteria

Section 2 Installation of Auxiliary Equipment

A, material (equipment) quality requirements

Second, the solar water heater installation

Third, the heat collection equipment installation

Fourth, the heat exchanger installation

Verb (abbreviation of verb) Installation of water pump

Six, water tank installation

Seven, engineering quality control and acceptance criteria

Chapter VII Installation of Sanitary Ware

Section 1 Installation of Sanitary Ware and Water Supply Fittings

I. Material specifications and quality requirements

Second, the selection and installation of sanitary ware

Three. Installation of toilet sanitary ware

Four, the installation of sanitary ware for washing and bathing.

Verb (abbreviation for verb) Install sanitary ware for washing.

Six, drain plug and floor drain installation

Seven, sanitary ware filled with water and water test

Eight, engineering quality control and acceptance criteria

Section 2 Installation of Sanitary Ware Drain Pipe

I. Installation of Drainage Fittings and Pipes

Second, the project quality acceptance criteria

Chapter VIII Installation of Indoor Heating System

Section 1 Installation of Indoor Heating Pipes and Accessories

I. Material specifications and quality requirements

Second, the indoor heating pipe installation

Third, the compensator installation

Four, pipeline valve installation

Five, branch pipe installation

VI. Protection and insulation of pipelines, supports and equipment

Section 2 Installation of Auxiliary Equipment and Radiator

I. Material specifications and quality requirements

Second, the radiator assembly and installation

Section 3 Manufacture and Installation of Metal Radiant Plate

A, radiant panel production and water pressure test

Second, the radiant panel installation

Section 4 Installation of Low Temperature Hot Water Floor Radiant Heating System

First, coil laying

2. Specification and installation of water distributor and water collector

Third, the floor construction of each structural layer

Section 5 Hydrostatic Test and Debugging of Indoor Heating System

First, the system water pressure test

Second, the system flushing and debugging

Section 6 Engineering Quality Acceptance Criteria

I. Installation of Pipes and Accessories

Second, the auxiliary equipment and radiator and metal radiant panel installation

Three, low temperature hot water floor radiant heating system installation

Chapter 9 Installation of Outdoor Water Supply Pipe Network

Section 1 General Provisions

I. Requirements for pipes and fittings of water supply pipes

Second, the fire pump and outdoor fire hydrant installation regulations

Section 2 Installation of Water Supply Pipeline

A, water supply pipeline laying

Second, the pipeline connection

Third, the cast iron pipe connection

Four, pipe network hydrostatic test

Five, pipeline flushing

Six, engineering quality control and acceptance criteria

The third quarter fire pump adapter and outdoor fire hydrant installation

A, outdoor fire pump adapter and fire hydrant settings

Second, the configuration of fire hydrant

Third, outdoor fire hydrant installation

Fourth, the project quality acceptance criteria

Section 4 Trench and Well Chamber

A, pipe trench construction

Second, the well chamber construction

Third, the project quality control and acceptance criteria

Chapter 10 Installation of Outdoor Drainage Pipe Network

Section 1 Installation of Drainage Pipe

First, the specifications and quality of the drainage pipe

Second, the drainage pipe slope requirements

Third, the drainage cast iron pipe installation

Fourth, the drain pipe connection

Verb (abbreviation of verb) laying of drainage pipe

Six, pipeline irrigation test and water test

Seven, engineering quality control and acceptance criteria

Section 2 Drains and Wells

A, pipe trench foundation treatment and well floor

Second, the drainage pipeline foundation

Three, the form and structure of drainage wells and drainage pools

Four, engineering quality control and acceptance criteria

Chapter 11 Installation of Outdoor Heating Pipe Network

Section 1 Installation of Pipes and Fittings

A, pipeline quality requirements

Second, the pipeline laying

Third, the pipeline insulation and protection

Four, pipe installation

Five, engineering quality control and acceptance criteria

In the second quarter, the system water pressure test and debugging

A, pipeline hydrostatic test

Second, the pipeline flushing, commissioning and debugging

Third, the project quality control

Chapter XII Installation of Building Water Supply System and Swimming Pool Water Supply System

Section 1 Installation of Water System Pipes and Auxiliary Equipment in Buildings

First, the reclaimed water system pipeline installation

Second, the water system auxiliary equipment installation

Third, the project quality control and acceptance criteria

Section 2 Installation of Swimming Pool Water System

A, swimming pool water system installation materials

Second, the swimming pool system installation

Third, the project quality control and acceptance criteria

Chapter XIII Installation of Heating Boiler and Auxiliary Equipment

Section 1 Overview

First, the boiler

Second, the boiler room

Section 2 Boiler Installation

A, boiler equipment foundation construction

Second, the basic provisions of boiler installation

Third, the boiler body installation

Four, economizer installation

Five, grate installation

Six, boiler water pressure test

Seven, engineering quality control and acceptance criteria

Section 3 Installation of Auxiliary Equipment and Pipes

I. Foundation of Auxiliary Equipment

Second, send, induced draft fan installation

Three. Installing water jet (water jet)

Fourth, the trap installation

Five, dust collector installation

Six, soft water equipment installation

Seven, single bucket elevator installation

Eight, water pump installation

Nine, engineering quality control and acceptance criteria

Section 4 Installation of Safety Accessories

First, the safety valve installation

Second, the pressure gauge installation

Third, the water level gauge installation

Fourth, the pressure reducing valve installation

Verb (abbreviation for verb) Installation of thermometer

Six, engineering quality control and acceptance criteria

Section 5 Oven, Boiling Furnace and Trial Operation

First, the oven

Second, the cooking stove.

Third, the boiler debugging

Four, engineering quality control and acceptance criteria

Section 6 Installation of Heat Exchange Station

I. Horizontal heat exchanger

Second, the heat exchanger installation

Third, the equipment insulation

Fourth, the project quality acceptance criteria

Chapter XIV Construction Organization and Management of Pipeline Engineering

The first section construction organization design

First, the concept and function of construction organization design

Second, the classification of construction organization design

Third, the basic content of construction organization design

Four, the construction organization design principles

Five, the construction organization design basis

Six, the steps and procedures of construction organization design

Seven, construction drawing design

Section 2 Engineering Technology Management

I. Functions, Tasks and Contents of Technology Management

Second, the basic system of technology management

The third quarter project quality management

First, the principle of quality management

Second, the process of quality management

Third, the quality management stage.

Fourth, the process quality management

Verb (abbreviation of verb) finished product protection

Six, the classification of engineering quality problems

Seven, engineering quality problems.

The fourth quarter construction site safety management and civilized construction

A, the construction site safety management

Second, the construction site civilization construction

Three. Handling and investigation of safety accidents

Fourth, aerial work technology

Five, site fire prevention

Six, the basic safety requirements of welding operation

Seven, the basic safety requirements of gas welding operation

Eight, winter and rain construction safety measures

Section 5 Engineering Data Management

A, data management regulations

Second, the construction data management process

Three. Classification and numbering of engineering data

Fourth, the quality requirements of engineering data compilation

appendix

Appendix 1 Common symbols and codes

Appendix II Conversion of Universal Units of Measurement

Annex III Calculation Formula of Shared Area and Shared Volume

refer to