Summary of work of chief supervision engineer
Summary of Chief Supervision Engineer's Work 1 Time always passes by inadvertently, and 20xx years will soon end. Looking back on this year's work, I sincerely thank the company leaders for their concern, trust and support. In one year's work, I worked hard, had a good professional ethics and a strong sense of responsibility, and successfully completed the corresponding supervision tasks. In order to sum up the experience and lessons and better carry out the supervision work next year, the situation is now reported to the leaders as follows:

I. Work situation

Over the past year, we have always adhered to the guiding ideology of "quality first, prevention first, process control and terminal control" in line with the principles of law-abiding, fairness, science and integrity, adhered to professional ethics, maintained the image of supervision, strictly supervised the construction unit and enthusiastically served the owner unit, and achieved the following points in our work:

1, study hard at ordinary times, and control carefully in advance. Carefully review various construction schemes before construction, lead the supervisors of this bid section to be familiar with construction drawings and relevant design specifications, learn relevant specifications and procedures, and require supervisors to master key links, find out difficulties and focus on quality control objectives.

2, in the process of construction, strengthen control. Pay attention to the inspection and acceptance of materials entering the site, and carefully sign the application materials of qualified materials. Materials that fail to pass the appearance acceptance are required to be cleaned up by the construction unit under the supervision of the site supervisor and shall not be used. Strengthen on-site inspection, point out and solve problems in time when they are found, and prevent problems before they happen.

3, after control, strictly implement the acceptance procedures and quality standards.

Second, the shortcomings and suggestions

1. I found that my professional level, professional technical ability and organization and coordination ability need to be further improved. For example, the mastery of some norms is not skilled enough; There are too many verbal instructions to the construction unit and insufficient written instructions.

2. Strengthen the internal training of supervisors, actively participate in the study organized by the company, and strengthen the accumulation of their own theoretical knowledge.

3. Strictly implement the supervision procedures, handle the existing problems in time and report them in time, and further do a good job in drafting, reviewing and signing all kinds of supervision documents.

Three. Work plan and next year's plan

1, be strict with yourself, study hard, constantly update and supplement new knowledge, improve business level and work ability, and better adapt to the complex working environment on the construction site.

2. Arrange work, study and life reasonably, and constantly enrich yourself in the process of work.

3. Further strengthen on-site quality control and resolutely put an end to quality accidents caused by poor supervision.

4, reasonable arrangement, carefully guide the on-site supervision work, do a good job in the ideological work of the supervisors in this bid section, and give them better help and care. Give full play to the subjective initiative, work enthusiasm and creativity of everyone in the whole supervision team, unite and cooperate with one heart and one mind, and do a good job in supervision for 20xx years.

5. Organize the on-site supervision data in time to ensure that the supervision data is true, accurate, complete and timely.

The concern and support of company leaders and comfortable working conditions have given me the motivation to work hard. The warm care and cooperation of my colleagues make me feel comfortable and practical in my work, and the unique corporate culture atmosphere of the company makes me full of confidence in my work. I firmly believe that I can do better in my future work and contribute to the development of the company.

Summary of the work of the chief supervision engineer 2. In a blink of an eye, one year is about to pass. Today, with rapid development and rapid changes, the construction industry is promoting social progress with a brand-new attitude, creating world civilization and welcoming a better future for mankind.

I have been engaged in the construction industry for more than 30 years and deeply love my major. As the project leader, I insist on contract management as the main line, quality control as the center, and implement standardized management. Neither the construction unit nor the construction unit complained by phone or in writing, and they were not assessed as C or D by the company, which put an end to the occurrence of safety and quality accidents. So that the supervision work can be carried out smoothly.

From June last year 1 1 to April this year, the company sent me to the technical department for inspection, and I traveled all over Sichuan. During the inspection project; We are not afraid of hardship and fatigue. We will check and change, learn from each other and improve together. We overfulfilled the weekly inspection tasks assigned by the company. For the company, in order to save costs and expenses, I always carefully calculate and never exceed the standard for personal enjoyment. Sometimes, in order to save 20 yuan, I have to go to several places to rest and eat, and try my best to consider the company. During the inspection, the professional level and ideological quality of the supervisor have been well received by various project departments and most directors.

1. Since I became the project director, I have been carrying out the purpose of "strict supervision and enthusiastic service". Strictly and scientifically implement the relevant laws, regulations, standards and norms of construction projects. Strictly abide by fair, honest and scientific working standards to win the trust of the owners and constructors. Under my leadership, all the staff of the project department can unite as one, be conscientious, meticulous and conscientious, and do not remember personal gains and losses. No matter the scorching sun or the wind and rain, there is no complaint at work. Work normally in daily overtime (acceptance of steel bars at night 10) and holidays, without subsidies and overtime pay, and work hard for the honor of the company. So as to win glory for the company, embody Yuanfeng's entrepreneurial spirit and win the praise of the construction unit and the construction unit.

2. The project supervision data is well managed, and the process data is timely, standardized and complete; All office facilities are configured and managed according to the company's regulations, and materials are closed and stored in an orderly manner from beginning to end according to relevant regulations.

3, serious and responsible work, conscientiously implement the provisions of the superior administrative department; My monthly attendance rate is not less than 95% days. Every weekend and national holidays, the high-tech zone safety supervision station will inspect the project director, project manager and Party A's representative without being absent. For example; 10 ended at 1 10, and my wife was ill in her hometown hospital for a month. As a husband, I didn't do my duty as a husband. I went home to have a look, but I got the understanding and support of my virtuous wife. Another example is; 165438+1On October 6th, my eldest brother, who was born with my father, passed away, and I didn't have time to wake him up. I just left the construction site the day he was buried. What am I doing? What I think is that I shoulder the heavy responsibility of the company, and what I think is the quality and safety of the project. In order to shoulder the heavy responsibility and Yuanfeng's reputation, I tried my best to perform the duties agreed in the supervision contract.

4, in order to strengthen the supervision and management of construction quality and safety, according to the provisions of the relevant regulations and policies; Reflect the "separation of inspection scores" in the construction process and strengthen the acceptance; Improve the means; The guiding principle of "process control" embodies the rules and regulations of Yuanfeng management, and implements the corresponding reward and punishment system for quality control, safety supervision and implementation in the construction process. It is our responsibility to strictly abide by the company's management system, strictly implement the management regulations of the department, and perform the duties agreed in the contract according to the chapter.

5. Seriously perform the duties of directors; Prepare supervision plans and special supervision rules, organize weekly supervision meetings and coordination meetings, organize weekly and monthly special safety inspections, examine and approve construction plans, review letters and sign supervision logs. Communicate and coordinate with the owner and corresponding personnel of the construction party on project-related matters from time to time. Organize the supervisors of the project department to learn the specifications, supervision responsibilities and rules and regulations every week. Understand the mentality of each employee in time, let them play their respective enthusiasm and actively perform their duties. They improved their professional technical level and management ability, and in order to better fulfill the target value of the supervision contract, they actively trained a new generation of elite talents for the company, which was loved and respected by all the staff of the project department.

6. Through years of work practice, I have accumulated rich practical work experience and strong ability of supervision and management on the construction site. In practical work, I have a certain ability of organization and coordination, a strong sense of responsibility and hard-working dedication. In our work, we take careful service to the owners as our purpose and practice according to the principles of "abiding by the law, honesty, fairness and science". As the director of the project, there has never been a quality and safety accident. Last year, the project as the director was awarded the honorary title of "Excellent Supervision Department". Every project managed has been well received by Party A and the construction party.

As the factory director, in the future work, I will work harder, strive for perfection in technology, sum up experience and innovate constantly, and train more compound professionals who know both technology and management for the company. Work harder and actively cooperate with the daily management of the company, so that every employee of my project can become a better supervision engineer, take the development of construction to a new level and make more contributions to society.

Summary of chief supervision engineer's work. As time goes by, a year will soon pass. At the end of this year, I will review my work in the past year, calm down and sum up my achievements and gains, and find out my shortcomings, so as to facilitate my future work and sum up my work in the past year. I sincerely hope that you will give me tips on improper summary, which will help me a lot. In the past year, with the strong support and care of the leaders of the company and the project department, I seriously adhered to the pre-control. Standardized, scientific and high-quality work guiding ideology, firmly establish the service purpose of ensuring the satisfaction of every owner, and work hard with all your heart. Let's talk about my work and performance in the following aspects:

I. Information management

(1) Correspondence between units shall be registered by unified number, and then the receipt processing sign shall be filled in, submitted to the director for examination and approval, and submitted to the reading clerk according to the instructions, so as to timely supervise the timely processing.

(2) In order to facilitate the preparation of meeting minutes, I attend every meeting on time and make records, because the minutes are an incisive exposition and high generalization of the meeting contents, higher than the meeting minutes, and involve the transformation of oral language into professional terms. If you don't understand, you will actively consult my colleagues and strive to make the work more perfect.

(3) Most of the data of the monthly supervision report comes from the monthly construction report. Before making the monthly report, we must study the monthly report of construction carefully and understand the details thoroughly. Only in this way can we judge whether some situations are true or not.

Second, the ` quality control of engineering construction

(1) After receiving the engineering construction drawings, I will be familiar with the drawings, understand the design intent, understand the main technological process and engineering characteristics of the construction process, record the objections on the construction drawings in writing, and submit them to the chief supervision engineer at the meeting of the blue prints.the design, which will be made clear by the design.

(2) Process control of all incoming materials and semi-finished products. In addition to checking the relevant inspection data submitted by the construction party according to the standards and design requirements, I also make a visual inspection of the appearance quality of the materials when they enter the site, and prevent them from being used in the project if they do not meet the requirements in appearance quality. For the construction of key parts of the project, I will arrive at the station in advance to check the construction preparation and make timely and completely real preparations for the whole construction process. For each working procedure of general construction, do a good job of daily patrol, patrol and inspection, notify the project management department of the construction unit in oral or written form in time for the problems found in each construction process, report the problems found to the director in time, urge the construction unit to carry out rectification and review, do a good job in quality control before and during the construction supervision, and do a good job.

Three, safety and civilized construction control work

Through the study of "Safety Production Law" and some experience gained in my work, I have established the most important viewpoint of safety prevention, that is, work should be done first, because accidents can be prevented but unpredictable, and corresponding inspection systems should be established to rectify hidden dangers in time. The supervisor has an unshirkable responsibility for the safety of the construction site. In addition to daily safety inspection, supervision and management, I insist on daily safety education for construction units. Conduct regular or irregular monthly technical education on technical jobs and post safety technical disclosure inspection (including safety account and written materials), conduct a comprehensive inspection on the site construction safety status, and file the safety inspection record account.

In view of the engineering safety control requirements put forward by the company's leaders, deepen supervision and management, issue rectification notices in time for existing problems, require the construction unit to carry out rectification, urge rectification and re-examine in time. My experience is that the quality control in the supervision of engineering construction process, especially the control of safe and civilized production, should and must be carried out with four diligence systems: eye diligence (to find problems in advance); Attendance on foot (mostly on-site rotation, patrol and inspection); Keep your mouth shut (talk more about the problems found); Manual attendance (make relevant records in time and notify in writing); Only by strengthening the inspection work and strengthening the control in the process can we do the work well and seriously. The work in 2008 was both busy and full. In order to perform the supervision duties well, we should work actively, work hard, obey the arrangement of the leaders, never shirk, and think of the project wholeheartedly.

Summary of the work of chief supervision engineer 4200 years will soon pass. According to the requirements of the company's 1 February1day notice, I will now make the following summary report on the work this year:

In 200x, I undertook the director of three projects (including the director's representative):

1, Jiangxi Machinery Workers College New Campus Infrastructure Project:

Project name: same as above.

Project scale: the total investment is about 5.59 million yuan, including road engineering, rainwater drainage engineering, high-voltage lighting, steel roof truss and administrative building, and glass curtain wall on the roof of library.

Project commencement time: July 7th, 200x, and the supervisor will be stationed.

Project completion: At present, the project has been completed, and the construction unit is conducting self-inspection to eliminate defects. The project will accept 65438 at the end of February.

2. Office building and dormitory project of Nanchang Economic and Technological Development Zone Electric Power Engineering Company:

Project name: same as above.

Project scale: The total investment is about 3 million yuan, of which the office building is a four-story frame and the dormitory building is a five-story brick-concrete building with a construction area of 5479.7M2.

Project commencement time: the project starts at 200x,165438+1October 24th, and the supervisor will be stationed.

Project completion: At present, the concrete pouring of the second floor of the office building project has been completed, and the formwork support and steel bar binding of the second floor of the dormitory building have been completed. The project will be completed by the end of March next year.

List of supervisors involved in the project:

Chief supervision engineer of the project: Zhu Riliang

Representative of Chief Supervision Engineer: Jian Jun.

Supervisors: Cheng.

3. Maiyuan 1 10kV Substation Project:

Project name: same as above.

Project scale: The total investment is about 40 million yuan, including a 1 10KV substation, 3.8km of1/0kv transmission cable and 6.3km of overhead lines.

Project commencement time: the project starts at 200x,165438+1October 24th, and the supervisor will be stationed.

Project completion: At present, the foundation and wall of the main control building and switch room below 0.00 m have been completed, the grounding device of the site has been completed 80%, and the site foundation is being excavated. The project will be completed by the end of April next year.

List of supervisors involved in the project:

Chief supervision engineer of the project: Zhu Riliang

Representative of Chief Supervision Engineer: Jian Jun.

Supervisors: Fang (electrical), (civil) and Yu Yugen (power transmission).

Supervision planning and "four controls, two pipes and one coordination";

According to the requirements of the project entrusted supervision contract, cooperate with the company's engineering department to prepare the project supervision plan in time. As the project director, I insist on contract management as the main line and quality control as the center to implement standardized management.

① Quality control: take the control measures proposed by the supervision plan as the main means, adhere to the principle of high quality to ensure the time limit for a project, organize the witness of point W, point H and point S in time during the construction, stop the pending work and stand by, and organize periodic quality inspection and evaluation in time; The emphasis is on the quality control of raw materials and construction process.

(2) Progress control: According to the general construction progress plan compiled by the construction unit and the requirements of the contract period, the project supervision department uses Project20xx software to make a progress control plan, regularly check the progress completion, report the found progress deviation to the owner in time, and require the construction unit to take timely measures to remedy it. I have adopted Project20xx software production schedule control plan in all my projects as the director, which has won unanimous praise from the owners.

(3) Investment control: mainly deal with many changes in the construction process, and reasonably calculate the completed engineering quantity. According to the characteristics of the project and the owner's requirements, make original records, and provide realistic basis for the change of project quantity, the audit of engineering measurement related data and the signing of original documents.

④ Safety control: On the basis of urging the construction unit to improve the safety and quality assurance system (such as wearing safety helmets and setting up safety protection nets), the supervision department will supervise and manage the safety protection measures of the project, put forward potential safety hazards in time, and prevent safety and quality accidents.

⑤ Contract information management: Contract management is the foundation and main line of supervision work. At the beginning of the project, the project supervision department requires supervisors to be familiar with and master the terms of the supervision contract, and not to supervise the projects beyond the supervision contract that the owner requires to witness. In the information management work, computerized office is adopted. According to the requirements of the company's standard documents and the Specification for Construction Engineering Archives Arrangement, the correspondence documents are classified and filed in time, and the supervisors are required to record the correspondence documents, and the documents that do not meet the filing requirements are processed separately.

⑥ Coordination work: including internal coordination and external coordination. In my daily coordination work, I mainly adopt the method of meeting coordination, and external coordination adopts the method of coordination meeting, which puts out the problems in the process of project implementation and concentrates the collective wisdom of all parties to discuss and solve them, and has achieved good results. In the external coordination work, it is very important to straighten out one's position and fully gain the trust of the owners in order to carry out the work well. In the internal coordination work, we should pay attention to the role of regular supervision meetings, fully mobilize the enthusiasm of supervisors and give play to their personal abilities.

Problems and suggestions in this year's supervision;

In this year's supervision work, the following problems mainly appeared:

1. During the implementation of the infrastructure project in the new campus of Provincial Machinery Workers College, the owner was not familiar with the requirements of the project construction procedures, and many problems were decided by the leaders without communicating with the supervisor. For example, section c wants to grab the progress. At the coordination meeting, the three parties agreed to adopt the scheme of C25 concrete pavement, but after listening to the suggestion of the design institute, the owner asked the construction unit to adopt the scheme of increasing the cement content in the pavement water stability the next day. Moreover, it didn't say hello to the supervisor, didn't save much investment, but delayed the construction period for nearly 20 days, so that the road for students to enter the B section of the school was not completed by September. Later, Yuan from the Infrastructure Section came to me and said that if I had listened to the supervisor's advice, such problems would not have occurred and apologized to me.

Supervision comments and suggestions: it is a headache to meet such owners who don't understand the construction procedures. The only way is to instill in them the general procedures and requirements of engineering construction. If he doesn't listen, we should make daily supervision records, memos and other relevant documents. If serious consequences are caused, the supervisor will not bear any responsibility arising therefrom.

2. The original budget investment of the infrastructure project of the new campus of Provincial Machinery Workers College is 36,543,800 yuan. Due to the owner's delay in delivery of the site and other non-construction reasons (such as the owner's proposal to increase the excavation of three large reservoirs, resulting in an increase of nearly 50,000 cubic meters of earthwork), the construction unit filed a claim, and the claim amount was relatively large.

Supervision opinions and suggestions: be familiar with the clauses related to claims in the contract documents, make original records in time, provide realistic basis for the change of engineering quantity and the audit of engineering measurement related data, sign original vouchers, coordinate the relationship between all parties, handle claims fairly and reasonably, and finally control the project investment within 4 million yuan.

3. At present, Maiyuan 1 10kV substation is under construction. Due to the slow delivery progress of construction drawing design documents (only four volumes of drawings are in place at present), the construction unit can't organize the construction normally, and the construction organization design and commencement application report can't be submitted to the project supervision department, so we can't preside over the preparation of supervision planning and detailed rules for the implementation of professional engineering supervision.

Supervision opinions and suggestions: In this month's monthly supervision report, we have asked the owner to urge the design unit to speed up the delivery of design drawings to facilitate the standardized management of the project.

Chief supervision engineer: Jian Jun.

200 x 65438+February 27th

Evaluation by the director of the project department

A, 26 project supervision department:

1, Dai Xiaoping: civil engineering supervision engineer, with intermediate title. This year, I participated in the supervision of infrastructure projects in the new campus of Provincial Machinery Workers College, and was responsible for the on-site supervision of roads, drainage and steel structures. Inbound time is 200x July 7th, and outbound time is 165438+200 x year1October 8th.

Evaluation of personnel during supervision work: hard-working, strong sense of responsibility, competent for their own jobs, able to independently complete the project supervision work of this major, actively study the company's standard implementation documents and implement them during the project supervision process, and timely and effectively find and deal with some problems in the project implementation process.

2. Deng Hanshui: civil engineering supervision. This year, I participated in the supervision of infrastructure projects in the new campus of Provincial Machinery Workers College, and was responsible for the on-site supervision of roads, drainage and steel structures. Competition time is 200 x 165438+ 10/4.

This person's evaluation during his participation in supervision work: strong sense of responsibility, competent for his own job, comprehensive knowledge, familiarity with and mastery of project cost knowledge, and strong ability to work and live independently. This person has a relatively complete original record, which provides a realistic basis for supervision work to deal with project claims. Familiar with project supervision document management.

Second, the 32nd project supervision department

① Xia Jianguo: civil engineering supervision. This year, I participated in the supervision of Maiyuan 1 10kV substation and the office building and dormitory project of Nanchang Economic and Technological Development Zone Power Engineering Company, and was responsible for the on-site supervision of civil engineering. Entry time is 200 x165438+1October 24th.

This person's evaluation during his participation in the supervision work: strong sense of responsibility, competent for his own work, familiar with and master the professional knowledge of civil engineering. Have a deep understanding of architectural planning.

② Process: civil engineering supervision. This year, I participated in the office building and dormitory project supervision of Nanchang Economic and Technological Development Zone Electric Power Engineering Company, and was responsible for the on-site supervision of civil engineering. Entry time is 200x years165438+1October 25th.

The evaluation of this person during the supervision work: reticent, average working ability and professional skills, but strong sense of responsibility, able to bear hardships.

Chief supervision engineer: Jian Jun.

200 x 65438+February 27th

Summary of Chief Supervision Engineer's Work 5 I. Main Work and Completion of this Year

According to the company's work arrangement, this year I mainly completed the supervision of the delivery of Longkaikou Power Station, the expansion of Baoan converter station, the expansion of substation and the deicing of ground wire of converter station. Under the correct leadership of leaders at all levels of the company and with the active cooperation of all departments, I led my team to complete this year's supervision task safely, with high quality and high efficiency, and the achievements were unanimously affirmed by the construction unit and the company leaders.

Second, the highlights and shortcomings in the work

The experience summarized in the work mainly includes the following leaders' reports: First, based on design documents, national electric power construction regulations, construction contracts and supervision contracts, do a good job of two management, four control and one coordination. The second is to learn from experienced colleagues, study hard, think hard and work hard. Third, unite your own team and build a harmonious team. Fourth, boldly explore new technologies and new processes and optimize the construction scheme. Fifth, strengthen the rules and regulations of China Southern Power Grid and the company, actively promote and apply the requirements of integrated management of infrastructure projects, and carry out quality control according to the established WHS points. Seventh, standardize the supervision diary of our team and strengthen the management of engineering image data.

Among them, I think it is most important to unite our own team and build a harmonious team. As the saying goes, everyone paddles to open a big boat, and one fence has three piles, showing the strength of the team. The experience and practice in the past few years have proved that only by relying on the collective wisdom can we overcome all difficulties and show the company's image to the outside world until we finally win. The role of internet information technology in engineering. Sixth, positive consistency.

Third, the problems encountered in the work and the handling situation

At work, I often encounter some problems and troubles, but I never avoid them. First of all, I want to think calmly and understand the ideas and methods to solve the problem. I should give full play to the wisdom of the masses for difficult problems. Brainstorm and learn from others. For some problems that really can't be solved within their own ability and authority, report to the relevant leaders for instructions in time to avoid the expansion of difficulties and contradictions and strive for time to solve the problems. So over the past year, the team I led has been able to successfully complete the tasks assigned by the company. Thank you again for your concern and support. Without your care and support, it is hard to imagine.

Four. Opinions and suggestions on the company

I hope our company is as full of vigor and vitality as the rising sun in the morning. Of course, I also hope that our life is full of sunshine. In view of this, I suggest that the company: First, actively expand its business, increase revenue and reduce expenditure, improve work efficiency and optimize the human resource structure. Two, increase the cost of staff education, cultivate a group of high-quality supervision talents, and adopt some incentive policies to encourage the advanced and spur the backward. Create a positive learning atmosphere. Third, wage reform should be carried out to improve the treatment of outstanding employees with good performance, good dedication and dedication.