Current location - Education and Training Encyclopedia - Education and training - How to write a report on river cleaning
How to write a report on river cleaning
Lead: clean-up, which means thorough arrangement or treatment; Rule, clean up the territory and punish the outside world. The following is the report I brought you about river cleaning. Welcome to reading.

Chapter 1: River cleaning report: Construction management report of "Wan Li Qingshui River" project in Xinxi New Village, long gang zhen

I. Overview of the Project

Long gang zhen Xinxi New Village is located in XX Department, long gang zhen, Lin 'an City. As a tributary of Changhua River, it originated in XXX, long gang zhen, and the whole river runs through XXX and XXX villages. The project is in XXX village, and the mainstream of river engineering is x kilometers long. The rainwater collection area is x square kilometers, and the river is a mountain stream river with short source and rapid flow, large riverbed gradient and obvious seasonal variation of runoff. Rainstorm process. The original river embankment has low standard, low flood control ability and frequent flood disasters. 20xx.9.3 In this rainstorm disaster, the old dike was seriously washed away and the river was silted up, which posed a serious threat to the future flood control of the river and the village safety. All village cadres have a strong desire to regulate rivers. With the strong support of the superior water conservancy department and Longgang town government, they tried out the river regulation project, which was included in the "Wan Li Qingshui River" project in Lin 'an City in X. Entrusted the general manager of Changhua River Basin in Lin 'an City to prepare the comprehensive management plan of Xinxi New Village Basin in long gang zhen.

Two. Implementation of the project

1. Carry out the construction in strict accordance with the construction drawings and related contents, and actively contact the village, the project quality supervisor and the design department.

Department, get strong support from relevant leaders and departments and owners.

2. "Quality first" is our goal, and the construction will be carried out in strict accordance with the design standards. If there is any problem, communicate with the owner in time.

Consult the design and business departments, consciously accept the guidance and supervision, and truly improve the quality of the project.

3. Carry out the policy of "safety first, prevention first" in the construction, do a good job in safety, and ensure that a special person is responsible for safety work.

Regular inspection, found that the problem is handled in the bud in time, so that the whole project did not have any safety accidents during construction and was successfully completed.

4. Civilized construction, be polite to others. Workers respect each other, unite as one, and do the project well.

Three. construction progress

The project started in X month in X year, and all the quantities were completed in X month in X year.

Four. Self-assessment conclusion

1. The project has been completed according to the design scheme and the contents specified in the bidding documents.

2. The project quality has reached the requirements of relevant construction and acceptance specifications, standards and design documents.

3. The self-evaluation of the project of this unit is qualified.

Verb (abbreviation of verb) conclusion

The project of "Wan Li Qingshui River" in Xinxi New Village, long gang zhen has been concerned and supported by the municipal water conservancy department, long gang zhen Municipal Government and Xinxi New Village Committee, which has successfully completed all the work of the project. Once again, I would like to express my heartfelt thanks to the leaders and colleagues who care about and support this project. We will continue to work hard after the meeting.

Lin 'an Changhua Highway Engineering Team

X year x month x day

Chapter II: Report on River Cleanup; 20xx Annual Advanced Collective Application Materials for River Management in Longxian County. This year, with the correct leadership of the Water Conservancy Bureau and the care and support of the relevant departments at the provincial, municipal and county levels, the river management in our county takes the opportunity of conscientiously implementing the "No.1 Document of the Central Committee" and the spirit of the National Water Conservancy Work Conference, takes the spirit of the Sixth Plenary Session of the Seventeenth Central Committee of the Communist Party of China as the guide, and aims at rectifying the "five chaos" in rivers, ensuring the safety of people's lives and property and building people on both sides of the strait. Strengthen the supervision function, standardize the order of sand mining, and adopt propaganda, rectification, cleaning and other ways to make the management of sand mining in rivers in our county gradually embark on the track of standardization and legalization, give full play to its due social, economic and ecological benefits, and successfully complete all tasks assigned by superiors.

First, strengthen leadership and implement responsibilities.

In order to further strengthen the management of river sand mining and ensure the safety of river flood control, according to the relevant provisions of the Measures for the Administration of River Sand Mining in Shaanxi Province, the responsibility system for river sand mining management is implemented. According to the management authority, the chief executive responsibility system and the specific responsible person responsibility system have been implemented for rivers and river sections. The county magistrate is the first responsible person for river sand mining and flood control, the deputy county magistrate is the main responsible person, the water conservancy director and the river management director are the technical directors, and the river sand mining contractor is the direct responsible person. A leading group for the special rectification of river sand mining management order in Longxian County was established, with the county magistrate as the leader, the deputy magistrate in charge, the director of water conservancy and the director of public security as the deputy leader, and the members of Water Conservancy Bureau, Public Security Bureau, relevant townships, county water pipe stations and water administration supervision brigade. The office of the leading group is located in the Water Conservancy Bureau.

Strengthen inspection and supervision, once a week in urban reach and two or three times a week in key reach, strengthen river management, solve problems found in time, remove obstacles to river flood discharge and ensure the safety of river flood discharge.

The second is to carry out in-depth publicity on water laws and regulations and raise the awareness of the whole people on water legal system. In order to establish the awareness of water legal system of the whole people, improve the civilization level of water legal system of the whole people, and govern the river according to law. We take laws and regulations such as water law, flood control law, river management regulations, administrative licensing law, and sand mining management measures in Shaanxi Province as the main contents of publicity and education. We set up publicity spots 15 times in urban streets, hung publicity banners 16 times, organized publicity vehicles to go to the countryside for 6 days, and publicized towns 12. More than 300 propaganda slogans were broadcast, 26 signs prohibiting sand mining were made, 30 large-scale slogans were written, and more than 1000 slogans were posted, and 60 copies of the county government's "Implementation Measures for River Management in Longxian County" were issued and distributed again. At the same time, taking the case of river management as the teaching material, this year, the sand mining contractors were intensively studied and trained twice, and all kinds of illegal activities were really rectified and educated, and the questions raised by the masses were answered 60 times. Publicize and guide the masses to do everything according to water laws and regulations, and raise the awareness of the whole people to abide by the law.

Three, adhere to the sand mining permit system, standardize the order of river management.

In accordance with the relevant laws and regulations of the state, the national resources such as sand, gravel and earth materials within the scope of river management shall be managed according to law. Any unit or individual who enters the scope of river management for sand mining and other operations must first consciously perform the formalities for examination and approval of river sand mining licenses. In 20xx, we divided the main rivers such as Heqian River and Beihe River by region.

Characteristics and sand reserves are divided into contract sections, which is convenient for county TV stations to manage.

Announcement, open competition contract, each sand mining application unit and individual submitted the application of mining scheme respectively, and our team reviewed it in strict accordance with the requirements of river sand mining and flood control, and reported it to the Water Conservancy Bureau for approval. If more than two households apply for contracting the same sand mining bid, the Water Conservancy Bureau, the County Commission for Discipline Inspection, the Supervision Bureau, the Notary Office and the Procuratorate will participate in organizing public bidding, and the buyer will be the sand mining contractor of the bid. After open competition, 22 river sand mining management contractors, 5 mechanical sand mining contractors/kloc-0 and 7 sporadic sand mining contractors were determined, and the annual fee of river sand resources was 309,000 yuan. Conduct legal knowledge training on flood control safety for sand mining construction units involved in rivers, and strengthen river inspections in flood season. Issue rectification notices to sand mining sites and construction units with potential safety hazards, urge rectification, eliminate potential safety hazards in time, and ensure river flood control and people's lives and property safety. Make the broad masses of the people understand the necessity, management regulations and related policies of river sand mining management, strive for the understanding and support of all sectors of society on river sand mining management, and create a good river management order.

Four, strengthen water law enforcement, severely investigate and deal with illegal cases involving rivers.

This year is still a challenging year for our river management. Due to a large number of sand taken from the river in key construction projects and indiscriminate excavation and mining in individual sand yards, the riverbed has been cut. In addition, due to frequent floods this year, the task of river safety management has doubled, and people have petitioned from time to time. In view of the existing problems, we will intensify inspections and stop the "five chaos" and other illegal acts in the river in time. This year, the municipal government arranged two special river enforcement activities, led by the county government, with the participation of water conservancy bureau, public security bureau, electric power bureau, land bureau and relevant towns and villages.

Road safety inspection. In the whole year, * * * investigated and dealt with 5 cases of river-related violations, 3 cases of "two cases", 3 cases of people's letters and visits, 7 cases of various river-related disputes, 2 sand mining sites, and investigated and dealt with over-range and over-depth sand mining 10, 3 cases of river bank plugging and 25 sand piles leveling.

6.120,000 cubic meters, clean up places with river wastes of more than 3,000 cubic meters 10, and clean up sand and gravel wastes piled up within the scope of river management of more than 47,000 cubic meters. During the year, 30 applications for administrative license of river sand mining and construction projects within the scope of river management were accepted. Before the flood season comes, the main person in charge of each sand mining field has been trained and studied intensively, and the Notice on Prohibition of Sand Mining in Flood Season has been issued to all towns and sand mining fields, requiring all sand mining fields to do a good job in river safety warning in flood season and post it in a conspicuous position to strengthen duty in flood season. The director of the Water Resources Department made a televised speech on "Strengthening the management of sand mining in flood season to ensure the safety of the river in flood season". Before entering the main flood season, the Public Security Bureau and the Education and Sports Bureau jointly issued the Warning Card for River Safety and Flood Prevention to nearly 40,000 primary and secondary school and kindergarten students in the county. Strengthen river inspections in flood season, issue rectification notices to sand mining sites and construction units found to have potential safety hazards during inspections, urge rectification, eliminate potential safety hazards in time, and ensure river flood control and people's lives and property safety. According to the requirements of provinces and cities, June 1 day to September 30th is the prohibited period for river sand mining, and it is forbidden to engage in river sand mining activities. Administrative measures were taken against individual sand yards that refused to implement the ban on sand mining in flood season, which curbed illegal activities and educated the masses. In key river sections such as Heqian River and Beihe River, 20 signs prohibiting sand mining have been written, and the responsibility, scope and publicity board of sand mining management have been set up in the sand yard to accept public supervision.

In the future work, we will continue to follow the working idea of "managing according to law, promoting development through reform, accelerating pace through innovation, strengthening supervision and inspection, and deepening resource management", and take the spirit of "No.1 Document of the Central Committee" and "the Sixth and Seventh Plenary Sessions of the Seventeenth Central Committee" and Theory of Three Represents as the guidance. Take the opportunity of fully implementing the spirit of the national water conservancy work conference, pay close attention to law enforcement management, and promote the comprehensive management of rivers to a new level.