How to write the pig farm project application report? Now I'd like to introduce the pig farm project application report to you. Welcome to reading.
Text (1): Application Report of Pig Farm Project Chapter 1: Applicant and Project Overview.
1. Overview of project applicants
Including the main business, operating years, assets and liabilities, shareholder composition, major investment projects and existing production capacity of the project applicant.
2. Overview of the project.
Including the construction background, construction site, main construction content and scale, product and engineering technical scheme, main equipment selection and supporting projects, investment scale and financing scheme of the proposed project.
Chapter II Development Planning, Industrial Policy and Industry Access Analysis
1, development planning analysis
Whether the proposed project meets the requirements of the overall planning, special planning and regional planning of national economic and social development, and whether the project objectives and planning contents are connected and coordinated.
2, industrial policy analysis
Whether the proposed project meets the requirements of relevant industrial policies.
3, industry access analysis
Whether the project construction unit and the proposed project meet the requirements of relevant industry access standards.
Chapter III Analysis of Resource Development and Comprehensive Utilization
1, resource development plan
Resource development projects, including the development of metal mines, coal mines, oil and gas mines, building materials mines, water (electricity), forests and other resources, should analyze the recoverable amount, natural quality, occurrence conditions and development value of the resources to be developed and evaluate whether they meet the requirements of comprehensive utilization of resources.
2. Resource utilization plan
Including the variety, quantity and source of important resources to be occupied by the project; Comprehensive utilization plan of resources such as polymetallic and multipurpose chemical elements * * * raw ore, associated ore and oil-gas mixed ore; Through the comparative analysis of the main resource consumption indexes of unit production capacity, the advanced degree of resource utilization efficiency is evaluated; Analyze and evaluate whether the project construction will have an adverse impact on the surface (groundwater) and other resources.
3, resource saving measures
This paper expounds the main measures and schemes for saving various metallic minerals, nonmetallic minerals and water resources as raw materials in the project plan. This paper analyzes the resource consumption index of the proposed project, expounds the main measures to improve the efficiency of resource utilization and reduce the resource consumption, and demonstrates whether it meets the relevant requirements of resource conservation and effective utilization.
Chapter IV Energy Scheme Analysis
1, energy standards and energy-saving specifications
This paper expounds the national and local rational energy use standards and energy-saving design specifications followed by the proposed project.
2, energy consumption and energy consumption index analysis
This paper expounds the energy supply situation of the project location, and analyzes the types and quantities of energy consumption of the proposed project. According to the characteristics of the project, various energy consumption indicators are selected and calculated, and compared with the international and domestic advanced levels to show whether they meet the requirements of energy consumption access standards.
3, energy-saving measures and energy-saving effect analysis
This paper expounds the main energy-saving measures adopted by the proposed project to optimize the energy consumption structure and meet the relevant technical policies and design standards, and analyzes and demonstrates the energy-saving effect.
Chapter V Analysis of Construction Land, Land Requisition, Demolition and Resettlement
1, project site selection and land use scheme
Including the project construction site, area, land use status, occupation of cultivated land, etc. Analyze whether the project site selection will cause related adverse effects, such as whether it will overlap mineral deposits and cultural relics, whether it will be beneficial to flood control and drainage, and whether it will affect shipping and military facilities.
2. Rationality analysis of land use.
Analyze whether the proposed project meets the requirements of land use planning, whether the land occupation scale is reasonable, whether it meets the requirements of intensive and effective land use, and whether it is feasible to supplement the farmland occupation plan.
3, land acquisition, demolition and resettlement planning
Investigate and analyze the impact of land acquisition and demolition of the proposed project, put forward the principle, scope and method of demolition compensation according to law, formulate the resettlement planning scheme, and analyze and demonstrate whether it meets the requirements of safeguarding the legitimate rights and interests of immigrants and meeting the needs of immigrants' survival and development.
Chapter VI Environmental and Ecological Impact Analysis
L, the present situation of environment and ecology
Including the natural environmental conditions, existing pollutants, ecological environmental conditions and environmental capacity of the project site.
2. Ecological environment impact analysis
Including the types of pollutants discharged, the analysis of the discharge situation, the prediction of soil erosion, the influencing factors and degrees on the ecological environment, and the comprehensive impact on the basin and regional environment and ecosystem.
3, ecological environment protection measures
According to the requirements of policies and regulations on environmental protection and soil and water conservation, this paper puts forward control measures for possible ecological environment damage, and analyzes and demonstrates the feasibility and control effect of the control scheme.
4, geological disaster impact analysis
For projects built in geological disaster-prone areas and projects in geological disaster-prone areas, it is necessary to explain the geological disasters where the projects are located, analyze the risks of geological disasters induced by the proposed projects, and put forward defensive countermeasures and measures.
5. Special environmental impact
Analyze the possible adverse effects of the proposed project on historical and cultural heritage, natural heritage, scenic spots and natural landscapes, and put forward protection measures.
Chapter VII Economic Impact Analysis
1, economic cost-effectiveness or cost-effectiveness analysis
From the perspective of optimal allocation of social resources, the economic rationality of the proposed project is evaluated through economic cost-benefit or cost-effect analysis.
2, industry impact analysis
This paper expounds the current situation of the industry and the position of enterprises in the industry, analyzes the influence of the proposed project on the development of the industry and related industries, and demonstrates whether it may lead to monopoly.
3, regional economic impact analysis
Projects that may have a significant impact on the regional economy should be analyzed and demonstrated from the perspectives of regional economic development, industrial spatial layout, local fiscal revenue and expenditure, social income distribution and market competition structure.
4. Macroeconomic impact analysis
Projects with huge investment scale and significant impact on the national economy should be analyzed for macroeconomic impact. For projects involving national economic security, we should analyze the impact of the proposed project on economic security and put forward measures to maintain economic security.
Chapter VIII Social Impact Analysis
1, social impact effect analysis
This paper expounds the possible social impact and social benefits of the construction and business activities of the proposed project on the project location.
2. Social adaptability analysis
Analyze whether the proposed project can be accepted by the local social environment and human conditions, and evaluate the mutual adaptability between the project and the local social environment.
3. Analysis of social risks and countermeasures
This paper analyzes the social risks of various social factors involved in the project construction, and puts forward measures and schemes to coordinate the relationship between the project and the local society, avoid social risks and promote the smooth implementation of the project.
Text (II): Application Report of Pig Farm Project Part I Background Information of Large Pig Farm Project
I. Overview of large-scale pig farm projects
(a) the name of the project
(2) Project organizer
(3) Information about the units undertaking the feasibility study.
(four) the competent department of the project
(five) the content, scale and objectives of the project.
(six) the project construction site
Second, the basic situation and financial situation of the project undertaker
Including the nature of ownership, main business, sales revenue, profits, taxes, fixed assets, asset-liability ratio, and the bank's situation in the past three years.
Credit rating, basic information of the person in charge of the project and general situation of major shareholders.
The second part is the background and necessity of large-scale pig farm project construction.
This part should mainly explain the background of project establishment, the necessity of investment, the reasons for investment and the supporting conditions for project development.
First, the background of large-scale pig farm project construction
(a) the national or industry development plan
(2) The sponsor of the project and the reasons for its initiation.
(3)
Second, the necessity of large-scale pig farm project construction
Domestic and international status and technology development trend, the role and influence on industrial development, industrial correlation analysis, market analysis;
( 1)
(2)
(3)
(4)
Third, the feasibility of large-scale pig farm project construction
(1) Economic feasibility
Policy feasibility
(3) Technical feasibility
(D) the feasibility of the model
(v) Feasibility of organization and human resources.
The third part is the advantages of large-scale pig farm project
First, organizational advantages
Second, technological advantages.
Involving the source of results and intellectual property rights, the completed research and development work and pilot test, appraisal cycle, technology or process characteristics.
And its advantages compared with the existing technology or process. The breakthrough of this technology is of great significance and function to the technical progress of the industry.
Third, market advantage.
Fourth, the mode advantage.
Other advantages of verb (abbreviation of verb)
The fourth part is the product planning of large-scale pig farm project.
A, large-scale pig farm project capacity planning scheme
Two, large pig farm project product process planning scheme
(1) Selection of process equipment
(2) Description of technical progress
(3) Process flow
Three, large-scale pig farm project product marketing planning scheme
(A) marketing strategic planning
(B) marketing model
Promotion strategy
The fifth part is the construction planning of large-scale pig farm projects.
I. Construction site of large-scale pig farm project
(a) the geographical location of the large-scale pig farm project.
(2) Natural conditions for the construction of large pig farms.
(C) Large-scale pig farm project construction resources
(D) the economic situation of large-scale pig farm project construction
(5) Population of large-scale pig farm projects.
Second, the scale pig farm project civil general rules
(1) Project site and factory building construction
(2) General layout of civil engineering
(3) on-site and off-site transportation
(4) Civil works and supporting works of the project
(five) the project civil engineering and supporting engineering costs
(6) Other auxiliary projects of the project
Three, large-scale pig farm project construction environmental protection scheme
Four, large-scale pig farm project construction energy saving scheme
Five, large pig farm engineering building fire protection scheme
Six, large pig farm engineering construction and production labor safety plan
Seven. Implementation of various construction conditions
Including environmental protection, comprehensive utilization of resources, energy-saving measures, supply of raw materials and implementation of external supporting conditions; Among them, energy saving analysis
This chapter is based on the Notice of the National Development and Reform Commission on Strengthening Energy Conservation Assessment and Review of Fixed Assets Investment Projects (Development and Reform Investment [2007]).
No.2787) requires writing.
The sixth part is the organization and implementation of large-scale pig farm project.
First, the large-scale pig farm project organization
(1) organizational form
(2) Work system
Second, the labor ability and personnel training of large-scale pig farm projects.
(1) labor ability
(2) Estimation of total and average annual salary of employees.
(3) personnel training and cost estimation
Third, the implementation stage of large-scale pig farm project
(A) the establishment of project implementation management institutions
(2) Fund raising arrangements
(iii) Access to and transfer of technology
(4) Survey and design and equipment orders
(5) Construction preparation
(6) Construction and production preparation
(7) Completion acceptance
Four. Implementation schedule of large-scale pig farm project
The seventh part is the financial evaluation analysis of large-scale pig farm project.
I. Estimation of total investment of large pig farm projects
Second, large-scale pig farm project financing
The investment funds needed for construction projects can be obtained from various channels. Project feasibility study stage, fund raiser
On the basis of fixed assets investment and liquidity estimation of construction projects, the sources, channels and financing methods of funds are studied.
Choose funds with favorable conditions from them. In the feasibility study report, the funds from all sources and channels and their financing methods should be discussed one by one.
With necessary calculation forms and accessories. In the feasibility study, the following contents should be explained:
(1) Source of funds
(2) Project financing plan
Three, the scale of pig farm project investment plan
investment project
(2) Loan repayment plan
Four. Description of project financial evaluation &; Financial measurement hypothesis
(a) calculation basis and related instructions
(2) Basic setting of project calculation
Verb (abbreviation of verb) Total cost estimation of large pig farm project
direct expenses
(2) Wages and welfare expenses
(iii) Depreciation and amortization
(4) Wages and welfare expenses
(5) Repair cost
(6) Financial expenses
(7) Other expenses.
(8) Financial expenses
(9) Total costs and expenses
Six, sales revenue, sales tax and surcharge and value-added tax estimation
(1) Sales revenue
(2) Sales tax and surcharges
(3) value-added tax
(4) Estimation of sales revenue, sales tax and surcharges and value-added tax.
Seven. Profit and loss estimation and profit distribution
Eight. Estimation of cash flow
(A) the project investment cash flow estimation
(2) Estimation of cash flow of project funds
Nine, uncertainty analysis
When evaluating construction projects, most of the data used come from forecasts and estimates. Due to the limitation of data and information, in the future,
The actual situation may be different from this, which will bring risks to the project investment decision. In order to avoid or minimize risks, it is necessary to analyze whether
Uncertainty analysis is the influence of certain factors on the economic evaluation index of the project to determine the reliability of the project.
Uncertainty analysis can be divided into break-even analysis, sensitivity analysis and probability analysis according to different analysis contents and emphases. Zaike
In the feasibility study, break-even analysis, sensitivity distribution and probability analysis are generally carried out according to the project situation.
Breakeven analysis
(2) Sensitivity analysis
The eighth part is the evaluation of financial, economic and social benefits of large-scale pig farm project.
First, the financial benefit evaluation
Calculation and evaluation of internal rate of return, investment profit rate, investment payback period and loan repayment period.
Second, the economic benefit evaluation
(A) economic cost-effectiveness or cost-effectiveness analysis
(b) industry impact analysis
(c) regional economic impact analysis
Macroeconomic impact analysis
Third, social benefit evaluation.
(A) Analysis of social impact effect
(B) Analysis of social adaptability
(C) Social risks and countermeasures analysis
Part IX Annex to the Fund Application Report
Business license of enterprise
Documents related to enterprise operation (income statement, balance sheet, cash flow statement)
Loan commitment documents issued by banks (above provincial branches) or loan agreements or contracts signed;
Matching funds of local and departmental governments and other sources of funds;
Relevant supporting documents of technical sources and technical progress;
Opinions on examination and approval of environmental impact assessment documents issued by the environmental protection department;
Energy conservation, land, planning and other necessary documents;
Project approval or filing documents (within the validity period and less than two years);
For the projects that have already started, it is necessary to provide proof materials on investment completion, project progress and production;
A statement that the project unit is responsible for the authenticity of the project fund application report and the attached documents.
Zazie Hoko
;