Current location - Education and Training Encyclopedia - Education and training - Electrician self-evaluation
Electrician self-evaluation
Electrician's self-evaluation (6 general articles)

In our study, work and life, we often encounter the need to write self-evaluation. Self-evaluation greatly affects the way of communication between people, determines a person's attitude towards others, and also affects the evaluation of others. So, how to write a self-evaluation? The following is the electrician's self-evaluation (6 general comments) I compiled for you, which is for reference only and I hope it will help you.

Electrician's self-evaluation 1 I am cheerful, warm and generous, honest and steady, fond of computers, hard-working, good at innovation, dare to meet challenges, and have a good team spirit. Familiar with electronic circuit analysis, can use general electronic test instruments. Have a good understanding of power supply, PC-power, charger, transformer, household power amplifier, automobile power amplifier, electronic energy-saving lamp, etc. And be able to analyze and solve all kinds of bad problems by yourself. I like my job, I am self-motivated, I can deal with problems in my work in time, I am United with others, and I have strong self-control and pressure resistance. Familiar with the debugging and maintenance of various frequency converters, able to handle various technical problems independently, modest and cautious, highly responsible.

Proactive, adaptable, good communication and coordination skills, calm analysis and handling problems, strong team spirit and professionalism, and strong sense of responsibility for work! He has rich working experience in mechanical manufacturing and electrical control. Can independently complete the repair and maintenance of mechanical equipment, have full understanding and maintenance experience of CNC machine tools and machining centers, and be familiar with the application of frequency converter, PLC and CNC system.

During my work, I started with the initial water and electricity installation, and completed the water and electricity installation of several buildings in the company. Later, I engaged in the drawing design of water and electricity installation and served as the head of the water and electricity group. Participate in hydropower design and on-site guidance of Jianglingyuan and other buildings. Excellent completion of the whole building hydropower work tasks. The company's production and living water and electricity supply is normal, and the machinery and equipment are well maintained, which has been well received by the company's employees and appreciated by leaders at all levels.

Can adhere to the "safety first, prevention first" in long-term work practice, strictly implement safety production rules and regulations, base on their own posts, take the initiative to give play to their subjective initiative, and at the same time insist on strict demands on themselves based on standardized posts to complete production tasks with good quality and quantity.

Solid style, hard-working. Be able to carry out all the work in strict accordance with the requirements, procedures, systems and measures of the specification, persevere when encountering difficulties, take the initiative to overcome the difficulties faced, and complete all the tasks assigned by the leaders.

I have always been modest and prudent, serious and responsible in my work, and I have never changed.

At work, I have always been strict with myself, earnestly and timely completing every task assigned by the leaders, learning from my colleagues with an open mind, and constantly correcting the shortcomings in my work; For the group and the company's various systems and regulations are carefully studied and strictly implemented.

In addition, I have a strong team spirit, can coordinate and communicate well, cooperate with the heads of various departments to carry out and complete all the work of the company, and enthusiastically help other colleagues get along well with others.

Since I started my job, I have been constantly strengthening my self-cultivation, striving to improve my ideological and moral level, earnestly deepening my study of various cultures and professional knowledge, constantly exploring new knowledge, pioneering and enterprising, actively carrying out various tasks within my intellectual scope, fully fulfilling my duties as a technician and playing an exemplary role. Taking an active part in technical exchanges and scientific and technological innovation activities, Dida has done a good job of passing on, helping and leading, and fully completed various tasks and indicators assigned by superiors, which has played its due role in the company's production development. My professional and technical work since I took office is now evaluated as follows:

First, consciously strengthen theoretical study and strive to improve personal quality.

Without a firm and true political direction, there will be no positive guiding ideology. In order to constantly improve my political and ideological quality, I have been very concerned about national affairs and the situation at home and abroad in recent years, analyzing the impact of changes in the situation on enterprises, and putting this idea into practice in the production process to ensure that I always adhere to the party and enterprises in thought and action. At the same time, it also brings this concept into work and study, and constantly pursues self-improvement. Some people say that if a person wants to become a talent, he must be a man first, which makes sense. In other words: if a person wants to succeed in his career, he must first learn how to be a man! Abnormal condition is our highly technical job. We should look at things attentively, concentrate on things and learn with an open mind. There is no room for carelessness and mistakes. First of all, we should have a correct working attitude, good professional quality, be serious and responsible for our work, obey the arrangement of leaders, listen to others' opinions and suggestions with an open mind, unite colleagues, be polite to others and serve warmly.

Second, correct working attitude and play a leading role.

Since I joined the company, I have been engaged in all mechanical and electrical affairs, including safety and quality supervision and inspection during all infrastructure construction. I am well aware of the importance of electromechanical management during construction. Anomaly includes most invisible power infrastructure and projects. We should supervise and inspect at any time. When you find a problem, you have to solve it. Otherwise, the future trouble will be endless and will never be eradicated. This is a test and responsibility for our electromechanical management. As the monitor of the electromechanical class, as an electrician, I am duty-bound to my responsibilities and burdens. So in my usual work, I not only ask my team members to be careful when supervising patrols, but also know that while the iron is hot, they must be hard. I put forward some strict requirements for myself: first, I should walk in front of the workers when I encounter dirty, tired and dangerous work, and do more and more effectively than the workers; Second, when encountering technical difficulties, we should step forward and try our best to overcome them; I always insist on doing everything well and putting the interests of the company first. Including the production process after completion, sometimes dozens of electrical equipment failures, large and small, are handled against time, which has won valuable production time for the company, laid a solid foundation for the company's development, and provided a strong backing and strong guarantee for the company to create economic and social benefits. Third, I ask myself to take responsibility; I think since I am a technician, I should be better than ordinary workers in many aspects, such as business level. Allocate in the company

In the course of the task, ordinary workers should take the initiative to undertake a difficult task and should not contradict the workers. He should shoulder the burden bravely like a teacher. Usually, I don't just ask myself that. In practice, I also follow these requirements. Therefore, my performance has been well received by the company's leaders and employees, played my due role as a technician, and established a good image of technicians.

Third, strengthen business study and improve technical level.

It is my motto to be too old to learn. Today, with the continuous development of science and technology, you will fall behind if you don't study for a day. Electrical automation is an exception. No one can fully control everything. It is constantly developing and updating, just like computer software, it is updated every day and has been developing. Maybe you knew it yesterday, but it will be different in two days, and more advanced things will be put in. So I usually read more professional books as long as I have time. Over the past year, I have collected many new professional books and materials, constantly enriching myself and mastering new knowledge. For example, electrical design and drawing, electronic technology, modern frequency conversion technology, DC application in industry and so on. In the process of learning this knowledge, I learned a lot of new knowledge, such as PLC programming control principle, ABB inverter setting and control principle, SIPMOS high-power bidirectional thyristor control principle and so on, which really benefited me a lot! It not only broadens my knowledge, but also improves my technical level to a great extent, which also makes me interested in learning higher level theoretical and technical knowledge.

Electrician self-evaluation 3 In my long-term work practice, I insist on safety first, prevention first, strictly implement various rules and regulations of safety production, take the initiative to give play to my subjective initiative based on my post, and insist on strictly demanding myself based on standardized posts to complete production tasks with good quality and quantity.

In addition, I have a solid style, hard work and willingness to work. Be able to carry out all the work in strict accordance with the requirements, procedures, systems and measures of the specification, persevere when encountering difficulties, take the initiative to overcome the difficulties faced, and complete all the tasks assigned by the leaders. At the beginning of the workshop merger, the newly established Lechang power supply workshop was not fully equipped, and the office network of Guangzhou Railway Group in the workshop could not be used. In order to transmit production information in time, communication equipment is connected by itself, which ensures the smooth flow of production information. In XX, I carried out centralized maintenance of catenary for the first time. As an electrician, the compilation of centralized maintenance scheme of catenary shows tenacious professionalism from learning to application, from ignorance to gradual understanding.

Time flies, and another year has passed. I have been an electrician in our community for almost ten years. In the past ten years, I have been a happy guest of every household, which makes me very grateful for my work and allows me to take my skilled technology and serious attitude with me every time I go to every household for installation or maintenance. In this year, I did the same, and I got the kind of "Li Shifu" that every family would say with a smile when they met me on the road.

First, do practical things diligently.

I am not a person who likes to show off. My age makes me an electrician prefer to do practical things diligently. I intend to do what we electricians should do. This year, I was busy from the first month to the New Year's Eve. I can't help it Since I do this, I can't let every family in the community live a life without a bright future. As soon as everyone called, I arranged time to go, which brought light to this family. This has always been my happy feeling, and this year is no exception. This year, I always installed lamps for _ _ households, repaired light bulbs for _ _ households and modified circuits for _ _ households. These are the figures clearly recorded in my work report card, and they also record my diligence this year.

Second, be a good person seriously.

I will also help some families do some other small things when I give door-to-door service to families. This is not my job, but as an electrician with strength and brains, I can't just watch others don't know how to handle those small things. I will help others' families when I have spare time and spare ability, for no other reason than to help everyone live a better life. Of course, while helping others in this way, I also gained good comments from everyone. Everyone is happy to ask me for maintenance. Even many elderly owners in the community only want me to come to their home for maintenance, saying that I am so serious. I'm really embarrassed to comment on these words. After all, I don't want to help, but since I am evaluating the work, I will also write down my own advantages and achievements, so that I can continue to do a good job in serving the community power in a confident way.

Third, the industry has passed year after year.

Year after year, I have been an electrician in the community for almost ten years. In this decade, I want to be grateful for my ten-year career. I want to give myself an affirmation to continue to engage in this career, so that I can continue to persist in my career in the coming year. Oh, become a small sun that illuminates every household and brings light and warmth to everyone.

Electrician self-evaluation In my 5-20xx years of work, I have always been strict with myself and conscientious. Mainly from the following aspects to evaluate:

I ideological and political study and democratic management

Actively participate in various democratic activities, participate in democratic management, take the factory as the home, work hard, and do a good job in producing first-line electricians.

Second, in terms of energy saving and consumption reduction.

In terms of energy saving, I have actively applied what I have learned and made a lot of contributions to the energy saving and consumption reduction of the factory. For example, in the line transformation of the factory, it saves more than 10 million kwh of electricity for the factory every year. At the same time, the old equipment in the factory was reformed electrically, which made some old equipment rejuvenated.

Third, actual production.

For example, examples of finding and eliminating electrical faults of motors in production practice. Electrical aspects:

1, check whether the lead wire and insulation are in good condition, whether the motor is overheated, check whether the wiring is consistent with the nameplate, and whether the winding, head and tail are correct.

2. Measure the insulation resistance and DC resistance to see if the insulation is damaged. Whether the winding is open, short and grounded.

3. Power-on inspection When problems are found at the end of the above inspection, the power-on test can be directly carried out, and the three-phase voltage regulator begins to apply a lower voltage, and then gradually rises to the rated voltage.

Fourth, production safety.

1, carry out the spirit of the superior documents, improve employees' awareness of safe electricity use and enhance their sense of responsibility.

2. Implement and improve the organization system of safe electricity consumption, and improve the safety management rules and regulations.

3. Strengthen the safety management of power consumption of teams and groups, and lay a solid foundation for safety.

4, a guarantee, users should ensure their own safety and the safety of others.

Verb (abbreviation of verb) training and learning

Over the years, I have actively participated in various kinds of study and training, and strived to learn the basic knowledge and training of electricians, knowledge of power supply system, line devices, lighting devices, grounding devices, transformers, motor maintenance and repair, machine tool electrical control circuits, plc control and other related knowledge systems. Every time I study, I learn some new theories, and apply them to guiding work practice and work, and improve the power supply system and control system of the factory, which has won unanimous praise. It's been fixed. Evaluate all kinds of fault phenomena and solutions in time, and record them to guide practice and improve your professional level.

In production practice, we should adhere to the rules and regulations and deal with them in strict accordance with them. Over the years, there has not been a life safety accident caused by electrical appliances in the factory. After many technical transformations, the equipment operation is more scientific and reasonable. In my future work, I will always notice my seriousness. Of course, as an electrician, safety is always the most important. I am responsible for the safety in production as well as the factory. In the new year, I will continue to improve myself and make greater progress in thought, technology and work. I firmly believe that I will do better!

Electrician self-evaluation 6 I started working in June and was assigned to the maintenance class of electrical workshop after three-level education in the factory. I am strict with myself in my work, humbly ask my master and colleagues, and improve my professional level through the combination of theory and practice. Participated in or independently undertaken electrical equipment installation and renovation projects for many times, and was awarded the honor of advanced worker and safety production worker by the unit for many years.

1992 due to production needs, the factory newly installed two nitrogen and hydrogen compressors, and the electrical part was 1250kw/6kv synchronous motor. I was lucky enough to participate in the whole process of project installation, from the positioning of trunking, the manufacture of iron parts to the wiring of high and low cables, from the detection and wiring of motors to the installation and debugging of high-voltage switchgear, as well as the mechanical debugging of on-site control cabinets, the adjustment of auxiliary switches and the manufacture of high-voltage cable heads. For the first time, I contacted the installation and debugging of kglf- 1 1 excitation cabinet, from which I learned some technical points of synchronous motor installation and improved myself.

Being unconventional in work and daring to innovate are the advantages that an excellent maintenance worker must have. The power supply load of electrical equipment in my synthetic maintenance class accounts for about 60% of the total load of the whole plant. Only 6kv high-voltage synchronous motors have 15 motors ranging from 620kw to 3 100kw, plus 20** asynchronous motors matched with them. For a maintenance class with only six or seven people, the daily workload can be imagined, especially in summer, the synchronous excitation cabinet failure caused by the rising ambient temperature often bothers us. In the tedious and repetitive work, I noticed that the high temperature emitted by the transformer in the excitation cabinet of synchronous machine is the main reason for the system out of control and equipment failure caused by the parameter change of electronic components in the excitation control loop. Therefore, I put forward the idea of transforming the excitation cabinet to the workshop leaders. After repeated argumentation by leaders, the transformer in the original excitation cabinet was separated from the cabinet and put in a special transformer room for unified heat dissipation. In the control loop, the 38w axial fan is used to replace the original 800w fan for heat dissipation, which not only reduces the noise, but also optimizes the operating environment. So the problem that puzzled us for many years was solved. So far, we have replaced the original electronic equipment with intelligent module controller.

The continuous improvement of business level comes from the process of experience accumulation in practical work. From XX to XX, due to the expansion of production, I participated in the installation of high-voltage part of 75-ton boiler electrical appliances, 4.4m conversion project, 120**wa transformer and low-voltage distribution room installation project, 1.6m synthesis 1300kw electric furnace installation project, etc. After repeated experiments, I found a set of electrode rods for assembling the small cover of the synthetic tower. Put the electrode rod cover with mica tube into our pre-made mold, wrap it with fine asbestos rope and coat it with silica gel (high temperature resistance). Press it between the mold and the electrode rod with a 5-ton jack at one time, and then dry it. In this way, the jacking method replaces the nut tightening method. The stability of the electrode rod in the assembly process is ensured, so that it can not only withstand the impact of 320 kg high pressure, but also withstand the test of 490 high temperature. Our factory has since ended the history of hiring foreign technicians to solve problems.

In September of XX, due to my outstanding work performance, I was transferred to the maintenance class as the monitor. During this period, I organized the installation of a 6kv/850kv high-voltage motor project. In XX, our class successively undertook the installation and debugging of the newly-built upper pressure swing adsorption distribution room in the factory, including the 1600kva transformer, the newly-built 620kv/6kv displacement pump motor and the plc installation and debugging of the 90kw air compressor in the air compressor station. Because the urea process corrodes the environment and the electrical equipment is scattered, I organized personnel to rectify all the inverters in the power distribution rooms of Urea I and Urea II in XX, and set up special inverter rooms respectively, which purified the environment, reduced failures, realized the screen detection and centralized control of the operators in the general control room, made the original operation simple and easy, clear at a glance, and facilitated the maintenance and maintenance of maintenance personnel.

Enterprise production safety first. This is especially important for employees engaged in dangerous industries. It is the unshirkable responsibility of a technician to use the mastered technology to solve the problems existing in production. In the summer of XX, I found that the control switch of the sewing machine under the operator's feet was 380v power supply voltage when I was checking in the urea packaging section, so I sprouted the idea of changing the original 380v control loop to 36v safe voltage control. After the transformation, the potential safety hazard was solved and the purpose of safe production was achieved.

More than 20 years' work experience tells me that to be an excellent technician, we should not only have the spirit of hard work and continuous progress, but also have the character of boldness, prudence, flexibility and innovation. As an excellent skilled worker, I am deeply proud.

;