Introduction to the preparation stage of the first and sixth horses
This stage is from organizing the needs of six-horse management, self-evaluation, making certain preparations to making a decision to introduce six-horse management.
2. Six Sigma started the import stage.
This stage is roughly from the decision to implement six suitable horses to the first round of six suitable horses black belt training, six suitable horses green belt training and project completion, which is generally 8- 10 months.
Three, six sigma growth stage
The enterprise has obtained the preliminary results of Six Sigma, accumulated some experience, and also has a group of participants who actively implement Six Sigma management. At this time, it entered the growth period. The length of time experienced at this stage will depend on the strength of the enterprise, and the greater the strength, the shorter the time required. But the growth period usually takes l-2 years.
Four, six sigma development stage
In order to achieve sustainable development, organizations need to continuously extend six sigma management (vertical and horizontal) to all aspects of the organization.
Five, six sigma mature stage
Entering the mature stage, it is a way of thinking and working to integrate six sigma management into enterprises.
Update 1: Life! ! Such as the year of birth
Where are people?
Learn music there and pay attention to guzheng.
Wang Jianmin, male, comp