What are the other project fees included in the bill valuation?
List of other items

1, provisional amount

2. General contracting service fee

3. Day jobs

4. Provisional valuation

Extended data

produce

Bill of quantities is a summary list of physical quantities that constitute an engineering entity and can provide pre-tender estimate and tender offer according to the tender documents, construction design drawings, construction site conditions, unified engineering quantity calculation rules formulated by the state, project division and measurement units of sub-projects and relevant legal technical standards. The bill of quantities is the basis for compiling the pre-tender estimate and bidding quotation of a project subject to tender, as well as for paying the project progress payment, handling the project settlement, adjusting the engineering quantity and claiming for the project.

Bill of Quantities (BQ) came into being in 1930s of 19. In western countries, it is the responsibility of the owner appraiser to calculate the engineering quantity and provide the specialization of the bill of quantities. All bids should be based on the bill of quantities provided by the owner, so that the final bidding results can be compared. 1992, Britain published the Standard Rules for Calculation of Engineering Quantity (SMM), which is widely used in Commonwealth countries.

In international engineering construction contracting, FIDIC engineering quantity calculation rules are generally adopted when FIDIC contract terms are used. It was compiled by a committee appointed by the Royal Institute of Chartered Surveyors according to the British Rules for Calculation of Quantities (SMM) and the requirements of project and contract management. China is now in line with international practice.

200 1 10 The Management Measures for Construction Contracts and Contract Valuation, which was deliberated and adopted at the 49th executive meeting of the Ministry of Construction, came into effect on 200 1 21as the symbol, while the Construction Project, which came into effect on July 20031

computation rule

The formulation of unified engineering quantity calculation rules should follow:

1. According to the unified engineering quantity calculation rules, the calculated engineering quantity should be the actual engineering quantity (or net engineering quantity), which generally does not include the increased engineering quantity or various losses due to construction measures, and this part is considered in the unit price. Such as digging ditches and pits, can not include the increase due to slope.

Second, try to consider "one quantity for multiple purposes" in the rules. If the quantity of brick masonry is measured in square meters, it can also be used for decoration engineering.

(3) The calculation rules of quantities shall not contain provisions on the construction methods of construction enterprises. For example, in masonry, there should be no difference between artificial chiseling and blasting rocks.

4. The calculation rules of quantities should not include the contents of construction measures such as scaffolding and vertical transportation machinery.

The division of chapters and sections in the engineering quantity calculation rules should correspond to the unified classification of partial projects.