1. Regarding the characteristics of project cost, the following statement is incorrect: ().
A, a large number of engineering costs make it have a significant impact on the macro-economy.
B, product differences depend on individual differences in project costs.
C, the project cost is in an uncertain state during the whole construction period, and the actual project cost cannot be finalized until the final accounts are completed.
D, the compatibility of project cost is firstly manifested in its two meanings, and secondly in the extensiveness and complexity of project cost composition.
2. In the technical design stage of three-stage design, according to the requirements of technical design, the project cost is calculated and limited in advance by compiling () files.
A, investment estimation B, estimated cost C, revised estimated cost D, estimated cost
3, the core of project management is ().
A, contract management B, price management C, time limit for a project management D, quality management
4. For some projects that are in urgent need of the national economy and people's livelihood, such as projects where reasonable evaluation of the national economy and financial evaluation are not feasible, ().
A, B should be passed, C should be denied, D should be denied generally, and the scheme should be reconsidered.
5. The delivery category of imported equipment can be divided into inland delivery category, destination delivery category and port of shipment delivery category, and the price including freight is ().
a、FOS B、C&F C、CIF D、FOB
6, the construction project through the allocation of indefinite land use rights should be paid ().
A. Compensation for land acquisition and demolition B. Land acquisition fee
C, land compensation fee d, land use right transfer fee
7, research test fee does not include ().
I. Labor and material costs required for self-investigation and test
B. Fees for the use of test equipment and instruments required for self-investigation and testing.
C inspection and appraisal fees for imported equipment paid to the commodity inspection authorities according to regulations.
D, entrust other departments to investigate and test labor costs, material costs, test equipment and instrument use fees.
8. A project got a loan of 20 million yuan from an investment company, with an annual interest rate of 8% and quarterly interest. The loan contract stipulates that the borrower shall repay the principal and interest in equal amount at the end of each year within 10 years after the loan, and pay it off in 10 years. The annual repayment amount is (*-+) ten thousand yuan.
a、2 16.48 B、298.06 C、30 1.29 D、302. 10
9, about the economic evaluation of construction projects, the following statement is wrong ().
Financial evaluation is used to judge the financial feasibility of the project.
B. National economic evaluation is used to evaluate the economic rationality of the project.
C. financial evaluation is the basis of national economic evaluation.
D, financial evaluation is the main basis to determine whether the construction project is feasible.
10, which reflects the cash receipts and payments of each year in the calculation period of the project, is used to calculate various dynamic and static evaluation indicators, and the basic statement for analyzing the financial profitability of the project is ().
A, income statement B, cash flow statement C, source and use of funds statement D, balance sheet
1 1, in the economic evaluation of construction projects, when the proposed project is considered acceptable, what is the net present value index at least ()?
A, equal to zero b, greater than zero c and less than zero d, it doesn't matter.
12, the economic evaluation of the construction project reflects the actual profitability of the project, but also shows that the evaluation index of the highest interest rate that the project can bear is ().
A, net cash rate of return B, capital rate of return C, industry benchmark rate of return D, internal rate of return
13, the attribute of the valuation basis of the engineering quota and index compiled by the relevant institutions established by the government is ().
A, mandatory b, instructive c, referential d, empirical
14. The following statement about our province's version 03 pricing rules is wrong ().
First, all large and medium-sized construction projects that use state-owned capital investment or state-owned investment must be priced by bill of quantities.
B, the construction project cost pricing mode is divided into two modes: bill of quantities pricing and quota pricing.
C, the bill of quantities valuation mode adopts the unit price method of quantities.
D, the comprehensive unit price method of partial project unit price adopts the unit price of all expenses except fees and taxes.
15, in the method of economic evaluation with uncertainty analysis, () is only used for financial evaluation.
A, break-even analysis B, sensitivity analysis C, probability analysis D, factor analysis
16. After the project contract price adjustment occurs, the time limit for the contractor to submit the contract adjustment report shall be implemented according to the contract. If there is no agreed time limit in the contract, the time limit shall be () days.
a、7 B、 10 C、 14 D、 15
17. Among the following expenses, the one that does not belong to the night construction fee is ().
A, night construction increase fee b, night subsidies
C. Amortization fee for night construction lighting equipment D. Electricity fee for night construction lighting.
18. There are many calculation methods for contract price adjustment caused by price fluctuation, among which () is relatively convenient, with small deviation and more practical application value.
A, engineering cost index adjustment method B, adjustment formula method
C, drawing compensation method D, proportional coefficient method
19, inspection and test fees include ().
A, the cost of materials and chemicals consumed by self-built laboratory for testing.
B, new structure, new material test fee
C. The cost construction unit shall inspect the materials with factory certificate.
D, the cost of destructive test of components
20, the driver's working day labor costs are included in ().
A, labor cost b, machinery cost c, construction technical measures cost d, construction organization measures cost.
2 1, the cost of living structures that the construction enterprise must set for building construction belongs to ().
A, construction technical measures fee b, safety construction fee c, temporary facilities fee d, enterprise management fee
22. If the proportion of shortening the construction period is above (), the measures and corresponding expenses shall be approved by the expert committee.
a、 15% B、20% C、25% D、30%
23, about engineering general contracting, the following statement is wrong ().
A, according to the provisions of the Ministry of construction orderNo. 124, the general contractor can charge the general contracting service fee to the subcontractors according to 1%-3% of the subcontract project cost.
B the general contractor shall complete temporary roads, fences, etc. It shall be undertaken by itself within the scope of the project, and no fees shall be charged to the subcontractors.
C, the general contractor shall not charge the construction unit for subcontracting scaffolding, vertical transportation machinery and other measures.
D completion data related to subcontracted projects are included in the general contracting service fee.
24, the construction project cost tax should be calculated according to the tax rate stipulated in the construction project cost quota, and the calculation base of tax amount is ().
A, direct cost B, direct cost+indirect cost C, direct cost+indirect cost+profit D, labor cost+machinery cost
25, the following expenses do not belong to the basic reserve fund project is ().
A, increased design change cost B, increased local foundation treatment cost
C. Adjustment of other costs of engineering construction D. Costs of measures taken to prevent natural disasters
26. The one-time investment at the beginning of the project is 6,543,800,000 yuan, the annual income during the calculation period is 2,500,000 yuan, the calculation period is 5 years, and the benchmark rate of return is 654.38+00%. The project is judged by net present value ().
A, feasible B, infeasible C, acceptable D, uncertain
27, the comprehensive unit price in the contract due to changes in quantities, unless otherwise agreed in the contract, the implementation of the original comprehensive unit price is ().
First, the new bill of quantities caused by missing items in the bill of quantities.
B, due to design changes caused by the new bill of quantities project
C. Increase or decrease of quantities beyond the scope agreed in the contract caused by design changes.
D, increase or decrease of quantities within the scope agreed in the contract caused by design changes.
28, the relationship between mechanical overhaul cycle and life-long overhaul times is ().
A, overhaul period = overhaul times within service life b, overhaul period = overhaul times within service life-1.
C overhaul period = overhaul times within service life+1 D, which cannot be determined.
29, () is the basic norm of engineering construction quota.
A, construction quota b, budget quota c, budget quota d, budget indicators
30, as one of the basis for denying a project or deciding whether to continue, the main function of investment estimation is ().
A, planning stage B, project proposal stage C, feasibility study stage D and review stage
3 1, from the perspective of management organization, the project cost information can be divided into ().
A, systematic and unsystematic B, documented and undocumented C, macroscopic and microscopic D, fixed and mobile.
32, the use of engineering construction quota to calculate the project cost in the form of price, ().
A, between the national guidance price and the national adjustment price. B, it belongs to the national adjustment price.
C, between state price and the national guidance price D, belongs to the national guidance price.
33, the level of budget quota should be ().
A, social average reasonable level B, social average advanced level
C, social reasonable level D, social advanced level
34, technical jobs are not included in the labor quota and must be considered in the budget quota of employment, belong to ().
A, basic labor B, auxiliary labor C, over-distance labor D, and differences in labor scope
35, construction engineering materials consumption, does not constitute an engineering entity amortization materials belong to ().
A, main materials B, auxiliary materials C, turnover materials D and other materials
36, in accordance with the relevant provisions, the residual rate of small and medium-sized machinery is ().
a、2% B、3% C、4% D、5%
37. The compilation of the completed settlement book varies with the form of the contract. The following statement is correct ().
A. If fixed lump sum contract is adopted, the contract price is the settlement price, and settlement book is not prepared.
B if lump sum contract with adjustable price is adopted, on the basis of the original contract price, for all the changed prices and quantities, the increased or decreased items will be regarded as settlement book.
C, using unit price contract, according to the actual completed quantities, using the method of budgeting, compiling settlement book.
D. If the cost plus compensation contract is adopted, the actual cost of the book item shall be calculated as the settlement price according to the actually completed engineering quantity and the agreed cost calculation method.
38, the feasibility study stage investment estimation error rate is ()
A, ≥ 30% b, within 30% c, within 20% d and within 10%.
39, when the preliminary design depth is shallow, can't accurately calculate the expanded part of the quantity, but the technology used in the project is relatively mature and there are corresponding project budget indicators, you can use () to prepare the construction project budget.
A, budget estimate index method B, budget estimate quota method C, similar engineering pre (conclusion) algorithm D, expanding unit price method
40, construction contract documents interpretation order is ().
First, the bid-winning notice, contract agreement, tender and accessories
B, special terms and conditions of construction contract, general terms and conditions of construction contract, tender and its attachments
C, tender and accessories, drawings, bill of quantities
D, construction contract agreement, project quotation, drawings
4 1, when the construction project is completed and accepted, in order to identify the project quality, it is necessary to excavate and repair the concealed works, and the expenses shall be paid from ().
A, the construction unit management fee b, the construction unit basic reserve funds
C, the construction unit reserve price d, survey and design fees
42, the employer requires the contractor to complete the sporadic project outside the contract, the contractor shall, within () days after accepting the employer's request, submit a construction visa to the employer, which covers the number of employees, the number of mechanical machine-teams, the unit price, the materials used and the amount.
a、3 B、5 C、7 D、 10
43. The model text of the construction contract of the construction project stipulates that within () days of the claim, the contractor shall send a notice of claim intention to the engineer.
a、28 B、 10 C、 14 D、56
44, in the project guarantee, the guarantor to provide guarantee is the fundamental purpose of ().
A, transfer risk B, meet the requirements of the other party's credit guarantee
C, protect their own economic interests D, control risks
45, the following does not belong to the productive construction project is ().
A, water irrigation system B, large-scale logistics center C, thermal power plant D, sanatorium
46, citizens and legal persons can implement civil legal acts through agents, the characteristics of the agent does not include ().
A, the agent to implement civil juristic acts as a function.
B the agent engages in civil legal acts in the name of the principal.
C. The agent independently expresses his will within the scope of agency authority.
D the legal consequences of agency behavior shall be borne by the principal.
47, check the tender offer, review the correctness of all quotation data calculation, analyze the rationality of the quotation composition, etc. It belongs to the tender documents ().
A. Technical review B. Commercial review C. Technical compliance review D. Commercial compliance review
48, for equipment installation project, should organize trial operation, including (), organized by the contractor.
A, single machine no-load test run b, single machine load test run c, linkage no-load test run d, linkage load test run
49, construction engineering category is based on the scale of the unit project, height, span, number of layers and the difficulty of construction technology, the following projects, the calculation of the number of layers is ().
A, attic floor B, the top floor with an area less than 30% of the standard floor
C, 2.3m high basement D and 2. 1m high technical equipment floor.
50, look from the nature, the project cost management institutions according to the application of both parties * * *, the settlement document of dispute mediation is ().
A, folk mediation behavior b, judicial mediation behavior c, administrative mediation behavior d, depending on the nature of the mediation project.
5 1. According to the Measures for the Administration of Construction Project Cost Valuation in Zhejiang Province, the provincial construction project cost management institution may entrust () to prepare supplementary valuation basis.
First, the municipal construction project cost management institutions
B, engineering cost consulting enterprises
C, bidding agency enterprises
D, municipal construction project cost management institutions or related engineering construction units
52, about the limitation of action, the following statement is correct ().
A, China's "General Principles of Civil Law" stipulates that the limitation period for requesting protection of civil rights from the people's court is 1(2) years.
B. If the body is injured and claims compensation, the limitation of action shall be 1 year.
3. If a lawsuit is brought for a dispute over an international contract for the sale of goods, the limitation period of action shall be 2 years.
D. The limitation of action for applying for arbitration for disputes over technology import contracts is 2(4) years.
53. Shortening the construction period and increasing the project cost should not be taken at the same time ().
A, night construction increase fee b, civilized construction measures fee c, environmental protection fee d, secondary loading and unloading fee.
54. If the business unit of the cost engineer changes, it shall go through the change formalities within () days from the date of change.
A, B, C, D, 30
55. A project borrowed RMB 6,543,800,000 from the bank, with an annual interest rate of 654.38+02% and a loan period of 5 years. After 5 years, it is required to repay the principal to the bank () 10000 yuan.
a、 1600 B、 1762 C、 1974 D、 1573
56, a factory orders machinery and equipment, to the bank loan, the annual interest rate is 8%, monthly interest, its effective annual interest rate is ().
a、9.6% B、8.30% C、8.24% D、8.27%
57, in the bill of quantities valuation mode, ().
A, the tenderer shall bear the risk of engineering quantity calculation, and the bidder shall bear the risk of unit price.
B, the bidder shall bear the risk of engineering quantity calculation, and the tenderer shall bear the risk of unit price.
C, the tenderer shall bear the risk of engineering quantity calculation and unit price risk.
D, the bidder shall bear the risk of engineering quantity calculation and unit price risk.
58, as the base of the mechanical fee does not include ().
A, depreciation expense b, major repair expense c, frequent repair expense d, installation and disassembly expense of large mechanical equipment.
59. The materials allocated by the contractor to the contractor belong to prepaid nature. After the implementation of the project, with the gradual reduction of the main material reserves needed for the project, it will be deducted in the form of offset ().
A, material preparation advance payment limit b, project price c, project loan d, material preparation liquidity.
60, in accordance with the "construction engineering quantity settlement unit valuation standard" regulation, the bill of quantities has ().
A, must be entrusted by the tenderer with the corresponding qualification of intermediary institutions.
B, unit price method of quantities and comprehensive unit price method can be used for pricing.
C, is an integral part of the tender documents.
D, by the general description and partial bill of quantities.
Second, multiple-choice questions (***30 questions, 2 points for each question, ***60 points. Fill in the number of the correct answer option in the corresponding position on the answer sheet. Choose the right score, choose the wrong score; If there are few error-free items, each option will get 0.5 points. )
1, the control function of project cost is shown in ()
A, quality control B, schedule control C, investment control
D, control cost E, control safety
2. When using FOB port of shipment, the seller's responsibilities include ().
A. Be responsible for loading the goods on the designated vessel at the port of shipment stipulated in the contract within the specified time limit.
B bear all expenses and risks before the goods are shipped.
C, responsible for chartering or booking space, and paying the freight.
D, responsible for handling insurance and paying insurance premiums.
E, responsible for providing relevant shipping documents.
3, according to the principle of capital preservation, when the project is completed and put into production, fixed assets investment, investment direction adjustment tax and construction period interest form ().
A fixed assets b, current assets c, intangible assets d, deferred assets e and tangible assets
4, according to the goal of financial evaluation, financial evaluation indicators can be divided into ().
A, static indicator B, dynamic indicator C, indicators reflecting profitability
D, indicators reflecting solvency E, indicators reflecting foreign exchange balance ability
5, the following expenses belong to the price reserve, including ().
First, the cost of measures taken to prevent natural disasters
B, labor, materials, equipment, construction machinery price difference.
C, when the completion inspection and acceptance, pay the necessary excavation and repair costs of concealed works to identify the quality of the project.
D. Adjustment of construction and installation costs and other construction costs
E. interest rate, exchange rate adjustment and other expenses increase.
6. The project setting rules of the bill of quantities are formulated to unify the bill of quantities () and are the basis for compiling the bill of quantities. Project characteristics
A, project name B, project work content C, project code D, measurement unit E, and engineering quantity calculation
7. The project cost information is the combination of all the information about the characteristics, states and changes of the project cost. Its characteristics are regionality, diversity and (). Regional, diverse, professional, systematic, dynamic and seasonal.
A, professional B, dynamic C, systematic D, seasonal E, compatibility
8. Quota consumption standard is the standard that specifies the quantity of labor, materials and machinery affecting the consumption of basic structural elements in qualified quality unit projects, and is the basis for calculating the price of construction and installation products. The so-called basic structural elements usually refer to ()
A, division project b, subdivisional work c, decoration project d, structural engineering e, structural members
9, the purpose and function of the budget quota includes ().
A, it is the basis for preparing the main material plan of the construction project; B, it is the basis for the construction unit to analyze economic activities.
C, is the basis of compiling budget estimate quota D, is the basis of compiling construction organization design.
E, is the basis for the preparation of budgetary estimate indicators.
10, the main factors affecting the labor price of construction and installation workers are ().
A, social average wage level B, labor consumption level C, living consumption index
D. Changes in supply and demand in the labor market E. Government's social security and welfare policies
1 1, the unified classification and coding of building and installation materials in Zhejiang Province and the base price in 2003 adopted the hierarchical classification and coding system. The code is divided into five levels (16-bit code length), in which the feature code contains the following information of the material ().
A, name b, brand c, specification d, model e, unit of measurement.
12. The preparation method of investment estimate in the preliminary feasibility study stage can be ().
A, production capacity index method B, capital turnover rate method C, proportional coefficient method
D, index estimation method E, simulated budget estimation method
13. Generally, the reimbursable expenses can include the following aspects ().
A. Labor cost B, material cost C, expenses D, loan interest E, and profit
14, the final accounts of small construction projects generally include ().
A.b. Statement of completed financial statements
C. List of properties delivered for construction projects
E. Summary of final accounts of completion
15, the role of consulting and intermediary services in the main body of the construction market includes ().
A, coordinate and constrain the behavior of market players
B, to ensure fair trade and fair competition
C, overall arrangement of each link in the construction process.
D, promote market development, reduce transaction costs and improve efficiency.
E. Supervise market activities and maintain normal market order.
16, according to the nature of construction projects, capital construction projects can be divided into ().
A, new project b, expansion project c, relocation project
D. Reconstruction project E. Restoration project
17, about the difference and connection between the bill of quantities pricing model and the quota pricing model, the following statement is correct ().
First, all large and medium-sized construction projects that use state-owned capital investment or state-owned capital investment must be priced by bill of quantities.
B, bill of quantities valuation mode is suitable for construction project bidding.
C. Quota pricing mode can only be used for non-tendering construction projects.
D, bill of quantities project, basically as a "comprehensive entity" to consider.
E, the quota valuation project contains a single content. Usually, a project contains only one project content.
18. Among the following expense items, () belongs to the labor cost.
A, the wages of production workers during their study b, the wages of production workers who have been sick for more than 6 months.
C, production workers' travel expenses for visiting relatives d, production workers' basic salary.
E, the basic salary of management personnel
19. The social security fee in the construction and installation project cost includes ().
A, labor insurance b, endowment insurance c, property insurance
D unemployment insurance e medical insurance
20, in the following projects, compared with the "construction engineering bill of quantities valuation standard", for the preparation of the bill of quantities valuation guide new projects include ().
A, project code b, project name c, project content
D, the main content of the combination e, the corresponding quota Buddhism.
2 1, the project cost index is used to study the following () problems.
First, analyze the price trend and its reasons
B, estimate the impact of project cost changes on the macro-economy.
C, an important basis for project evaluation and settlement by both parties.
D, as a reference for the preparation of fixed assets investment plan, used for construction cost analysis.
E, unit production capacity investment analysis.
22, the developer has any objection to the quality of the project, the following situation belongs to the project quality dispute (), according to the contract warranty.
A, has stopped work B, has stopped construction C, has been completed without acceptance but actually put into use.
D, completed but not accepted and not actually put into use E, completed and accepted.
23, about the warranty fee, the following statement is correct ().
A, the contractor is not in accordance with the relevant national norms, resulting in quality defects, the contractor shall be responsible for the repair and bear economic responsibility.
B, quality defects caused by design reasons, the design unit should bear the economic responsibility and be responsible for maintenance.
C, quality defects caused by unqualified building materials, the contractor shall bear economic responsibility.
D, losses caused by improper use of the unit shall be borne by the unit.
E, due to the earthquake, flood, typhoon and other irresistible reasons caused by the damage, the construction unit is responsible for handling.
24, the characteristics of engineering insurance include ().
A, the underwriting business is complex, with high professional requirements; B, information asymmetry in the field of engineering insurance.
C, engineering insurance can't be underwritten. D, insurance clauses can't be changed.
E. the subject matter insured is incomplete at the time of insurance.
25, according to the nature and characteristics of the industry, engineering construction projects can be divided into ().
A. Competitive projects B. Basic projects C. Public welfare projects
D, production project e, non-production project
26, the tender documents in any of the following circumstances, the tenderer will not accept ().
A, there is no unit seal B, it is not sent to the designated place C, and it is not sealed according to the requirements of the bidding documents.
D, late delivery e, no signature or seal of the legal representative or its authorized agent.
27, about the construction project construction cost, the following statement is correct ().
A, in the project valuation, the environmental protection fee should not be lower than the lower limit of the flexible interval rate.
B. When preparing the budget estimate, the comprehensive rate shall be calculated according to the intermediate rate of the elastic interval.
C, the comprehensive cost rate of housing renovation project is multiplied by the coefficient of 0.8 according to the second-class rate of corresponding new projects.
D for the project based on "labor cost+machinery cost", when calculating the comprehensive unit price, take "direct cost+measures cost+comprehensive cost" as the calculation base and multiply it by the corresponding rate to calculate the cost.
E, preparation of construction drawing budget, construction organization measures fee should be calculated according to the median rate of flexible interval.
28, according to the classification of data duration, indicators can be divided into ().
A time index b, daily index c, monthly index d, quarterly index e and annual index
29, the characteristics of engineering construction quota include ().
A, science B, system C, advanced D, unified E, compatibility
30, the construction project budget indicators include ().
A, mechanical equipment and installation engineering budgetary estimate index B, heating engineering budgetary estimate index
C, water supply and drainage engineering budget indicators D, general civil engineering budget indicators
Budget indicators for purchasing expenses of tools and production furniture.
Budget estimate indicators of construction projects: civil engineering, water supply and drainage engineering, heating engineering, communication engineering and electric lighting engineering.
Budget estimate index of equipment installation project: purchase cost of mechanical equipment and installation project, electrical equipment and installation project, tools and equipment and production furniture.
Reference answer of basic theory of engineering cost
First, multiple choice questions
1、B 2、C 3、A 4、D 5、B 6、A 7、C 8、C 9、D 10、B
1 1、A 12、D 13、B 14、C 15、A 16、C 17、A 18、B 19、A 20、B
2 1、C 22、D 23、A 24、C 25、C
26、B 27、D 28、C 29、A 30、A
3 1、A 32、A 33、A 34、B 35、C
36、C 37、C 38、C 39、A 40、C
4 1、B 42、C 43、A 44、B 45、D
46、D 47、B 48、A 49、C 50、C
5 1、D 52、B 53、A 54、D 55、B
56、B 57、A 58、D 59、B 60、C
Second, multiple choice questions
1、CD 2、ABE 3、ACD 4、CDE 5、BDE 6、ACDE 7、ABCD 8、BE 9、BCD 10、ACDE
1 1、BCDE 12、CD 13、ABDE 14、DE 15、ABDE
16, ABCE 17, Abd 18, AD 19, BDE 20, Germany.
2 1、ABC 22、CE 23、ADE 24、ABE 25、ABC
26、BCD 27、ABE 28、ACDE 29、ABD 30、BCD