Chapter I General Provisions
Article 1 In order to better implement the safety production policy of "safety first, prevention first and comprehensive treatment" and improve the safety production management and civilized construction level of building construction, these measures are formulated in accordance with the requirements of relevant laws and regulations on safety production such as the Construction Law of People's Republic of China (PRC) and the Regulations on the Safety Production Management of Construction Projects, combined with the actual situation of this province, and better reflect the exemplary role of standardized construction sites for provincial safety production and civilized construction.
Article 2 The evaluation basis of provincial standardized construction sites with safe production and civilized construction (hereinafter referred to as "standardized construction sites with safe production") is the Standard for Safety Inspection of Building Construction (JGJ59-99) and relevant national and local standards, norms and regulations. The safety production management and civilized construction in the construction process should reach the advanced level in the province, which has good economic and social benefits and is the highest award for construction safety in our province.
Chapter II Forecasting Procedures and Conditions
Article 3 The provincial safety production standardization sites in Sichuan Province shall implement the forecasting system. After the project starts to meet the requirements of standardized construction of safety production, the general contractor shall fill in the Prediction Form of Standardized Site of Safety Production in Sichuan Province (Annex 1) and create the Work Plan of Standardized Site of Safety Production in Sichuan Province, which shall be submitted to the provincial construction engineering quality and safety supervision station for the record after being approved by the municipal and state construction administrative departments where the project is located.
Article 4 The quality and safety supervision station of provincial construction projects awarded the bronze medal of "Striving for the Standardization Project of Safe Production and Civilized Construction in the Province" uniformly produced by the Provincial Construction Department to the predicted projects, and the reporting project department must hang the bronze medal in a conspicuous position on the construction site and accept social supervision. The municipal and state construction administrative departments shall strengthen the daily supervision, inspection and guidance of the predicted projects.
Fifth forecast projects should reach the following scale
(a) the project where the people's government of the city or state is located
1 4,000 square meters and above single residential projects;
2, single public buildings and complex buildings of 8000 square meters and above;
3, single industrial building 8000 square meters and above;
4. More than1.5000 stadiums (including1.5000 stadiums);
5. More than 2,000 gymnasiums (including 2,000);
6./kloc-swimming pools and art galleries with more than 0/000 seats (including 1000 seats);
7, more than 500 (including 500) theaters (or multi-function hall);
8, a single building area of 2000 square meters (including 2000 square meters) above the municipal bridge;
9. The investment scale of the project is 10 million yuan or more;
10, a representative landmark project.
(two) the project where the county people's government is located
1, 2000 square meters and above single residential projects;
2, single public buildings and complex buildings of 4000 square meters and above;
3, single industrial buildings of 4000 square meters and above;
More than 4.8000 seats (including 8000 seats);
5. 1000 (including 1000) gymnasium;
6, more than 500 (including 500) swimming pools and art galleries;
7. More than 300 theaters (or multi-function halls);
8, a single building area of 2000 square meters (including 2000 square meters) above the municipal bridge;
9. The investment scale of the project is more than 5 million yuan;
10, a representative landmark project.
Chapter III Procedures and Conditions for Project Review
Article 6 The predicted project shall submit the application materials for reexamination after the main body is completed and before entering the decoration project, and submit them to the Sichuan Provincial Construction Engineering Quality and Safety Supervision Station after being signed by the local construction administrative department.
Seventh Sichuan provincial safety civilized construction standardization site review application materials include:
I. Review the general catalogue of application materials
Two, "Sichuan province safety civilized construction standardization site prediction table" and "Sichuan province safety civilized construction standardization site review application form" each (Annex 2).
Three, project plan, construction permit, construction enterprise qualification certificate, enterprise safety production license, enterprise safety production performance evaluation manual, contract, project site management personnel with corresponding management qualification certificate copy.
Four, the general situation of the project and the written materials introducing the safety management of the project.
Five, such as the safety area won the award of the relevant professional departments, provide a copy of the award certificate.
Six, can reflect the construction site safety and civilized construction related photos or videos.
Seven, the local construction administrative departments in accordance with the "Interim Measures" of Sichuan province construction site supervision and inspection at all stages of inspection and evaluation and put forward suggestions.
Article 8 After receiving the application materials for review, Sichuan Construction Engineering Quality and Safety Supervision Station shall organize relevant safety technical management personnel and experts to form a review team to review the safety production conditions at the project construction site.
Ninth project site review includes the following aspects:
First of all, listen to the introduction of the recommended units and reporting units on the safe and civilized construction of the project.
The second is to consult the relevant information of safe and civilized construction, as well as the adoption of new technologies, new processes and new materials.
Three, check the use of "safety production and civilized construction measures fee".
Four, check the site, and according to the "building construction safety inspection standard" JGJ59-99 on the construction site score.
Chapter IV Project Approval and Certification
Article 10 After the project review, the review team shall write a written review report and submit it to the Sichuan Provincial Construction Engineering Quality and Safety Supervision Station for review. After passing the review, it shall be submitted to the Provincial Construction Department for approval.
Eleventh all qualified sites should continue to organize construction in accordance with relevant national norms and standards until completion. During this period, if the safety production conditions of this project are reduced, and serious accidents or major quality accidents occur, the qualification for appraisal will be cancelled, and the bronze medal of "Striving for a provincial-level standardized construction site for safe production" will be immediately recovered.
Article 12 After the completion and acceptance of the project, the qualified project is judged to be excellent. The general contractor shall fill in the Application Form for the Identification of Sichuan Provincial Standardized Work Safety Site (Annex 3), and recover the bronze medal of "Striving for Sichuan Provincial Standardized Work Safety Site" and issue the Sichuan Provincial Standardized Work Safety Site Certificate after approval by the Ministry.
Chapter V Awards
Thirteenth provincial construction department announced the list of winners every six months and informed recognition. At the same time, in accordance with the provisions of the Interim Measures for the Dynamic Management of Safety Production Licenses of Construction Enterprises in Sichuan Province, 30 points will be awarded to the enterprises commended above. Relevant regions, departments and award-winning enterprises may give spiritual and material rewards to the award-winning enterprises and relevant personnel according to the actual situation of the region, department and enterprise. The bidding departments of local construction projects shall reward the successful construction enterprises with extra points or other means in the bidding.
Chapter VI Supplementary Provisions
Fourteenth approach by the provincial construction department is responsible for the interpretation of.
Fifteenth these measures shall come into force 30 days after the date of issuance, and the Notice of Sichuan Province on Implementing the Measures for the Evaluation of Provincial Safety Production Standardization Sites (Sichuan [2000] No.0304) shall be abolished at the same time.
Safe and civilized construction
In engineering construction, in order to make the project run safely and smoothly, give full play to the work enthusiasm of every employee as much as possible, ensure the safety of every production worker, and achieve "come to work happily and go home safely", it is necessary to strengthen the safety management of the construction site, and the project department and the construction operation department should work together to create a good, safe and civilized working environment.
1, the project intends to formulate regulations on safe and civilized production in strict accordance with the requirements of Nanjing Construction Safety Supervision Station, and implement necessary safety facilities, protection and various signs. , to ensure that meet the requirements of standardization, so that everyone who enters the site has enough sense of security and devote themselves to production and construction.
2, the project department set up a safety leading group with the administrative manager as the team leader, the head of each operation department as the deputy team leader, and the safety officer as the team member, responsible for the daily safety production command, supervision and implementation. Adhere to the daily arrangement, daily inspection, daily record and daily results, evaluate every Monday and summarize every month, so that mistakes must be corrected and never slack off; When someone is working on the construction site, we will have a safety officer on the site. It is necessary to find hidden dangers in time, deal with them in time, nip in the bud, and do not cause any safety accidents.
3. For all personnel who enter the site construction, education on admission safety instructions must be carried out, especially for those construction personnel with weak safety awareness and low educational level, patient and meticulous education should be carried out to ensure that they can understand and do it, rather than become a mere formality. According to the characteristics of the unit price project on site, the project department will organize them to learn in various forms, ask questions about the knowledge of safe production, and even take exams to do a good job in safe and civilized production.
4. The safety management personnel entering the construction site must be trained and hold relevant certificates, have a strong sense of responsibility, be able to bear hardships and stand hard work, and be quick-sighted (can find problems), diligent (patrol the site more) and diligent (talk more when problems are found), and earnestly do their jobs. Special types of construction personnel (electrician, tower crane driver, welder, scaffolder, mechanical operator, etc.). All personnel entering the construction site must receive formal training from relevant departments, hold a work license, be familiar with all kinds of safety operation procedures, and be able to maintain machines and tools frequently to ensure that the machinery works well and does not work in spite of illness.
5, the focus of production safety is to do a good job of safety technical disclosure in advance. In the disclosure of the construction technology and quality requirements of each division and subdivisional work, safety technical disclosure, construction operation precautions and whether scaffolding and protective facilities meet the requirements of safe operation must be done well; Don't hurt yourself or others during construction.
6, in the process of construction operation, strengthen the inspection work, strengthen the process control. Problems found on site can be corrected in time to eliminate unsafe hidden dangers in construction.
7. The project department plans to organize site management personnel to conduct a major inspection on the site safety production and civilized construction every Friday afternoon, score against the standardized site score sheet, and carry out the construction operation competition. Score less than 85 points, education punishment, ordered deadline for rectification; Those with 95 points or above will be rewarded accordingly. Take education as the purpose and rewards and punishments as the means to improve the self-management level of the construction team and set off a new climax of safe production and civilized construction.
8. The safety goal of this project is no major accidents, and the general accident frequency is controlled below 2%. Once a safety accident (the loss is below 1000 yuan) is found in any workplace during construction, the person in charge of the workplace must be punished and the safety officer replaced.
9. Implement a level-to-level, individual safety management system, earnestly perform their respective work, ensure the management level, and strive for standardized construction sites.
A, construction safety and construction civilization
Creating a civilized construction site, carrying out civilized construction and civilized operation are the basic work to ensure safe production and establish a good image of the enterprise. Practice has proved that security leads to civilization and civilization leads to security. Nowadays, many construction enterprises have realized that it is necessary to create a civilized construction site and take civilized construction and civilized operation as a major basic work to ensure the safety of construction and production and establish a good image of the enterprise. It is not only a highly managerial job, but also a highly technical job to create a civilized construction site and carry out civilized construction and civilized operation. At the same time, employees are also required to have the corresponding safety and civilized production quality as their foundation. Therefore, it includes the construction and development of management, technology and staff quality training, and safe and civilized construction technology is an important part of it.
Second, create civilized construction site standard management regulations
(1) Provisions on "Safe Production"
1. Improve all kinds of safety management accounts, and strengthen the information of safety management software, including: safety responsibility system, safety education, construction organization design, technical disclosure of division (project) safety, certificates for special operations, safety inspection, pre-shift safety activities, compliance with rules and regulations, handling of industrial accidents, construction site and safety signs, outsourcing system and management of outsourced workers, and relevant contract agreements.
2. The use of "Three Treasures" and four frontier defense facilities must meet the standards, including the use of safety helmets, safety nets and safety belts; Stairs, elevators, reserved holes, pits and holes, and border protection of balconies, floors and roofs.
3. Scaffolding facilities meet inspection standards and have acceptance procedures, including external scaffolding, climbing frames, hanging hands, non-hanging hands, hanging hands, etc. , check once a week, timely rectification, hidden dangers under control.
4. Three-phase five-wire system shall be implemented after the temporary electricity consumption for construction reaches the standard, and professional management shall be set up. The distance between the construction project and the erection of high-voltage lines, branch lines, on-site lighting, power distribution devices, fuses and low-voltage trunk lines must conform to the standards promulgated by the Ministry of Construction.
5. The tic-tac-toe frame and gantry frame are qualified and put into use. The acceptance requires that the safety device is sensitive and reliable, the safety sign signal is eye-catching, the frame body is stable, and the derrick safety protection, hoist and sling rope clamp conform to the specifications.
6, large construction machinery standards and safe use of tower cranes, all kinds of cranes and passenger and freight elevators must meet the ministerial standards, and experience the listing rear can use. Its drivers and commanders hold valid certificates and keep records every day; Three risks and five risks of tower crane are complete, sensitive and reliable, and other projects meet the requirements; The insurance limit of the dual-purpose elevator for people and goods is complete and effective, meeting other requirements.
7, small and medium-sized machinery in good condition and safe use should be kept in good condition, transmission and blade protection and zero standard, the operator according to its use requirements with special valid certificates.
8, the implementation of strong security monitoring has a specific security monitoring implementation plan, the implementation of floor security monitoring specific practices, floor security monitoring personnel related certificates, all personnel on the construction site must wear badges.
(B) "Field capacity and appearance" provisions
1 The enclosure of the construction site shall be set according to the project location: the height of the main road section and the urban landscape road shall not be less than 2.5m, and it shall be stable, neat and beautiful; The fence height of other sections shall not be lower than 1.8m to ensure stability and beauty; Facade of building and decoration engineering: The enclosure height of enclosure must be greater than 1.5m, which is higher than the working floor to prevent objects from falling.
2 the setting of enterprise characteristic signs on the construction site The setting of the gate, gate and flagpole on the construction site shall be subject to the unified standards of enterprises with different characteristics, and the abbreviation of group and enterprise specifications shall be indicated. Three flagpoles were erected at the construction site to raise the flags of the group and enterprises.
3 The site area distribution is reasonable and orderly, and the site capacity is clean and civilized. The construction area is strictly separated from the living area, the site appearance is neat, tidy and orderly, the civilized and material areas are neatly stacked, and the safety measures are in place.
4. Set up eye-catching safety signs. Set up eye-catching safety warning signs in construction areas and dangerous areas.
5. Set up "seven cards and one map" construction signs. Set up "seven signs and one map" at the main entrance and exit of the construction site: 1. Project introduction marks: project name, construction, design, construction, supervision unit, surrounding scope, area, engineering structure, floor, commencement and completion date and supervision telephone number of the construction site; 2. Nameplate of project leader: including project leader, engineer, safety officer, quality engineer, hygienist, builder, planner and material engineer; 3. Six safety discipline cards. Safety production counting card (days) 5. Ten safety technical measures cards; 6, fire information card 7, health information card (figure); 8, site construction general layout
6. The site must be leveling, smooth drainage, prevent mud, sewage, waste water outflow or blocking sewers and drains.
(3) Provisions on "on-site sanitation"
1 The "Five Owns" facilities in life are complete, and the "Five Owns" facilities on site are complete and reasonable. Eye-catching environmental sanitation publicity signs and contracted maps of responsibility areas should be set up in the living quarters.
2 in addition to the "four pests", drainage, sewage flow, the implementation of various measures to control the four pests. Drainage, sewage flow, conditional should be green layout.
The dormitory should be cleaned. The dormitory uses 36V low-voltage electricity uniformly, and the daily necessities are neatly arranged. On-site offices, changing rooms and toilets should be cleaned frequently and kept clean and tidy.
4 The canteen meets the hygiene requirements of 1, and the erection of the canteen should comply with the regulations and go through the examination and approval procedures; 2, the canteen and the surrounding should be clean and tidy, no water; 3. The container should be marked raw and cooked, veiled, and the canteen with conditions should be sealed; 4. Every year from May to 10, samples (not less than 50g) shall be kept for 24 hours and recorded; 5. Tableware and tea sets should be strictly disinfected, and the use cost should be disinfected every day to prevent cross-contamination. The supply of tea should meet the hygiene requirements; 6. The cook should have an annual physical examination, hold a health certificate and a health post certificate, be diligent, and maintain good personal hygiene habits.
5. Domestic waste management should be put into containers, placed at fixed points, managed by special personnel and cleaned regularly.
6. Health requirements 1, having an infirmary, or conducting on-site medical rounds at least twice a week; 2, do a good job in the publicity and education of workers' health and disease prevention, and introduce the knowledge of disease prevention to workers in the form of blackboard newspaper; 3, medical staff to supervise health, regularly check the place such as canteen hygiene.
Third, the provisions of "civilized construction"
1 On-site publicity requires that eye-catching publicity slogans reflecting the spirit of enterprise and the style of the times be set around the site; Set up propaganda posts and blackboard newspapers at the construction site to reflect the internal and external trends in time.
2 Team building requires strengthening team building. The site should provide necessary activity places for the team, with good class capacity and safety records of three posts and one evaluation, so as to improve the quality of the team.
The comprehensive management of public security requires strengthening the comprehensive management of public security on the construction site, achieving target management, implementing the system, putting the responsibility on people, taking effective public security preventive measures, putting in place preventive facilities for key parts, defining outsourcing teams, establishing file cards, signing public security fire prevention agreements and strengthening legal education.
4. Community service requires cooperation with the region during the construction period, to carry out * * * civilized activities, to think of the people, to reduce the construction noise, to make the construction not a nuisance, and to make the project a caring project and a convenience project.
5 fire safety 1, establish fire safety organization, obligatory fire brigade and fire prevention files; Clarify the fire safety responsibilities of the project leader, management personnel and each operation post; 2, according to the provisions of the configuration of fire equipment, personnel management, the implementation of fire prevention system and measures; 3, according to the construction area, hot work level, hot work must have "two certificates, a device, a guardianship"; 4. Strictly manage inflammable and explosive articles and set up special warehouses for storage.
Four, construction safety, construction civilization and safety civilization construction technology
(1) Creating a civilized construction site means creating a safe construction site, and the civilization of construction will bring construction safety. The purpose of creating a civilized construction site is to establish a civilized image and ensure safe production. In the above civilized construction site standard management regulations, most of them are related to ensuring the safety and health of employees, which almost summarizes the management requirements of all aspects of safety production. Therefore, to create a civilized construction site is to create a safe construction site, and to create construction safety with the civilization of construction.
(2) Safety and civilization are inseparable, and they are * * * one, forming a * * body of safety and civilization. Although the above provisions list safety clauses and civilized clauses respectively, there are civilized requirements in the safety clauses and safety requirements in the civilized clauses. In fact, the two are inseparable, and * * * is integrated into one to create a safe and civilized * * * body. Therefore, we must have such an understanding of security and civilization and their relationship.
(3) The meaning of architectural civilization, human civilization is the embodiment of cultural development level, social civilization is the embodiment of social and cultural development level, and architectural civilization is also the embodiment of architectural cultural development level. The development level of architectural culture is reflected in the development level of staff culture and architectural science and technology.
(4) Safe and civilized construction technology is an important part of construction civilization. Because safe and civilized construction technology is the concentrated expression of building science and technology and an important part of building civilization.
(5) The tasks and contents of safe and civilized construction technology. The task of safe and civilized construction technology is to create a safe and civilized construction production state and standardize the safe and civilized behavior of construction production. The safe and civilized state of building production includes two aspects: creating a safe and civilized construction site and adopting safe and civilized construction technology, and the safe and civilized behavior of building production is to carry out safe and civilized operation and operation. These three aspects of technology and its branches constitute a safe and civilized construction technology system. In view of the close internal relationship between the five components of the construction safety technical guarantee system, and the safe and civilized construction technology is the basic link, its projects will inevitably overlap with other projects to some extent.
Five, the basic requirements of creating a safe and civilized construction site
1, construction site classification
Construction sites can be divided into the following categories according to their scope and architectural characteristics.
(1) Construction area, that is, the construction area designated by large-scale construction projects, including completed area, area under construction, area to be built, enterprise production area and enterprise living area. The relevant planning arrangements shall meet the requirements of maintaining the regional environment, city appearance, traffic conditions, safety and civilization of the city or place.
(2) The construction site, that is, the construction area where the project is under construction, includes the construction and production operation area, the material stacking area and the reservoir area, and the temporary facilities area for management and living.
(3) The construction operation area, that is, the area or lot where the construction operation is under way, includes the following three types:
1) Single operation and normal cooperative operation section, that is, the section with single operation as the main task and other cooperative operations. For example, in the working area of structure and wall construction, the structure and wall are the main ones, and other water, heating, electricity and sanitary pipeline laying operations are carried out in coordination.
2) Cross-operation section, that is, the section where various operations cross and coordinate. In the crossover operation section, there is no obvious dominant single operation (all other operations must obey and cooperate with its construction requirements), so it is necessary to make coordination arrangements among all simultaneous crossover operations to ensure orderly, safe and smooth operation.
3) Special operation and dangerous operation sections, that is, special operations such as electric welding, blasting, prestress, high pressure and underwater, and sections of toxic, harmful and dangerous places.
For different types of construction sites, in addition to observing the general requirements of safe and civilized construction, we should also pay attention to meeting their special requirements.
2. Basic requirements for creating a safe and civilized construction site
(a), the basic requirements of the construction general layout
1 area is divided into construction operation area, auxiliary operation area, material stacking area, construction management and living facilities area by function.
2. Regional cross protection: Take protective measures for cross parts with safety problems.
3 tower crane settings meet the requirements of operation coverage and the safety requirements of boom rotation area.
4 Outland enclosure ① Enclosures isolated from the outside world are set around the construction site; (2) In the street or densely populated areas, it is advisable to build guardrails and scaffolding to enclose the outside.
5 Three links, one leveling and one drainage
6 site temporary electricity facilities
7 signs, signage facilities, corporate signs, engineering signs and safety signs are complete.
8 fire control facilities
(2) Basic requirements for three links, one leveling and drainage, dust control and waste control
1 Level the site, remove obstacles and have no potholes.
2. The roadway and sidewalk are solid and flat, with good vision, no water accumulation in rainy season, smooth between entrances and exits, and traffic signs are set up where necessary; At track intersections (tower cranes, etc. ), garage and sidewalk, flat measures should be adopted.
3. Power supply and water supply lines should be erected at the site of Dentsu and Shuitong.
4 drainage and sewage should have a good drainage system, and set up a sewage sedimentation tank to properly handle sewage. Untreated sewage shall not be directly discharged into urban sewers and rivers.
5 Dust Control and Waste Control Control Control the dust, waste gas, waste water and solid waste on the construction site. It is advisable to use sealed air ducts or other dust-proof methods to clean up high-altitude garbage, and regularly clean up garbage. It is forbidden to use garbage soil containing wastes and toxic substances as backfill soil.
(3) Basic requirements for organizing and preventing (fencing) in the operation area
1 The operation area shall be organized with a working site or working surface that meets the requirements, obstacles that affect the operation have been removed, dangerous protrusions have been properly disposed of, materials are neatly stacked, and there is a good safe passage.
2. Clean up the dismantled materials such as templates and scaffolding, as well as construction surplus materials, waste materials and garbage, and remove the nails on the wood in time or take photos (to prevent foot prick).
3 Protection of dangerous operation areas In areas where stones or articles may fall, pop up, splash and other injuries, safety protection measures should be set up to protect the safety of other people on site.
(4) Basic requirements for storing materials, equipment and tools.
1) Materials and articles shall be palletized, and the site shall be leveled and paved; In accordance with the location specified in the layout, neatly stacked and stable, not exceeding the specified height; The material shall be at least 500mm away from the enclosure or temporary building wall, and both ends of the entrance shall be blocked. It is forbidden to pile up materials near the fence or temporary building wall.
2) Scaffolding stacking of materials and articles is easy to roll (slide), and scaffolding stacking of materials and articles with high center of gravity should be stable and reliable. Design when necessary, and set strict design requirements.
3) Storage of flammable and toxic substances Paint, thinner and other flammable substances harmful to employees' health should be classified and stored in a well-ventilated special warehouse, without fireworks and fire-fighting supplies, and asphalt should be placed in a dry and ventilated place to avoid direct sunlight.
(five) the basic requirements and regulations of on-site fire protection
1) General provisions 1, key projects and high-rise buildings should prepare fire prevention technical measures and perform examination and approval procedures, and general projects should have fire prevention technical schemes; 2, according to the provisions of the configuration of fire fighting equipment, facilities and materials, and establish a fire control organization; 3. Clearly define the fire zone and the no-fire zone; 4, hot work must fulfill the examination and approval system, hot work operators hold relevant certificates and have special care; 5, regular fire inspection, eliminate fire hazards in time.
2) Daily management of fire-fighting equipment 1, and the fire-fighting ladder is kept intact; 2. Check the water gun regularly, keep the switch flexible, the nozzle unblocked and the accessories complete without corrosion; 3, hose collection should be rolled up in a single layer, vertical on the shelf; 4, all kinds of pipeline interface should be flexible, elastic moderate, no leakage, shall not fall when using; 5, fire hydrant according to the different requirements of indoor and outdoor regular inspection and timely filling lubricating oil, fire hydrant should be cleaned frequently, take anti-freezing measures in winter.
3) 1, fire control measures such as high-pressure water pump with sufficient lift for building construction above 24m; 2, according to the need to add temporary water tank, to ensure that there is enough fire water; 3, set up a full-time fire coordinator patrol inspection; 4, the scene is equipped with alarm device, timely report the fire.
4) the basement construction fire prevention 1, keep the entrance unobstructed; 2. It is forbidden to place oxygen cylinders and acetylene cylinders at the openings and blowholes of doors and windows; 3, are not allowed to be used as dangerous goods warehouse and storage of toxic and flammable items; 4, should have a fire alarm device.
5) Fire fighting in boiler room 1, equipped with suitable fire extinguishers every 25m2 area; 2. Smoke and dust suppression and Mars fire extinguishing devices should be installed on the chimney; 3, it is strictly prohibited to pile up other fuels and burning garbage in the room.
6) forging furnace's operation of fire prevention 1 on site must be checked by the fire safety department and obtain the fire protection approval certificate; 2, when using flammable liquid, should control the temperature, to prevent the liquid spontaneous combustion; 3. forging furnace should be built with refractory materials and equipped with fire fighting equipment.