Summary of Civil Engineer's Work (1) Looking back on my work in the past year, it was a busy and fulfilling year for me. Applying the scientific knowledge and theoretical knowledge learned from textbooks to practical work, I have accumulated a little experience in my work, which is the best wealth in my life.

This year, there were difficulties and gains in my work. The result of serious work is to complete job responsibilities and strengthen one's own ability. Now, I will briefly summarize my work this year as follows:

First of all, in terms of political thought

I have a strong sense of ownership, and I have always been concerned about the development of various undertakings of electric power construction companies and the interests of the company in my work. Unswervingly promote the development of various undertakings of the company.

Although I haven't joined the China Producers' Party, I will be strict with myself as a party member. Consciously accept the supervision of leaders and colleagues, make unremitting efforts, overcome their own shortcomings, make up for their own shortcomings, and strive to join the great China * * * production party as soon as possible.

I must start from my daily work, start from me, and from now on, cultivate my professionalism and make unremitting achievements. I must constantly strive to improve my work skills, master enough post knowledge, and do my job in a down-to-earth manner.

Second, the work attitude

No matter at work or in life, I always believe that no pains, no gains, so I have been working hard and studying hard. Love work, seriously correct every deficiency in work, make effective use of working time and stick to your post. I always have a strong sense of responsibility and carry forward the spirit of hard work.

Third, job responsibilities

Conscientiously implement relevant national standards, quality management system, product quality supervision and inspection and research and development policies. Effectively implement the relevant standards, test methods and regulations of this position and be responsible for the quality of engineering products.

Fourth, specific work.

The main job of civil engineers is to test and inspect some types of materials (cement, sand, stone, steel, brick, etc.). ) and finished products (steel weldments, concrete blocks, etc. ) for civil engineering, and control and deal with the concrete and backfill work.

Verb (abbreviation for verb) job performance

I learned a lot at work, but I also exercised myself. After unremitting efforts and further improvement, he has successively won the titles of "Honoring Individual Class II" and "Collective Model Worker".

Work summary of intransitive verbs

Although I have made some small achievements this year, there is still a big gap between the trust and expectation of the company. In the future work, I will work harder, constantly improve my professional skills, and better complete the tasks assigned by my leaders.

Summary of Civil Engineer's Work (II) I have been in the company for one year. During this period of work, I was mainly engaged in the infrastructure management of the company. During this year, I deeply realized the hardships and happiness of being an infrastructure administrator, as well as the pain and pressure of being an excellent administrator. When I first entered the society, I devoted my youth and passion to the management of infrastructure, and sprinkled sweat on every humble work site. Turn around and look back on this year, how much hardship and sadness, how much boredom and loneliness; I was once confused and lost. Looking back now, just like the sky in Tongxiang, the wind is light and the clouds are light. At this time, just as Zhang Xiaoxian said, the turning point of life was full of difficulties and dangers. One day, I suddenly looked back and flew over Qian Shan. In my work, I was very touched and gratified by the tireless guidance of the leaders and the help of my colleagues and the cordial care of the leaders. This will be the most precious wealth and warmest memory in my life. The following is a summary of my internship. Generally speaking, I have gained a lot and felt a lot.

First, keep a state of mind, keep a correct position, obey the rules and discipline, and strive to improve their abilities in all aspects.

As a new employee of a new enterprise, we only have theoretical knowledge, but there is a great deviation between actual operation and theory. Especially for our architecture major, many valuable things can't be learned from books at all, and they are all explored by thousands of old employees in Qian Qian. So I always remind myself to keep a positive attitude, love my job, work hard, keep learning and improve my ability in all aspects. At work, I found some old masters, whose diploma level is not high, but their practical work ability is very strong, and they often hit the nail on the head when analyzing on-site problems. Their rich experience is a valuable asset and the source of my study; "No matter big or small, we will do our best." No matter how big or small things are, every time you do one more thing, you will certainly learn more knowledge and accumulate more experience. A small amount of water flows into the river. Through a year's work and study, my ability in all aspects has been greatly improved. This is also my most gratifying place.

Second, if you are willing to endure hardships, your working ability will be improved.

We all know that the construction industry is hard and monotonous. Since we have chosen this industry, we should put the consciousness of "preparing for hardship" in the first place. It is a common practice for buildings to be exposed to wind and sunlight. Although the work is hard, as long as you work hard, you can slowly see the process of your growth. A year later, when you feel that you know more and more, you will gain joy, take pleasure in suffering and be proud of suffering.

Third, if you work hard, you will get something.

"Attitude is everything". A dynamic and positive attitude towards life can not only make others sit up and take notice of you, but more importantly, make them make continuous efforts, actively face problems in their work, and study, analyze and solve them. In my work, I understand the connotation of "many a mickle makes a mickle, and thin hair makes a mickle". Without long-term training and accumulation, it is difficult to achieve a career. To engage in infrastructure management is to regard yourself as a worker, which is a process of accumulating experience and enriching life; It is also a process of precipitation, the precipitation and integration of knowledge; It is also a process of improving ability, increasing talents and maturing. I cherish my days at the construction site very much, and I will continue to work hard. I will firmly grasp myself and strive to surpass myself, so as to achieve success.

I can adapt to my present job and make continuous progress without the selfless help and care of my leaders. I am grateful here. At work, I realize my own shortcomings, and need to further strengthen my knowledge and construction site management ability, learn more, communicate more and coordinate more, share worries for leaders, do a good job in a down-to-earth manner, save project investment costs for the company, and strive to achieve the best engineering quality.

Summary of Civil Engineer's Work (III) Due to the manpower deployment of the company, I was transferred from the * * project to the World Village project as a civil engineer in October, 20XX. With the help and guidance of the general manager of * * * and other project colleagues, I tried my best to do my job well. Now I will briefly summarize my work and study in the past year as follows:

I. Description of work situation

/kloc-responsible for project management, handover and maintenance of Building No.7 in Zone H of World Village from October to July; responsible for project management of Building No.7 in Zone I 1 # from July to September; responsible for project management of Building No.7 in Zone I from September.

Second, clear job responsibilities.

1. Perform supervision duties: be responsible for the acceptance of engineering divisions, disciplines and inspection lots; Responsible for compiling and summarizing project supervision logs and supervision data; Conduct a comprehensive inspection of the key construction parts of the site and the station, report the quality and safety problems to the director in time, and take corresponding solutions.

2. Perform Party A's duties: be responsible for on-site quality management, and collect, sort out and save data management materials. Responsible for auditing budget, settlement, construction organization design, various construction schemes, material plans, on-site visas, design changes, etc. Responsible for on-site communication and written data transmission with the company and design institute on matters such as joint review of drawings, design change, slot inspection and subject acceptance. Responsible for coordinating the construction problems of the general contractor and subcontractors.

Third, the daily work situation

1.10-During the handover construction of Building No.7 in Zone H from July, the main responsibility is to check the installation of people and things on site and report to the leaders regularly every day. If quality problems are found, the Fourth Bureau is required to make timely rectification and report to the leaders. Coordinate the construction problems of subcontractors and general contractors. Responsible for household acceptance and handover before property delivery.

2. During the hardcover construction of Zone I 1# Building and 7# Building from July to September, I was mainly responsible for the design change of the construction model room of 1# Building, conveying the company's relevant technical requirements to Cathay Pacific and Libeia hardcover units, and being responsible for reviewing and reporting the bathroom waterproof scheme and ceiling scheme. Responsible for the division, disciplines and inspection lot acceptance of two buildings. Be responsible for confirming the structural problems and quantities of the original site construction unit (China Construction Fourth Bureau). Responsible for communicating with designers about drawings. Responsible for Party A's subcontracting material plan. Responsible for compiling and summarizing the supervision log of the first district.

3. During the hardcover construction of Building No.1 1# from September to now, he was mainly responsible for the audit of construction organization design, and the audit and report of engineering quantity budget of steel clips in the Fourth Bureau. Responsible for contacting designers to prepare valuable drawings. Responsible for the acceptance of ceiling keel, waterproof construction, kitchen and bathroom tiling, facade insulation and wall plastering on the construction site. Responsible for compiling and summarizing the supervision log of the first district.

Fourth, the results of the work

1, Building 7 in Zone H was delivered to the owner from June 29th to July 1. At that time, there were 73 owners who came to repossess the building, and 69 owners had already repossessed the building. At that time, the repossession rate reached 95%. The owner has no major complaints.

2. Current progress of the physical model room in Area 1: Except bathroom hardware, wallpaper and water cabinet, other sub-projects have been completed.

3. Construction progress of Building No.7 in Area I: wall putty is completed at one time, wood keel with wood veneer is completed, ceiling keel is completed, and waterproof layer is 4~ 16 (16~ 10 after acceptance). Kitchen bricklaying 16~4 floors, bathroom bricklaying 16~ 15 floors, ground cushion completed, facade insulation completed, real stone paint 30%, aluminum window glass fixed installation 80%, external elevator removed, fire fighting 16~9 floors, and two indoor elevators installed.

4. The examination and approval of the Loft waterproof scheme, ceiling scheme and construction organization design scheme for Area 1 is completed; Synchronization of construction data and progress, and synchronization of supervision logs and station records with construction progress; Due to the need of joint review of drawings, the project budget entrustment of steel clips has not been changed, and design changes are being coordinated and distributed.

5. The preparation of materials for Building A and Building B in Area I (1#, 7 #) and Party A has been completed, which can meet the subsequent construction progress.

Verb (abbreviation of verb) experience summary

1, found insufficient.

(1) In combination with the quality problems in Zone H, problems such as cracking of LOFT ceiling, water leakage in bathroom, moldy wallpaper and alkali stone in bathroom were avoided in the construction of Zone I. ..

(2) On the progress of the project, the construction unit in the first district was replaced by hardcover, and the production and construction of Cathay Pacific and Libeia have entered the right track. The delivery of Building 7# in Zone H was delayed due to project arrears, and the material supplier failed to provide the building materials in time, so there were too many construction quality problems in China Construction Fourth Bureau.

(3) Shortcomings in safe and civilized construction: the garbage in Area I is not cleaned in time, and there are potential safety hazards in site construction.

2. Corrective measures

(1) The problem of ceiling cracking has been communicated. Double plasterboard is used in the design, and reinforcement measures are taken for weak parts. The problem of toilet leakage has required the construction unit to report the scheme separately. In the cushion construction, steel wire mesh is used to strengthen the wall root, and the buried pipe construction is strictly required to avoid the brick sticking error caused by ultra-high buried pipe. When the waterproof construction is accepted, notify the regional engineer to carry out multi-party acceptance of the project, and strictly require the waterproof thickness and height; In the process of sticking bricks, the project engineer is required to stand by and avoid damaging the waterproof layer. The problem of uneven wallpaper requires strict acceptance of wall foundation construction. The problem of stone flashing requires you to strictly control the materials entering the site.

(2) On the schedule, you are required to inspect the site every day, and coordinate the construction unit in time and report to the leader when you find the shortage of materials and labor.

(3) In terms of safe and civilized construction, you are required to patrol the site more than twice a day, and ask the construction unit to rectify and report to the leader in time when problems are found.

Intransitive verb 20XX work plan

1, construction schedule:

(1) In March of 20xx, the ceiling of Building 7 in Area 1 was capped, the aluminum window glass was installed, the lobby and the last floor were basically perfect, and the indoor elevator was completed.

(2) In April of 2)20xx, the organization of Building No.7 in Area 1 was completed, the facade was painted with real stone, the indoor room was putty, waterproof was completed, bricklaying was completed, stair railings were completed, wood veneer was completed by 50%, doors were installed, and fire doors were installed.

(3) In May of 3)20xx, the ground floor of Building 7 in Area 1 resumed overall construction, with 60% wallpaper, 80% interior door installation and lamps. 50% radiator installation, 50% cabinet installation and 50% shower glass installation.

(4) On June 4, 20xx, the installation of range hood, gas stove and water heater, shower glass, bathroom hardware, wallpaper and wooden floor was completed in Building 7, Area 1.

(5) In July, 20xx, the residents of Building 7 in Area 1 accepted and the property was handed over to the owner.

Seven. Expectations of the company

1. The letters sent by the general contractor and subcontractors reflect that the financial pressure is so great that the work of the project department cannot be fully promoted. The project suggests that the company can pay the project cost of the approved output value in full.

2. It is suggested that the company regularly provide professional training for project engineers.

I recommend it carefully.