Simple engineering contract template (6 volumes) (1) ContractNo.:
Party A:
Party B:
Article 1: Purpose of the Contract
Party A employs Party B to engage in labor services in xx Construction Company, and our company is now recruiting construction workers (steel workers, carpenters and bricklayers). After full consultation, both parties voluntarily sign the following contract. In order to ensure the smooth completion of Party A's project, both parties shall cooperate with each other and earnestly perform this contract.
Article 2: Employment period of the type of employment
Party A employs Party B according to the type of work or other posts, and the competent employment period of Party B is 2 to 5 years, from the date of signing the contract to the termination of the contract. The specific time limit for a project is determined according to the progress of the project. Party B shall unconditionally obey the arrangement of Party A, and Party A shall not extend or stay without authorization. If it happens, Party A will be liable for breach of contract.
Article 3: Work Tasks, Time and Payment Methods of Wages
1. Party A shall settle the wages according to the actual attendance of Party B every month, and settle the wages of workers at the beginning of each month. Where wages are paid normally due to Party A's reasons, Party A shall have four days off every month and pay all the wages, with a monthly salary of xx yuan. If there are skilled workers or skilled craftsmen, they can get a salary increase (xx yuan to xx yuan), but Party A is responsible for Party B's accommodation.
2. Party A must pay the monthly settlement salary on the 6th day of1~ 5th. If Party A's funds are not in place, Party A will pay 30% of the salary as liquidated damages.
3. Party A will arrange workers to carry out indoor construction in winter. If Party B wants to return to China in winter, Party A will provide the return expenses and the round-trip expenses for the coming year.
Article 4: Travel and transportation expenses
Party A shall bear all expenses of Party B from xx to xx, and all domestic expenses shall be borne by Party B. ..
Article 5: Safety Responsibility
Party A's safety labor protection measures must be in place. If it is not in place, Party A shall bear all consequences, and Party A shall be responsible for Party B's personal insurance. Due to natural factors or irresistible reasons, Party A shall be responsible for Party B's basic guaranteed salary.
Article 6: Party B's responsibilities
When going to xx country, Party B must abide by local laws and regulations, and bear all consequences such as fighting, fighting, absenteeism, alcoholism and property theft.
Party B's work error causes major engineering quality problems (such as carpentry, which affects the progress of the project and causes the loss of construction period and materials, and Party B shall be responsible for it as appropriate).
Party B must ensure the quality and progress of the project and deliver the project on time. If it cannot be completed on time, Party A will decide as appropriate.
Article 7: When either party fails to perform its responsibilities and obligations under this contract, the other party has the right to pursue the responsibilities of the breaching party according to law and demand compensation for the losses caused by the other party's breach of contract.
This contract is made in duplicate, one for each party. This contract shall come into force as of the date of signing.
If there are other changes or supplements in the work, Party A and Party B shall settle them through consultation.
Party A: Party B:
20xx year x month x day
Simple project contract template (6 complete projects) (2) Party A (owner): Party B (contractor):
Party A and Party B have reached an agreement on the private housing project through consultation in accordance with relevant laws and regulations and on the principles of equality, voluntariness, fairness, reasonableness and mutual benefit. In order to regulate the civil behavior of both parties in the construction of private residential projects, the terms of this contract are formulated, and it is hoped that both parties will strictly implement them and abide by them together.
I. Overview of construction projects:
The commencement period is xxx years, xx months and xx days, and the completion period is xxX years, xx months and XX days. This project is a brick-concrete structure with an area of about 125m2, subject to the actual construction area.
Second, the way of labor contract:
1. Project contract price: This project is contracted by Party A and Party B, and the contract price per square meter is RMB xxx, and the total contract price is subject to the actual area.
2. Contracting method: The project is contracted without contracted materials. All building materials such as steel, cement, brick, lime, sandstone and ceramic tile used by Party A shall be provided by Party A, and all mechanical equipment used by Party B in the construction, such as mixers, vibrating equipment, templates, jacking wood, scaffolding wood, shovels, trolleys and other construction tools shall be borne by Party B. ..
3. Project content: Starting from the foundation, construct the main body according to the drawing. Including: floor and wall painting, tiling, water and electricity installation, septic tank; Indoor porcelain scraping, indoor and outdoor plastering line.
4. Project quality requirements: Party B must construct according to the requirements of the drawings, the bricks should be fully grouted, the beams and columns should be vertical and flat, and the four corners of the house should be horizontal to ensure the project quality is qualified. If it is unqualified, Party B must rework it until Party A is satisfied, and the losses caused thereby shall be borne by Party B..
Three. Responsibilities of both parties:
1. The project must be constructed according to the requirements of Party A, and Party B shall not change the construction method at will. If design problems are found during construction, Party A shall be informed in time, and if changes are really necessary, both parties shall reach an agreement through consultation.
2. Party B shall be fully responsible for the safety problems, and Party A shall not be responsible for any safety accidents. In the process of construction, Party B must ensure safety in production and construction, and have adequate safety guarantee mechanisms and measures.
4. Payment method: Pay a certain fee of 3,000 yuan for food and utensils from the official construction, and 65,438 yuan+0,000 yuan after the first floor is capped. After Party A's project is completed, if there are no major quality problems, the balance will be paid in one lump sum. 5. Party B shall be responsible for the construction electricity fee.
Matters not covered in verb (abbreviation of verb) shall be settled by both parties through consultation.
6. This contract is made in duplicate, one for each party, and it is hoped that both parties will abide by it together, and the breaching party will bear all responsibilities.
Signature of Party A (handprint):
Signature of Party B (handprint):
20xx year month day
Simple engineering contract template (6 complete works) (3) Party A: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
Party B: _ _ _ _ _ _ _ _ _ _ _
After careful consideration, Party A thinks that Party B has certain construction ability and management level, and decides to entrust Party B with the task of installing the derrick of our company ... and clarify the responsibilities, rights and interests of both parties; Based on the principles of "giving full play to the advantages of all parties" and "equality and mutual benefit", the following agreement is reached on relevant matters through friendly consultation between both parties for mutual compliance.
I. Work content: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
Second, the model _ _ _ _ _ _, the number of units _ _ _ _, and the height _ _ _ _.
3. Unit price: RMB _ _ _ _ _ _ _ _
Four. Mode of contracting: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
5. The total contract price is _ _ _ _ _ _ _ (in words: _ _ _ _ _ _ _), and the payment method is _ _ _ _ _ _ _ _.
Six, derrick installation safety and quality requirements:
1. Derrick installation shall be carried out in strict accordance with the detailed rules for the implementation of derrick inspection scoring standard in JGJ59-99 Standard for Safety Inspection of Building Construction of the Ministry of Construction and the detailed rules for the implementation of scoring standard for safety inspection of building construction of _ _ _ province, and the installation quality must meet the requirements of construction acceptance.
2. According to the actual situation of the construction site, the installation shall be carried out in strict accordance with the established installation plan and the disclosure requirements of Party A's engineers and technicians.
3. Derrick installation operators must be trained in professional installation skills and hold relevant certificates. A copy of the operation certificate shall indicate the place of use and be stamped by the shelf engineering department.
Seven. Responsibilities and obligations of Party A and Party B:
(I) Party A's responsibilities
1. Be responsible for providing Party B with relevant operation specifications of derrick safety technology.
2. Be responsible for providing technical documents such as construction plan to Party B. ..
3. In order to ensure the construction period and quality of derrick installation, Party A shall perform its responsibilities in accordance with the provisions of this contract and pay Party B the labor remuneration for derrick installation in time. At the same time, do a good job in derrick infrastructure and remove obstacles.
4. Party A shall timely conduct safety education and safety technical disclosure for derrick installers entering the site.
5. Be responsible for supervising and assessing Party B's work, and have the right to instruct Party B to correct it in time if it does not meet the requirements.
6. After the derrick is installed according to the construction requirements of the building project, Party A shall handle the acceptance on time and issue a visa in time. Party A shall be responsible for all accidents caused by using the visa in advance without acceptance.
(II) Responsibilities and obligations of Party B:
1. Party B must implement Party A's construction plan and safety technical disclosure, strictly abide by relevant rules and regulations of safety supervision at all levels, and obey the supervision and inspection of relevant departments at all levels.
2. Party B must closely cooperate with Party A's requirements, and shall not affect the construction progress, otherwise Party B shall be responsible for the losses caused by the delay in the construction period.
3. When the derrick is delivered for use without an acceptance visa, Party B shall be responsible for the inspection, maintenance and reinforcement of the derrick during installation. Party B shall be responsible for safety accidents caused by installation quality.
4. For the hidden dangers of derrick installation proposed by Party A and relevant departments, Party B shall rectify and eliminate them in time, and re-examine the visa after rectification.
5. Take full responsibility for the delay in the construction period caused by its own reasons (including compensation for economic losses, fines and legal responsibilities put forward by relevant units).
This agreement shall come into effect after being signed by both parties. Party A and Party B shall consciously perform the contract, support and cooperate with each other to prevent accidents.
This agreement is made in duplicate, one for each party.
Matters not covered in this agreement shall be settled by both parties through consultation.
Party A: _ _ _ _ _ _ _ _ Party B: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
Representative: _ _ _ _ _ _ _ Representative: _ _ _ _ _ _ _ _ _ Representative: _ _ _ _ _ _ _
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
Simple engineering contract template (6 volumes complete) (4) Party A:
Party B:
Through friendly negotiation between Party A and Party B, Party A decided to contract all the external wall painting works of the company to Party B. In order to clarify the rights and obligations of both parties, this contract is hereby signed in accordance with relevant national laws and regulations for * * * to abide by.
first
Project overview
1. Project address:
2. Construction content: external wall painting, with a total area of about 1000 m3.
3. Project Commencement Date: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
4. Project completion date: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
5. Project contracting method: contracting for work and materials.
6. Total days of the project: days, postponed in rainy days.
Article 2 Project Price
The project price is RMB (in words) per square meter (
Yuan, calculated according to the measured area). Increase projects and increase costs; Reduce engineering and cost.
essay
quality requirements
1. The varieties, specifications and names of the main materials used in the project shall be approved by both parties.
2. Project acceptance criteria: all external walls.
1.2 meters high is brown,
1.2m is blue. Both the old office building and the sales office building have brown walls.
3. During the construction, if Party A has special construction projects or special quality requirements, both parties shall confirm and sign a supplementary contract for the increased costs.
4. All materials shall be purchased by Party B, and the product quality shall be borne by Party B; Including the construction quality, shall be borne by Party B..
5. Party B shall carefully construct to ensure the same color. If the colors are inconsistent, all materials and project funds required for rework shall be borne by Party B, and Party A shall not bear any responsibility.
Article 4
Material supply
If the materials provided by Party B do not meet the quality requirements or have different specifications, they shall not be used. If it has been used, all losses caused to the project shall be borne by Party B. ..
Article 5
Payment type/method
After the contract is signed, Party A shall pay it when the project starts.
% of the project cost; After the project is completed and accepted, both parties shall settle accounts, and Party A shall pay within three months after Party B issues the invoice.
% of the project cost, the rest.
% of the project payment shall be used as the project quality deposit, and shall be paid in one lump sum within _ _ _ _ _ _ _ days after the project quality warranty period expires (from the date of acceptance).
Article 6
construction period
Party B shall complete the project on schedule. If the completion is delayed, 200 yuan will be deducted from the project payment for each day overdue.
Article 7
acceptance of works
According to this contract, both parties
Article 3 Acceptance shall be conducted in accordance with the agreed acceptance criteria.
Article 8
Any other business
This contract is an engineering contract, and there is no employment relationship between Party A and Party B. ..
In the process of contracting, Party B shall strictly implement the national laws, regulations and construction specifications related to safety in production, so as to achieve safe production and civilized construction. Party B shall be responsible for all accidents in the contracting process, and Party B shall be responsible for all losses such as personal injury and property loss caused by accidents, and Party A shall not bear any responsibility and compensation.
Article 9
responsibility for breach of contract
After the contract comes into effect, if one party cancels the contract without authorization during the performance of the contract, so that the actual losses caused by the other party exceed the liquidated damages, it shall be compensated.
Article 10
settlement of dispute
During the performance of this contract, any dispute between the two parties shall be settled through negotiation. If negotiation fails, a lawsuit may be brought to the people's court.
Article 11
This contract shall come into effect after being sealed or signed by both parties.
Article 12
This contract is made in duplicate, one for each party.
Party A (seal):
Party B:
Entrusted agent:
Date of signing: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
Simple project contract template (6 volumes) (5) Project name:
Address:
Party A:
Party B:
In accordance with the Contract Law of People's Republic of China (PRC), the Guarantee Law of People's Republic of China (PRC), the Construction Law of People's Republic of China (PRC) and other relevant laws and administrative regulations, and following the principles of equality, voluntariness, fairness, honesty and credit, both parties reach an agreement on the construction of this construction project and conclude this contract.
1. contract unit price: according to the construction area (per square meter:? Meta calculation).
2. Quality: In the production process, Party B shall strictly follow the construction specifications, absolutely obey the project schedule arranged by Party A, and ensure the quality to complete the project. In case of special circumstances, Party A and Party B shall try their best to complete the project after consultation.
Third, security:
1. When entering the site, Party B's construction personnel must abide by the safety regulations and wear safety helmets. Slippers and drunkenness are prohibited from entering the construction site, and fighting and drunkenness are prohibited. (Note: In case of drinking, making trouble, fighting, etc., a fine of 10000 yuan will be deducted from Party B's project payment for any reason, and the local police station will handle the serious cases) and the troublemakers will be removed.
2. If a safety accident is caused by one's own illness during the construction, and Party A is not informed, it shall be borne by himself.
3. During the construction period, the safety must comply with the construction safety rules. If you don't follow the rules, Party B will bear the accidental casualties. In case of unsafe operation during construction, the safety officer of Party A has reason to impose a fine. In case of illegal stacking operations, safety accidents shall be borne by Party B. ..
5. The insurance shall be borne by Party B's personnel. If the insurance is not purchased, the casualties of workers shall be borne by Party B. ..
4. Project progress: Party B shall complete Party A's project plan as far as possible. If Party B delays the construction period or unreasonably stops the construction, except for force majeure factors, such as natural disasters, fires, work stoppage, etc., it will be punished at a daily rate of 65,438+0,000 yuan (overtime is within the normal construction scope, and overtime is required to grab the construction period).
Verb (abbreviation of verb) signing method:
1. Party A does not undertake the wiring required for construction, excluding any equipment and tools.
2. The scope of work includes steel bar fabrication and binding, size and material, steel bar sampling and unloading, and tower crane foundation.
3. Party B must clean up the site after work. If it is still not cleaned after being notified by Party A, Party A has the right to deduct Party B's project payment according to 300 yuan/Gong's method after cleaning by itself.
4. Party B shall be responsible for all reinforcement works in this project, and the reinforcement shall be unloaded at the site.
6. Construction change: After receiving the change notice from Party A, Party B fails to carry out the construction according to the change in time, resulting in rework and losses. If the change causes the engineering quantity to be processed and increases the engineering cost, Party A and Party B can negotiate to give Party B a reasonable engineering fee according to the engineering quantity.
Seven. Payment method: Party A shall pay 75% of Party B's total works every month from the date when Party A needs Party B to enter the site for construction. If construction cannot be carried out in winter, Party A shall pay 85% of Party B's total works, and the remaining 65,438+000% shall be paid after Party B's main body is capped. When allocating funds, Party B shall issue a payroll for workers, and the payroll personnel must be real, and Party A shall pay the wages. If a false payroll is issued, Party A has the right to withhold the project payment. (Remarks: If Party A fails to pay the project payment to Party B as agreed in the contract, Party B has the right to stop work, and all losses caused thereby shall be borne by Party A. (If Party B withdraws from the construction site without reason during the construction period or in the second year or breaches the contract, Party A shall bear all losses of Party B and compensate for 30% of the total project amount. )
Eight, if in the normal construction, due to Party A's reasons, Party B's workers stop working on the site for more than three days, Party A will give reasonable compensation according to the actual number of Party B on the site (calculated by 260 yuan per person per day).
Nine. The above agreement shall come into effect after both parties reach an agreement through consultation. This contract is made in duplicate.
Representative of Party A:? ID number:
Representative of Party B:? ID number:
date month year
Simple engineering contract template (6 volumes complete) (6) Party A:
Party B:
Party C:
Project name:
In accordance with the relevant provisions of the Contract Law of People's Republic of China (PRC) and in order to clarify the responsibilities and obligations of the three parties, Party A, Party B and Party C entered into this contract through friendly negotiation.
Article 1: Product name, trademark, specification, model, quantity, amount, manufacturer, etc. See the attached table of the contract for details.
Total contract price RMB (tentative):
Article 2: Quality Requirements and Warranty Period
Quality requirements: It shall be implemented in accordance with national codes and standards or other standards agreed by both parties (see annex). Warranty period: two years (counting from the date when the quality supervision station passes the acceptance test and all products of Party C pass the inspection and debugging).
Article 3: Place and Time of Delivery
Place of delivery: the project site of xx# Building, xxx Community, Jinan.
Delivery time: according to Party B's requirements.
Article 4: Mode of Transportation and Costs
Mode of transportation: car transportation expenses: borne by Party C.
Article 5: Acceptance Criteria
Construction drawings signed and approved by the three parties according to relevant national codes and standards or other standards formulated by the three parties.
The drawings and technical drawings, samples, processes and descriptions confirmed by both parties shall be used as the basis for quality inspection and acceptance.
Article 6: Methods of Settlement and Payment
6. 1 Settlement method: subject to the final supply quantity, subject to the final accounts confirmed by Party A, Party B and Party C, and subject to the invoice issued by Party C as the basis for settlement and payment.
6.2 Payment method:
70% of the contract amount shall be paid within seven days after the equipment enters the site as required by Party B, and the full performance bond shall be refunded without interest; Pay 80% of the contract amount within seven days after the electrical acceptance; After the acceptance of the quality supervision station, according to the settlement of Party B and Party C, xx5% of the total price shall be paid within ten days after the approval of the supervisor and Party A; The remaining 5% is the quality guarantee money, and the balance will be paid off without interest within seven days after the expiration of the quality guarantee period.
Article 7 guarantee
According to the current relevant provisions of the state.
7. 1 warranty content and scope: Any damage caused by Party C's reasons (such as materials, construction quality and other force majeure factors) shall be guaranteed by Party C free of charge, and Party C shall bear the direct and indirect economic losses caused to Party A and Party B; If there is any quality problem, Party C shall arrive at the place designated by Party B within 4 hours after receiving the notice from Party B, and solve the problem within 2 days. If Party C fails to arrive on time, handle and maintain it within the specified time or the maintenance is incomplete, Party B may entrust other units to maintain it, and Party C shall bear all the expenses and 50% of the total warranty amount as liquidated damages. For the damage caused by man-made use, Party C shall be responsible for the maintenance and collect fees; The damage caused by force majeure is not covered by Party C's warranty.
7.2 Warranty period: two years. If the warranty period expires and the construction quality problems are not handled, the warranty period shall be postponed from the date when the maintenance is completed and accepted.
Article 8: Tripartite liability
8. 1 Party A's responsibilities:
Pay the project payment to Party C according to the contract. Supervise Party B and Party C to implement the contract.
8.2 Party B's responsibilities:
8.2. 1. Make technical disclosure to Party C before the execution of the contract.
8.2.2 Party B appoints comrades as Party B's representatives to be responsible for the supervision, inspection, alteration, acceptance and settlement of the progress and quality of this contract.
8.2.3. According to the progress of the contract project or the contents of the changed project, Party C shall be provided with the plan list or the changed plan list (number, quantity, delivery time and place) five days in advance, otherwise Party C shall bear the responsibility.
8.3 Party C's responsibilities:
8.3. 1. Party C shall provide the required products to Party B on time in strict accordance with the requirements of Party A, Party B and the supervision unit, and deliver them to the delivery place for acceptance and confirmation by Party B. ..
8.3.2 According to the order required by Party B, deliver the boxes first, and then deliver the rest.
8.3.3. Party C shall not add or subtract items without authorization. If there is any change, it must be confirmed by the on-site technical director of Party A, the on-site supervisor of the supervisor and Party B, otherwise the responsibility shall be borne by Party C..
Article 9 Disputes
Dispute settlement: The three parties shall strictly perform their obligations under this contract. In case of any dispute between the three parties during the performance of this contract, it shall be settled through negotiation in time. If negotiation fails, the three parties agree to bring a lawsuit to the people's court where the project is located.
Article 10 breach of contract
10. 1 Once Party C subcontracts or subcontracts the project, Party A and Party B have the right to terminate the contract and claim compensation from Party C. The liquidated damages shall be calculated at 30% of the total contract price, and Party C shall bear all losses caused to Party A from this.
10.2 If Party B fails to deliver the project on time due to Party C's reasons, Party C shall pay Party B a penalty of 5‰/ day of the total project cost within 10 days (1%/ day for 20 days overdue and 2%/ day for more than 20 days overdue). If Party A fails to pay the project payment to Party C on schedule, Party A shall pay the project payment interest to Party C at the bank interest rate for the same period.
10.3 party c's Jerry-building has caused quality hidden trouble, which does not meet the requirements of the standards, specifications and standards agreed in the contract. In addition to ordering rework, Party A has the right to refuse to pay the project payment according to the actual situation, and deduct 5% ~ 30% of the total contract price of Party C as liquidated damages.
10.4 if the materials used in the project do not meet the requirements of the contract (including those inconsistent with the samples), they shall be ordered to rework. In addition to immediately replacing the fake and shoddy materials in the contract and conforming to the samples, Party C shall also pay Party B a penalty of ten times the loss.
10.5 if party c terminates the contract without authorization, it shall not only return the project price paid by party a, but also compensate all losses (including direct losses and indirect losses) caused by it, and the project deposit will not be returned.
10.6 Party C shall take full responsibility for the quality problems caused by unreasonable construction practices.
10.7 under normal use, all losses (including direct and indirect losses) caused to the owner due to product quality problems and construction quality problems shall be borne by party c. ..
10.8 On the date of signing this contract, Party C shall pay a performance bond of RMB 30,000.00 Yuan to Party A, which shall be directly credited to the account designated by Party A. If it is overdue for more than 5 days or refuses to perform the contract for more than 5 days or the project quality is unqualified, the performance bond shall be confiscated.
Article 12 Effective date of the contract: This contract shall come into effect as of the date when it is signed and sealed by the three parties, and shall become invalid after all the contents of the contract are fulfilled.
Article 13 Number of copies of the contract: This contract is made in seven copies, three for Party A, two for Party B and two for Party C. ..
Party A (seal):
Party B (seal):
Party C (seal)
date month year
Teacher's resume model essay 200 words 1
personal data
Name: xxx
Gender: Female
Age: 22 years old
Native p