Equipment, materials and construction team preparation
2.3. 1 preparation of equipment and materials

1) Prepare construction machines and tools, and do a good job in maintaining and debugging existing machines and tools; The missing machinery and tools should be ordered, leased or produced immediately.

2) Plan the demand for building materials and arrange the supply of goods. Organize personnel to purchase special materials in advance.

3) Processing entrustment or production arrangement for precast reinforced concrete members, steel members, iron parts, doors and windows, etc.

2.3.2 Preparation of Construction Team

2.3.2. 1 management personnel

Do a good job in on-the-job training for construction management personnel before taking up their posts to ensure that they master the construction technology and operation methods, and can only take up their posts after passing the examination. Centralized training for engineering and technical personnel to learn new norms and regulations. Conduct construction disclosure for construction management personnel, so that all management personnel know fairly well.

2.3.2.2 labor

All team members should carry out safety construction, civilized construction and management publicity and mobilization before entering the site. Concentrate on training operators of special types of work, and they can only take up their posts after passing the examination. Technical and safety disclosure shall be made to each team before construction.

2.3.2.3 improved, enriched and adjusted the construction organization.

Deploy and arrange the combination of labor force and adjust the construction organization.