Current location - Education and Training Encyclopedia - Education and training - Demonstration report of rectification measures
Demonstration report of rectification measures
The report model of rectification measures aims to create a safe and civilized campus, create a good environment for teaching and educating people, completely eradicate potential safety hazards, ensure the safety of teachers and students' lives and property, and ensure the normalization and standardization of teaching order. The central school has carefully and thoroughly investigated the hidden dangers in the school, and now the report on the investigation and rectification of hidden dangers in our school is as follows:

First, the hidden dangers of the school

1. The school lock can be opened without a key.

2. The cement skin on the back of the small door at the top of the playground is damaged and loose, and there are pebbles and other sundries in the playground.

The residue of fireworks is piled up on the playground.

4. The heating boiler has no inspection report from the quality inspection department.

Second, the rectification measures

School safety concerns the health and vital interests of teachers and students and cannot be relaxed at all. To this end, our school has formulated the following rectification measures for the problems found in the investigation.

1. We have replaced the new locks, and the leaders on duty have also strengthened the inspection and registration.

2. The school has contacted the village committee and sent special personnel to remove all worn cement skins and restore them to integrity. The pebbles on the playground are waiting for everyone to pick them up together.

3. The residue of fireworks piled up on the playground has been cleaned up.

4. The heating boiler has contacted the village committee and reported to the quality inspection department for inspection.

Three. Future plans

In the future, our school will pay unremitting attention to safety work and sound the alarm. And conduct regular safety education for students. We will solve the hidden dangers one by one.

* * kindergarten safety hidden trouble rectification report

In order to further strengthen the investigation and rectification of potential safety hazards in and around the school and prevent the occurrence of safety accidents, the Central School conducted a serious and thorough investigation of potential safety hazards in the school. Now, the investigation and rectification of potential safety hazards in our school are reported as follows:

First, the hidden dangers of the school

1, the kindergarten has a podium.

2, children's toys (rings, swings) weld cracking.

3. The kindergarten roof gutter cover plate does not meet the requirements.

Second, the rectification measures

School safety concerns the health and vital interests of teachers and students and cannot be relaxed at all. To this end, our school has formulated the following rectification measures for the problems found in the investigation.

1. The podium of the kindergarten has been contacted by the village committee, and someone was sent to dismantle it yesterday, and the ground was also decorated.

The toys in the kindergarten have been reinforced by welders.

3. The roof gutter cover plate of kindergarten has been welded with a new iron cover plate.

Three. Future plans

In the future, our school will pay unremitting attention to safety work and sound the alarm. And conduct regular safety education for students. We will solve the hidden dangers one by one.

In our future work, we will stick to it as always? Safety production responsibility is more important than Mount Tai? The guiding ideology, do a good job in the safety work of our school and create a safe and harmonious campus.

What is the report of rectification measures? Year? Month? The leaders of your bureau came to our company to conduct special inspections on QS certified enterprises. We made a detailed inspection of our basic situation and site conditions, put forward many valuable opinions to our company, and found many deficiencies in our site. According to the problems raised by your bureau, we will actively cooperate with your bureau to carry out the following rectification:

1, irrelevant items are put in the examination room.

Rectification measures: irrelevant items have been deleted (with photos after rectification).

The work clothes in the dressing room are not hung, but put in the cupboard.

Rectification measures: take back the locker and hang the work clothes off the wall with a hanger (with photos after rectification).

3. The doors of the inner and outer packaging rooms are all open, and the staff can enter and exit directly.

Rectification measures: the door between the inner packaging workshop and the outer packaging workshop is closed, leaving only one delivery port to deliver the packaged goods (with photos after rectification);

Organize relevant personnel in packaging workshop to carry out training, teach food quality and safety knowledge, and strengthen personnel management (with training records attached).

4. The warehouse management is chaotic.

Rectification measures: the goods in the warehouse are placed in different categories and clearly marked (with photos after rectification).

5. Failing to conduct ex-factory inspection as required.

Rectification measures: in strict accordance with the evaluation rules (attached? Year? Month? Daily inspection report).

6. The freight elevator used has not been registered for use.

Rectification measures: Remove the steel wire rope and immediately prohibit its use (with photos after rectification).

In view of the inconvenience this matter has caused to the leaders of your bureau, I am deeply sorry. At the same time, I am also very grateful to the leaders for putting forward such valuable opinions for the development of our company, hoping to give us more support and guidance in the future. Thank you! !