Hechuan district oil production corps
In order to draw lessons from recent safety accidents in our county, accurately grasp the current situation of safety production and the outstanding problems, resolutely prevent all kinds of accidents and ensure the safety of life and property. According to the spirit of the briefing on production safety held by the county party committee and government on June 23rd, and the division of responsibilities for the "100-day rectification" special action formulated by the county safety committee, this scheme is specially formulated.
I. Guiding ideology
In accordance with the overall requirements of "full coverage, zero tolerance and emphasis on practical results", we will strictly implement the new Law on Safety in Production, the Law on Road Traffic Safety and the Interim Provisions on Safety in Production, conscientiously implement the requirements of "all industries, enterprises, production and operation should be safe", and carry out in-depth road traffic, construction, special equipment and crude oil production.
Second, organize and lead.
In order to ensure the solid implementation of the special action and achieve practical results, a leading group for the "100-day rectification" special action was established.
Team leader: He
Deputy leader: Ji Cunwei? LiHaiyuan? Tian Xinwen? Shen kuangsheng? Wu Wenliang
Gao Ruifeng Liu Yongxin? Late? Quiet? Where is Luo? White? plum
Member: heads of departments
The office of the leading group is located in the Safety, Environment and Quality Supervision Section, and Cao Linjiang is also the director of the office, specifically responsible for the supervision and implementation of the "100-day rectification" special action.
Third, check the time.
20 15 June 23rd to 20 15 September 30th.
Fourth, the inspection method
The "100-day rectification" special action was organized and implemented by the safety committee of the plant, and the relevant departments were responsible for inspection and implementation, while the Safety, Environmental Protection and Quality Supervision Department was responsible for supervision and inspection.
Verb (abbreviation for verb) check the content.
(a) special rectification of crude oil production, dangerous chemicals and special equipment safety. All oil production brigades, joint stations, development departments and logistics service departments should focus on strengthening the safety inspection of special equipment such as crude oil exploitation, transportation, storage, gathering and transportation, elevators, boilers, pressure vessels, etc., to prevent the occurrence of safety accidents such as fire, explosion, leakage, poisoning, etc., strictly control the entry of special equipment, check it on schedule, strictly implement the pipeline inspection system, strictly implement various safety production rules and regulations, and quickly arrange rectification for identified safety hazards.
(2) Special rectification of road traffic safety. Vehicle management center should adhere to the combination of fixed inspection and mobile inspection, regularly and irregularly investigate and rectify road traffic safety, strictly implement road management and control measures, increase the management and control of important time nodes, holidays and other accident-prone periods, strengthen GPS supervision, and effectively improve road traffic safety management and control capabilities. Do a good job in road safety supervision of vehicles with hazardous chemicals, vehicles on duty in oil fields and vehicles with special operations in oil fields, and strictly investigate and deal with illegal acts such as speeding, overcrowding, fatigue driving, drunk driving, driving without a license, and handing over vehicles to others for unauthorized driving.
(3) Special rectification of construction safety. The Infrastructure Engineering Section and relevant responsible departments should carry out dragnet investigation and inspection on the construction site, focusing on the implementation of safety measures in key parts and links such as construction excavation high slope, tower crane, fence and simple workshop shed, construction elevator, construction machinery and construction electricity. The construction site with disorder, outstanding problems and serious hidden dangers shall be ordered to stop work immediately for rectification, and construction shall never be allowed if the safety is not up to standard. At the same time, if the project safety and quality agreement is not perfect, it should be improved as soon as possible, and the responsibilities and authority of project supervision should be clarified to ensure construction safety.
(4) Special rectification of flood control safety. All oil production brigades and joint stations should make great efforts to improve the flood control emergency plan and emergency material reserve in flood season, stick to their posts according to the duty arrangement, keep records, conduct a comprehensive investigation of key rivers, dams, sites and well sites with hidden dangers of geological disasters, register all hidden dangers in the warehouse, and start rectification and implementation to ensure safe flood season.
(5) Special rectification of geological disaster safety. All relevant departments should quickly carry out geological disaster investigation activities within their jurisdiction, further intensify the investigation of potential hidden dangers, find hidden dangers as early as possible, incorporate them into the monitoring scope in time, implement disaster prevention measures, and avoid sudden geological disasters. At the same time, it is necessary to speed up the implementation of the "security project" with the investigation and management of dangerous sections as the main content, focusing on the investigation of disasters such as sharp bends, steep slopes with collision walls, road collapse, road erosion, etc., and orderly implement reinforcement projects in view of existing security risks.
(6) Safety management and on-site inspection of foreign cooperation teams. The centralized management department of the foreign cooperation industry team shall sign a safety management agreement with the foreign cooperation industry team, and the foreign cooperation industry team shall conduct safety production assessment (whether the foreign cooperation industry team has obtained the safety production license and the corresponding level qualification, whether there is subcontracting phenomenon and whether there are projects beyond the qualification scope), focusing on on on-site safety supervision of drilling, workover, fracturing, cementing, logging, oil testing and engineering construction, and checking whether the production site is implemented in accordance with HSE and safety production standardization standards.
(seven) special rectification of food safety. All oil production brigades, joint stations, offices, vehicle management centers and oilfield engineering operation brigades should focus on strengthening the supervision and inspection of catering hygiene and strictly implement the catering service licensing system. The holding rate of catering service license 100%, and the qualified rate of preventive health examination and training for employees 100%. Strengthen the supervision and inspection of key links such as tableware cleaning and disinfection, establish a system of purchasing food raw materials with certificates, and carry out special spot checks on key foods purchased.
(eight) special rectification of gas safety in family areas. The Logistics Service Section shall publicize, educate and inspect the gas safety of natural gas pipelines, owners and shop users in front of the family area, resolutely eliminate hidden dangers and ensure gas safety.
Six, check the steps
(a) self-examination and rectification stage (June 26th to August 26th). All departments should comprehensively carry out carpet-type safety hazards investigation and rectification actions. Strictly implement the system of "graded responsibility, tracking efficiency, and sales number management", establish a ledger for the hidden dangers found in the investigation, clarify the responsible person, governance measures, governance time limit and governance standards, and promote the institutionalization and regularization of hidden dangers investigation and rectification. All departments must report the summary of self-inspection and rectification to the Safety, Environmental Protection and Quality Supervision Department before August 3 1.
(2) Inspection and acceptance stage (August 27th to September 10). The safety committee of the factory will organize personnel to inspect and accept the self-inspection and rectification of all departments. Those who cause safety accidents due to false investigation, improper measures and ineffective rectification will be held accountable in strict accordance with relevant regulations.
(3) Accept the inspection and acceptance stage of the county safety committee (September 1 1 to September 30th). The county safety committee will organize relevant departments to carry out inspection and acceptance in the way of "four noes and two noes" without informing, greeting, listening to reports, accompanying, going straight to the grassroots and going straight to the site according to the laws and regulations on production safety and the hidden dangers of various production units.
Seven. job requirement
(1) Strengthen leadership and attach great importance to it. All departments should strengthen leadership, strictly implement the requirements of "Party and government share the same responsibility, one post and two responsibilities", ensure that the top leaders are personally in charge, decompose tasks at different levels, implement responsibilities step by step, further promote the development of all work, further refine and clarify the key points, steps, requirements and measures of inspection work, and prevent the occurrence of safety accidents.
(2) Work hard to achieve practical results. According to the requirements of "zero coverage and zero tolerance", the problems and hidden dangers found in the inspection should be rectified and implemented in time, major hidden dangers should be reported in time, rectification requirements and measures should be put forward, plans should be made, the person responsible for rectification should be identified, the rectification period should be defined, the rectification management situation should be tracked at any time, and the number elimination system should be implemented to ensure the timely handling of hidden dangers and ensure safety in production.
(3) Consolidate the responsibility and strictly investigate it. In accordance with the principle of "who checks, who signs and who is responsible", consolidate the responsibility. Where safety accidents are caused by ineffective special rectification work, inadequate inspection, incomplete rectification of hidden dangers, and completing formalities, the relevant responsible persons will be seriously investigated and will not be tolerated.