When the work reaches a certain stage or comes to an end, it is necessary to carefully analyze and study the work done in the previous paragraph, affirm the achievements, find out the problems, and sum up the experiences and lessons, so as to better do the next work. The following are three annual summaries of Party A's field representatives for your reference.

Tisch

Under the correct leadership of the company's leadership, with the strong support and cooperation of colleagues from all departments of the company, and with the close cooperation of our department and the * * supervision department and the * * project department of the * * company, the work of 20XX was successfully completed. During this year, every member of the engineering department can abide by the company's rules and regulations, be strict with themselves, be honest and self-disciplined, work hard, integrate theory with practice, and cooperate with colleagues to solve various problems in construction.

The 20XX work of the engineering department is summarized as follows:

I. Completion of Main Work in 20XX

1, the completion progress of the project

* * There are eleven new home projects. For various reasons, five buildings were started in 20XX. By this winter, the main buildings of * *, * * and * * have been capped, the foundation of * * has been completed, the earthwork of * * and * * buildings has been shipped out, and other buildings have not started.

Judging from the overall progress, the projects that have started do not meet the requirements, mainly because the construction team is unstable, the funds have not been put in place, and some construction contracts have not been signed.

Unstarted projects are mainly affected by relocation. However, the preparatory work of the engineering department has been implemented, and construction can be started immediately as long as conditions permit.

2. Preliminary procedures.

Complete and basically complete the preliminary work of the * * and Rongshan projects.

According to the actual situation of * * New Home Project, in order to make the relocated households move back on time, the company decided to go through the preliminary commencement procedures for plot 1 and plot 2 respectively, and complete the formalities for plot 2 with good quality and quantity before April 15, 20XX, so as to ensure the timely commencement. The bidding procedures for plot 1 have been reported to the Municipal Construction Committee for approval.

After many times of communication, it has basically passed. Because the construction team has not yet been implemented and the bidding work has not been carried out. In order not to affect the normal construction of the project next year, the engineering department will speed up all the procedures before construction.

The competition of Rongshan project planning, architecture and environmental design has been organized and completed, and the scheme is being adjusted. 20XX can be completed on February 20th, and submitted to the Municipal Construction Committee for approval.

Completed the rerouting project of the 73-meter-long waste heat pipeline of Benxi Iron and Steel Heating Company, and now it has been supplied with water for heating normally. * * The ditch reconstruction project has completed 240m rubble wall (both sides in total). Complete the engineering drawing design of the new bridge 1 and 2. The bridge 1 has been completed.

Outdoor supporting pipelines have been designed for water supply and communication, outdoor pipelines for power supply and heating are being designed, and gas and drainage are in contact.

4. The investment in Shanxin Home is completed.

Up to now, the progress payment approved by the engineering department is: 500,000 yuan for * * and * * buildings; * * building 300,000 yuan; * * building 300,000 yuan; The affiliated project is 6,543,800 yuan+0,600 yuan.

5, with the situation

Actively cooperate with the materials department, timely provide the amount of materials in each stage of construction, ensure the normal construction, and there is no shutdown due to materials.

Second, * * New Home Project Construction Process Control and Management

1, organization and management

According to the characteristics of the * * new home project, the engineering department requires the construction team entering the construction site to improve the organization and management system, define the management objectives, and focus on controlling the project quality, progress and investment in the construction process. The way is to improve the organizational management system and accept the inspection of major departments at any time.

2. Quality, schedule and investment control

2. 1, quality control

Focusing on the provincial model project objectives preliminarily determined by the company, the engineering department and the supervision department have divided their responsibilities according to their specialties. In the main construction stage, the civil engineer is responsible for the structural engineering, the plumbing engineer is responsible for the accuracy of the reserved position, and the electrical engineer is responsible for the pipeline embedding work. Inspection and acceptance shall be carried out in strict accordance with the specifications during construction. Found the problem, rectification within a time limit, to ensure that the project quality is not a big problem.

Examine and approve the supervision plan and construction organization design of the construction unit before construction, put forward improvement requirements for the insufficient parts, assist them to improve the formulated measures, and ensure that the internal work guides the external work.

In the process of construction, check the implementation of various measures, ask questions in time and ask for rectification, give full play to the management function of supervision, and supervise whether grass-roots supervisors carry out quality management according to the requirements of supervision planning according to the rights and obligations stipulated in the supervision contract.

Material is the key to engineering quality. Strictly check the materials provided by the company and purchased by the construction unit, put forward quality opinions, ask the material clerk to return the unqualified materials, inspect the rejected materials, and determine whether to use them according to the results. The electrical engineer raised an objection to the electrical pipeline material and asked the construction unit to re-examine it before deciding whether to use it.

In the process acceptance stage, the construction unit is required to conduct self-inspection, self-inspection and self-inspection, and strengthen its own inspection and acceptance. The supervision unit implements the system of inspection, standby and inspection, and strengthens the process quality control. Engineering personnel carry out quality control through the combination of irregular sampling and peacetime inspection, and check the supervision records of the supervision unit, sometimes in conjunction with the supervision personnel for acceptance. Fully grasp the quality of the whole process of project formation.

2.2, schedule control

In order to make the whole project go on in an orderly way as planned, the engineering department has formulated the overall progress plan of the new home project, and defined the work content and duration. Before implementation, it will be distributed to all construction units and supervision units, requiring the construction units to put forward corresponding detailed construction plans according to the requirements of the general plan, and supervise the implementation after being audited by the supervision.

In the process of construction, always check whether it is implemented as planned, analyze the problems found in time, take effective measures to discharge, or adjust the plan to ensure the final realization of the schedule.

The engineering department examines the monthly progress report submitted by the construction unit through supervision, and requires the supervision engineer to supervise and inspect the progress implementation during the project construction. At the monthly supervision meeting, summarize the progress of the project, put forward solutions, and require the construction unit to take various measures to implement them until the construction period is adjusted.

2.3, investment control

The main content of investment control of the engineering department is to review the construction budget, deal with site changes and visas. Answer the questions raised by the construction unit in the construction process, actively coordinate all aspects, foresee possible problems, and put forward corresponding countermeasures to prevent unnecessary visas.

Keep the records of completed projects in time, and complete the procedures for engineering changes, site conditions and technical measures. Review the monthly report of engineering quantity of the construction unit, compare whether the actual quantity is consistent with the reported quantity, and control the investment.

Review the changes and visas of the supervision engineer after the audit, put forward opinions and report them to the relevant leaders for approval. The person in charge of the site made it clear that the site supervision engineer asked the supervision engineer to communicate with the relevant personnel of the engineering department and reach an agreement before putting forward the review opinions on the changes and related economic visas proposed by the construction unit, and the person in charge of the site agreed, otherwise the supervision department would be responsible for all possible results. Any changes and visa requirements shall be subject to the written text.

3, safety and civilized construction management

According to the safety and civilized management objectives of this project, the engineering department, the supervisor and the construction unit jointly participate in the management, and carry out the safety regulations and production regulations during the construction process. Don't command and lead in violation of regulations, and the builder doesn't operate in violation of regulations. The supervision engineer should do a good job in safety control to ensure that no danger, accident, personal injury and property loss occur during construction.

Supervise the supervision engineer and the construction unit to manage in accordance with relevant laws and regulations, so as to ensure that the construction site is orderly, civilized and safe, does not disturb the people, and the environmental sanitation meets the requirements. Coordinate internal and external relations to create a good environment for normal construction.

4. Construction of Engineering Department

Over the past year, through mutual understanding, everyone's business level and work ability have become familiar with each other. Everyone can go to work and use their spare time to strengthen their business study.

Due to the instability of the budget plumbing staff, it brings a lot of inconvenience to the usual work, such as the proposal of material quantity, the audit of the construction unit's progress plan, the audit of bidding quotation and so on.

Except for the * * building, * * building, * * building and * * building, the budgets of other buildings have not yet been formed.

Three. Lessons learned and improvement measures

* * After nearly a year's construction, the new home project was inspected irregularly at ordinary times, and it was comprehensively inspected in 20XX165438+1October/0/3, and accumulated experience in handling various formalities in the early stage. It is found that there are both successful experiences and failed lessons in all aspects. The following is a summary. Next year,

1. Before going through the formalities, carefully consider the reported items, minimize changes and shorten the processing time of intermediate links. If the planning scheme is passed, report it to the lobby completely or return it.

2. The selection of the construction unit shall be determined through bidding, and a powerful construction enterprise shall be selected. Sign the construction contract in time, define the time limit for a project, investment, quality and safety requirements, and create favorable conditions for the management in the construction process. * * For various reasons, the supplementary agreement has not been signed. In the future, development projects will be selected through public bidding according to their own strength.

3. The supervision unit chooses public bidding, signs a supervision contract, clarifies the supervision responsibilities and rights, gives full play to the role of supervision during the construction period, and is managed by the development unit to reduce the personnel investment of the development unit, mobilize the enthusiasm of the supervision personnel, and manage the project well, otherwise the supervision unit will be held accountable. * * The supervision department adjusted all the supervisors from the beginning of the project, and the engineering department also fined them once, but now the quality of the supervisors is still very low.

4. On-site management personnel should give full play to the role of supervision engineer, strengthen the inspection and acceptance of intermediate links, dare to manage, ensure the quality of subdivisional work, and improve the overall quality of the project.

5. Through inspection, it is found that the archives of each unit are not arranged in time. Site supervisors are required to strengthen file management and check the progress of the project at any time. It is strictly forbidden to make up after the completion of the project, and lay a good foundation in archives. Due to the untimely supervision and inspection, the archives were rebuilt.

6. Strengthen cooperation with relevant departments and strictly control the quality of materials together with the supervisor. Unqualified materials are put forward in time and are strictly forbidden to be used in the project. Because there are many materials provided by Party A, this aspect should be strictly controlled.

7, increase the intensity of rewards and punishments, severely punish the construction units that violate the rules seriously, and reward the excellent construction units in all aspects. Several fines have been imposed on construction units this year, which have little impact on some construction units.

Four. 20XX working assumption

1, strengthen the internal management of the engineering department, use winter to strengthen professional knowledge learning, be familiar with drawings, and make good preparations for construction. Try to arrange an hour of study every afternoon.

2. I hope the company has all professionals, namely a civil budget officer, a water heating and electricity budget officer and a water heating engineer, to strengthen communication among professionals, form a joint force, and strive to achieve personnel stability. Ensure the smooth progress of the project construction.

3, Rongshan, * * project give full play to the role of on-site supervision, in addition to the economic visa, other aspects should be supervised. The engineering department shall set up a site general representative to be responsible for personnel management. Hydropower engineers are responsible for Rongshan and * * projects.

4, on-site management to carry out the responsibility, division of labor and cooperation. Strengthen the supervision regular meeting system and the inspection of intermediate acceptance links, verify the progress plan report in time, put forward opinions and reports, and suggest timely funding.

5, the engineering department of various professional engineers to collect information in time, and supervise and inspect the completion data of the construction unit, to prepare for the completion acceptance of the completed project.

6. Cooperate with materials department, site general manager and various professional engineers to make suggestions on materials.

Ministry of materials and equipment purchases in strict accordance with the requirements of drawings, and usually communicates with various professional engineers. Unqualified materials are not used in the project.

7. I hope that next year, focusing on engineering construction, funds will be allocated in time according to the situation of funds and the progress, so as to ensure the timely completion of the project.

extreme

From 20XX 10 to August 20 12, I reviewed my work in these two years, calmed down, summed up my achievements and gains, and found out my shortcomings, so as to facilitate better work in the future.

In the past two years, with the strong support and care of the company leaders and colleagues, we have conscientiously implemented the leaders' decisions, completed the tasks assigned by the leaders, and worked diligently. My work in Kaixian for two years is summarized as follows: 1. Work content:

I am the field representative of XXXXXX company, mainly managing XXXXXX project. I came to work in XX, where I have been honed and grown. As a novice, I have great deficiencies in engineering technology and project management. Engineering technology is the basis of project management. Learning engineering technology has become the focus of my future work. Although these two events are not very big, even in such events, I have experienced an extraordinary period of exercise and tempering. I am very grateful to the company leaders for giving me this platform for growth, so that I can keep learning and making progress in my work and improve my quality and talents.

Before the formal construction of the project, do a good job in the technical disclosure of the construction drawings, fully understand the specific situation of the whole project, judge the difficulties and key points of the project in advance, and take preventive and solving measures. Technical disclosure is the central link of construction technology management; In the construction process, it is very important to strictly control the quality. For the construction of key parts of the project, it is necessary to arrive at the site in advance, check the construction preparations, and make a written site record in time and completely. Do a good job in daily patrol, inspection and inspection of each process of general construction; After consulting the construction organization design and special scheme design, according to the characteristics of each working procedure and each part of the construction, make special oral and written disclosure, and make a good record of the construction log to avoid rework or

Irretrievable quality accident. In the construction of pipe network engineering, most of them are completed by machinery. The determination and control of elevation is the key to project cost control, and so is the construction sequence. Trench excavation should be deep before shallow. You should be familiar with underground pipelines, avoid deep digging, wrong digging and re-digging, and avoid the cost increase caused by repeated use of machinery. Among them, my engineering technology and construction experience have been improved, but my outsourcing ability is still lacking, and I will try my best to do it well in the future. Second, the work attitude

A hard work, a harvest, so I have been working hard, studying hard, working hard, loving my job, being able to treat every job correctly and seriously, working hard, attending classes on time, making effective use of working time and sticking to my post. Due to lack of work experience, I often get into unnecessary trouble because of misjudgment. In the process of communicating with the company's vice president, he gave me great inspiration in thought. He always works without saying anything and explains it to me completely? Talk less and do more? The meaning of these six words. I admire his professionalism and serious and rigorous work attitude, which made me see the company culture clearly. So for me, this is an example. Although there will be pressure, persistence will eventually win. Third, experience

In the past two years, I have always insisted on being strict with myself, talking less and doing more, respecting leaders, uniting colleagues, always safeguarding the company's reputation and trying to do my job well. When I first joined the company, the company trained new employees in corporate culture and company rules and regulations. I deeply felt the thoughts of the company leaders and gave me direction and encouragement in my future work. I have been paying attention to the development of the company, thinking about the interests of the company, and I am full of enthusiasm and expectation for the future of the company. Joining the Party is a task of my future work, and I will strictly abide by the standards of party member.

Beg for yourself. I start from doing my job and daily work, from me, from small things, do my job well, improve my job skills and be loyal to my duties. Fourth, shortcomings.

A master can consult his leading colleagues personally and technically, but he must have his own set of methods in management. Technology is the foundation of management, but management can also guide technology. I have little management experience and even less understanding of engineering data. Therefore, in the new year, it is my goal to make up for the shortcomings.

XX project is about to be completed. Facing the next project coming at any time, there are pressures and challenges, which can be described as a long way to go. Cherishing is the basic point of a perfect life, and being practical is the guarantee of career success; In the future work, no matter whether the work is boring, colorful or heavy, I will learn lessons from my work, sum up experience, lay a solid foundation for my future work, work hard with my colleagues, inherit the company's corporate culture and make due contributions to the company.

Tisso

From August 9th to * * * *, for more than two months, with the correct leadership of * manager and * manager and their own efforts, the work went smoothly. I am very grateful to the two respected leaders for their guidance and help in all aspects. During this period, I paid a lot and gained a little. Whether it is professional ethics or professional skills, I have a deeper understanding and more promotion. It quickly adapted to the work of the site management representative of the construction party.

During this period of time, I was excited and full of painstaking efforts when I arrived at this large construction team every day. It's full of vigor and vitality, and this new thing is growing. This is an inspiring trend, which makes me unconsciously full of passion. Through observation and thinking, as well as intentional or unintentional communication with the supervisor and the construction party, I have a feeling that there are many problems in management, or there is a lack of spare capacity, or there are various reasons. Supervisors often fail to fulfill their due responsibilities, mainly because their professional skills are not up to standard, and they dare not take care of the surface just because they don't understand management. Of course, the result can only be mismanagement. The lack of execution of the project department of the construction party is particularly obvious. The boss of each bid section is mercenary and has no deep understanding of the concept of engineering. The boss is subject to the foreman and technicians everywhere, and the technicians are obedient to the boss. Even if they have their own plans, supervisors and goals can't be fully implemented. Managers become monks halfway and fail to reach the professional level. The root cause is thought, which determines attitude, and attitude determines action. If you don't go ideologically, others will find it difficult step by step, so frequent ideological communication is very necessary.

I don't think there should be such a sense of superiority to the position of field representative, let alone the right to abuse it. This is a very important responsibility. To put an end to the idea of a small family, we must recognize the nature and responsibility of work and have a broad mind. This is a project. Only when the project owner, supervisor and constructor cooperate with each other, and Qi Xin works together to coordinate the multi-party relationship in one direction, although all parties have their own interests, only when the project is completed can all parties get the maximum benefits. Let me make a comprehensive summary of my previous work.

Since the satellite positioning pile was fixed in the sixth district on August 23rd, I mainly cooperated with Wang Jian to do the work in the sixth district. I made up my mind to start a new life here. I firmly believe that life is about struggle, and I am willing to make every effort.

1. Satellite positioning pile. Together with survey technicians and construction technicians, I carried out satellite positioning and piling for the newly opened Building No.6 16, marked the position and quasi-guiding point of each pile in each building, protected the piles in time, and made detailed records on site. There is no coordinate for building 46, so I calculated the building with the general manager and located it. Once in the back, when the forklift was carrying sand and gravel in the yard, the pile in the northeast corner of Building 43 was crushed by the forklift and moved. We re-measured in time according to the drawings. After this process is completed, each pile should be driven in time.

2. Pay-off and dig the foundation trench. In order to ensure the progress of the project day and night, 24-hour uninterrupted construction, I stand guard 24 hours a day. Although everyone is very tired, I still dare not take it lightly in order to ensure the depth of excavation. When encountering obstacles such as houses and telephone poles, we will record them and work with relevant departments to eliminate them. After trenching, track the drilling process and make records. Then, the geological inspection tank was invited, and the opinions of deepening the proportion of sand and gravel in 43# and 49# buildings were accepted.

3. Pouring mat. Before pouring the cushion, I carefully studied the drawings of each building and communicated with the construction technicians, but I didn't expect the progress to be so tight, and because of some factors such as the failure to implement the big contract, I was in a hurry, and even the template size in the center and around the room was not removed, so it was all water.

4. Preparation before slot inspection in each bid section. 1. The erection of the project department and temporary buildings should be planned in a unified way, with all parts facing the same direction, so as to ensure the orderly construction site. 2. Fence erection: including color steel tile and steel pipe dense net. 3. The construction of temporary roads in each bid section shall be unimpeded and maintained at any time. 4. Doorbell masonry in each bid section. 5. Five pictures and one card, and various safety warning signs. 6. The place where workers' vehicles are put is surrounded by steel pipes.

7. Tower crane installation for the record, tower crane driver license. 8. Site hardening: including reinforcement area, carpentry area and material storage yard, baking-free bricks shall be laid according to the actual wishes of the construction party. Set up protective shed in reinforcement area and woodworking area. 9. Safe electricity consumption is up to standard. Ensure civilized construction and safe construction smoothly.

5. Check the reinforcement of each bid section, first check the appearance of the reinforcement, and then carefully check the product certificate, factory inspection report and nameplate, and don't let go of every detail. If it meets the requirements, sample again. Take the length of each steel bar as 1m, measure its weight and compare it with the theoretical weight. Samples within the deviation range can be sent to the quality supervision station for testing. Put an end to unqualified materials entering the site. In addition, all steel bars must be processed on site, and the processed steel bars will not be accepted.

6. Study every detail of the drawings, make records and prepare for joint examination.

Seven. Other tasks assigned by leaders, no matter big or small, are done with all their heart.

I was very excited when I was told by the leader that the management mode of the fifth and sixth districts should be reformed. This is both an opportunity and a challenge. I am young, enterprising, and have time and energy. I have been working in the sixth district since I started to break ground. I'm determined to continue working in the sixth district. I am full of confidence in myself and set higher demands on myself.

In action, find out the shortcomings, learn from leaders, predecessors and colleagues, and improve and improve management methods. Constantly improve their own views and awareness, constantly improve their professional quality and level, strengthen their sense of responsibility, strengthen management, not afraid of hardship and fatigue.

Ideologically, a strong sense of responsibility is the most important thing. Strictly abide by the moral conscience line in your heart, pure land. Don't have any contact with the construction party outside of work, let alone make fun of the direction. Remember, it's a small gain and a big loss. My career path has just begun, and I am strict in self-discipline and self-care now and in the future.

In our work, we will never give in where we should insist. We should not be rigid and stubborn in adjustment. We should pay attention to principles and methods in our work. It is necessary to combine hard and soft, combine hard and soft, and communicate with the construction party more, so as to be soft and hard every day. After the reform of management mode, the workload will inevitably increase. Through this form, we will strive to achieve the four controls, three inspections, two sides standing and one coordination required by General Manager Qian, improve management execution and implement the construction organization plan. We will do what we say, step by step, interlocking, and finally do a solid job and safeguard our interests.