Current location - Education and Training Encyclopedia - Education and training - The builder's work summary
The builder's work summary
Time goes forward step by step on the annual ring, and a period of work has ended. Looking back on my past work, I feel very fulfilled and gained a lot. Write a work summary, draw lessons and guide future work. However, I found that I didn't know what to write. The following is my summary of the builder's work (5 general remarks) for your reference, hoping to help friends in need.

Summary of the builder's work 1 Time flies. A year has passed in a blink of an eye, and I have learned a lot about being a man here. Here, I feel the hard work of the working people, working hard with sweat and paying with physical strength, and I also know the fatigue of my parents running around for work and life. In short, an effort is a harvest. Now I have a summary to review my past work:

For the builder, he must first master the daily work content, master the technical requirements and construction technology of daily construction, so as to better handle it in the field management and coordination. The website is a place where one's ability is extremely tested. It is not only the mastery of technology, but also the management and coordination of the whole construction site. Especially when many processes cross, it is necessary to deal with related matters and avoid unnecessary troubles.

In this year's work as a builder, I gained a lot, not only mastering the construction knowledge, but also greatly improving the communication with people at all levels, including getting along with colleagues, getting along with subcontractors, and even communicating with construction units and supervisors. All this has benefited me a lot.

In terms of construction technology, I once left the doors and windows in the wrong position because I didn't look at the changes made by the technical team. Fortunately, our foreman xx found and corrected it when he reported it. This matter touched me a lot. As a qualified builder, we must be sensitive to technology. In actual construction, we often encounter various design changes. Construction personnel must know and thoroughly understand these changes at the first time before they can really command the site. I didn't do a good job of sorting out the information, leaving a lot of information, and it was embarrassing to make up the information temporarily. In the future, the construction data must be parallel, so as to ensure a serious working attitude and lay the foundation for the future data collation.

The construction industry is different from other industries. It needs constant on-site inspection and supervision in order to find and solve problems at any time, and these works are carried out in the harsh environment on the spot. This requires us to constantly cultivate the spirit of hard work, not afraid of hardship and fatigue, let go of the lofty attitude of managers, and constantly enrich our learned talents from the actual work of the project, so that our on-site comprehensive processing ability can be exercised and improved. We must believe that there is no reward for giving, and there is no reward for not giving. As a younger generation, we should carry forward the spirit of hard work and spare time to communicate with workers while working. Let's talk about family life together and give the worker a cigarette. Workers will also take this as a sign that we respect him. After communicating with workers technically, workers will be willing to listen and accept, and their work can be carried out well. It is said that we should always keep close contact with the masses and workers so that the workers can feel our project department.

During the year's work, we all tried our best to save materials for the boss and warned the workers not to waste materials. All the available half bricks were used, and all the cut materials were used as much as possible for the secondary structural reinforcement to fill the river.

Next year's comprehensive building will be launched soon. The comprehensive building basically contains all the contents of civil engineering, and has the characteristics of large engineering quantity and great difficulty. In my opinion, this is an opportunity to learn. We should work hand in hand to create greater glories for XX Company.

These are some of my experiences since I joined the work. I will gradually set a good position for myself in the future work and study process, and make a better plan and summary of my future work. Architecture is an art. We are all architectural artists. We chose architecture and XX. I believe this is a career that I can fight for all my life.

Summary of the builder's work 2 On the occasion of this new year, I made an analysis and evaluation of my work according to the actual situation of my work, summed up the experience and lessons, and put forward the improvement methods, so that I can learn from the past lessons, make up for the weaknesses in my future work, and provide a basis for continuously improving my work methods and improving my work efficiency in the future.

First, perform job responsibilities.

As a manager, we should first put safety first, secondly pay attention to controlling the construction quality of the project, thirdly coordinate with the management of the construction unit, supervision unit and team, and finally save materials, avoid waste and minimize the cost. There are mainly the following aspects:

1, security:

A, people's unsafe behavior.

B. Unsafe state of things (equipment).

C, bad production environment has a negative impact on people's behavior and the state of things.

D, the lack of management is an important factor in the accident, and sometimes even a direct factor. We must ensure the safety of personnel, which is the guarantee of construction.

2. Project quality management.

In the early stage of construction, pay attention to the technical disclosure of the team, pay attention to the team members ideologically, and understand the quality, progress and safety requirements of the project technically, so as to lay a good foundation for the later construction.

3. Team management and coordination.

The cooperation of the team leader is very important. They work hard every day and contribute silently to the construction with a pair of small hands. We should take the initiative to care for and sympathize with them. They should take the initiative to help when they are in trouble. The problems raised by workers should be solved in time.

4. Coordination with the construction unit and supervision unit

As a construction manager, I have paid attention to the coordination with the construction unit and supervision unit since the West China project started, and took the lead in studying and implementing the good suggestions put forward by the construction unit and supervision unit, which won unanimous praise from the construction unit and supervision unit.

5, material management work

Based on the principle of cost saving, we strictly control the control of raw materials in the actual work process, and every penny is spent on the project in the use of formwork, concrete and steel bars. For example, after the construction of each floor is completed, it is important to ask the reinforcement team to sort out and collect them, all of which are used for the lower construction. The concept of cost saving has been implemented in the actions of each team to save costs in project construction.

6. Technical management

In the work, the requirements for construction technology are more stringent. During the working year, 37 work contact sheets were put forward, which played a certain role in the project schedule. For example, in the civil air defense construction from June 5438 to February this year, I took the initiative to negotiate with the leaders of the project department and put forward the construction technology of changing the post-pouring belt into the strengthening belt. After receiving the affirmation and support from the leaders, I negotiated with the construction unit, supervision unit and design institute for many times, and finally achieved the expected goal, and regained a certain time limit for the civil air defense project construction.

Second, new works

In my work, when I meet some new jobs, I always actively cooperate with the company and the project department and actively participate in the performance of 20xx on May 20th. This exercise has won a good reputation and far-reaching influence for the project department.

Third, the attendance rate

This year, I insisted on leaving Man Qin without being late, leaving early and being absent from work. All activities organized by the unit can be present on time and actively participate.

Fourth, the ideological situation.

In order to improve their ideological understanding and political consciousness, the company's policy. Pay attention to learning new technologies and apply them to practical work. V. Existing Problems and Improvement Schemes While I have achieved good results, I also have some problems in my work. For example, some common quality problems still exist.

In order to improve work efficiency and quality, I will focus on the following aspects in the next stage of construction:

1, strengthen various political studies and improve personal cultivation.

2, strengthen business learning, improve business quality, improve the quality of work.

3. Work creatively and think more about ways to improve working methods. Improve work efficiency, make preparations before each work, and don't fight unprepared battles.

4. Strengthen communication with the leaders of the institute, so as to deepen the supervision work.

Summary of the builder's work 3 In retrospect, I spent almost two months in this project department unconsciously. These two months, I am very busy and full. During this time, I have accumulated experience and learned lessons. Here, I will make a summary of my work during this period, so as to foster strengths and avoid weaknesses in future work and do a better job in electrical technology.

On the project, as an intern, I was mainly responsible for the electrical and water supply and drainage works of buildings 8#- 17# and 22# in the first phase of the project, and supervised the temporary electricity consumption on site. At work, I got the support of the leaders of the project department and the enthusiastic help of my colleagues. I am full of deep gratitude and confidence in my work, and I can finish my work in a pleasant and relaxed environment.

I summarize from the following aspects:

A, engineering drawings review and technical disclosure

Upon receipt of the engineering drawings, the drawings shall be reviewed in time, and the design contents, high voltage system, weak current system, water supply system and drainage system of the drawings shall be checked one by one, so as to solve them in time during the blue prints.the design. If there is any conflict with the drawing construction, negotiate with Party A in time to lay a good foundation for the smooth progress of the project. According to the approved construction organization design and construction scheme and the current quality acceptance standards, the technical disclosure of technology, quality and safety is carried out for the construction team managed. Due to the lack of design drawings that meet the use function, Party A often makes temporary changes during the construction process. For the changes that can be signed before construction, it is timely and accurate, and some changes cannot be signed before construction, so they should be verified immediately after construction.

Second, the site construction management and strict quality control

In order to improve the quality awareness of the construction team, the team leader is given corresponding preventive measures for defects such as quality, reservation, slotting, distribution box installation and lightning protection welding, and at the same time, mistakes are often corrected at the scene, causes are analyzed and corresponding preventive schemes are put forward, and the civil construction team is consulted in time to avoid affecting the main project progress. Inform the construction team of possible problems in the secondary structure at any time, and check the concealed works. Subsequently, strict requirements were put forward for the construction quality of this department, and the quality problems in each building were inspected and rectified in time. In order to better cooperate with the overall progress of the project, the working procedures that affect the overall progress of the project should be solved on the spot in time. Strictly ask the team to develop good work habits so as not to bring inconvenience to other teams. In terms of construction quality, we require the team to pursue beauty and neatness while pursuing quality satisfaction.

Third, raw material control and data archiving

With the intensification of market competition, all kinds of unqualified products can enter the site at any time. In order to ensure the quality of the project, all hydropower materials entering the site have undergone strict inspection. We are fully aware of the importance and arduousness of this work, so we are determined to do this work well and prevent unqualified materials from entering the construction site. In order to avoid the waste or loss of engineering raw materials, we issued a notice to all construction teams to clean up and utilize raw materials, and at the same time, carried out the secondary design of electrical construction drawings, lines and pipelines without changing the design intention, which played a certain role in the management of building numbers.

Material certificate, material test, concealed engineering acceptance, inspection lot quality acceptance and partial engineering quality acceptance shall be timely and accurately collected, and Party A's land engineer and supervision engineer shall be found in time to sign and seal, so that the inspection lot, partial acceptance, concealed acceptance and material test dates of construction materials are consistent with the actual construction dates, and meet the requirements of construction data compilation. And timely sort out and file the engineering data to ensure the authenticity, integrity and effectiveness of the construction data.

Fourth, safe and civilized construction

According to the spirit of the safety instruction of the project department, the temporary water and electricity use and civilized construction on the construction site are inspected every Monday, and potential safety hazards are handled in time. Reduce the occurrence of electrical safety accidents in the construction process and create favorable conditions for the smooth construction of the whole project.

My biggest gain during this time is:

1, quality control of each building

2. Reduce the intersection between this project and the whole project.

3, control the waste of raw materials

4. Ability to deal with practical problems on the construction site.

The biggest deficiency in my work:

1, the requirements for safe and civilized construction of each team are not strong enough.

2. The quality management of shift workers is not in place.

3. Sometimes there is a lack of punishment for the construction team leader.

Future work plan:

By summing up my work during this period, I found many shortcomings in my work in order to overcome them in my future work. At the same time, we need to read more books, study specifications, atlas and related documents, master professional knowledge, improve our working ability, strengthen our sense of responsibility, and do a good job in time.

Generally speaking, I am not satisfied with my work in this project. In my future work, I will constantly sum up and reflect, constantly motivate myself, enrich my energy, overcome my shortcomings, study new working methods and improve my work level. I firmly believe that I will improve myself in my future work to adapt to the development of the times and enterprises and grow together with the company.

For the bright future of our project department, let our departments, with the support of leaders, overcome all kinds of difficulties and meet a brighter future of our project department with more advanced management mode and updated attitude.

Summary of builder's work 4 In July of 20xx, I came to Shengjian Group to work, which was the first step for me to move from school to society, and it also affected my future. In this year's work, I have cultivated my attitude towards work and how to treat people and things, and learned the difference between society and school. With the help of the leaders of the project department and the master, I learned a lot that I couldn't learn in school and benefited a lot. Now I will summarize some things I have learned in this year as follows:

First, ideological understanding

When I came to Xuanning Project Department, I came to a new group. The quality of this project is closely related to everyone in this project department. Each of us is a member of this project department. We should strive to pursue the benefits of the project department, reduce unnecessary waste and save money for the project department. Here we should be a whole team, cooperate with each other and work hard, and we can't affect the collective interests for personal reasons. Unite everyone and be strict with yourself. I am a member of this group.

Second, the experience and lessons in the work

In this project department, my job is a surveyor, who is responsible for the measurement work on the project, mainly the recheck of bridge coordinates and elevation, and the measurement of some changes. I have learned a lot in this position, and the most important thing is that I need a serious attitude in my work. There must be no negligence in the measurement work. If there is a deviation in measurement, the error is irreparable. Measurement is the basis of all work. The follow-up work can only be continued after the measurement and setting-out work is completed. If there is a mistake from the beginning, it is a step wrong and a step wrong. Therefore, a serious work attitude is necessary.

Three, my work is mainly divided into the following parts.

(1) Bridge elevation and coordinate recheck

The work of the Second Bridge Team must be strictly supervised, because the accuracy required by the bridge is relatively high, and because the surveyors of the Second Bridge Team are careless, mistakes often occur in the survey and setting out work, so the correctness of the construction survey must be strictly checked.

Before measuring and setting out, I will ask the surveyors of the construction team to check the calculated coordinates and elevation with me, and the setting out can only be carried out after it is verified. If there is a mistake, find out where it happened and whether you have made the same mistake before.

The investigation process must be controlled from the beginning. If the slope of the third and fourth bridge decks on the left side of the main line No.2 bridge changes, the position of the slope change line should be determined before the scaffold erection, so as to ensure the accurate erection position of the underground I-beam of the slope change line in the future and ensure the accuracy of the bridge slope change line. In elevation control, control should be started when scaffolding is set up, and precise control should be carried out after the bottom plate is laid. For large bridges, the pre-camber should be increased in the process of bridge deck erection to offset the deflection during concrete pouring.

In the process of measurement, the rear intersection method is often used for lofting. In the process of rear intersection, it should be noted that if the included angle between two traverse points is small, it will affect the accuracy of intersection and thus the accuracy of lofting. Before roof elevation measurement, it should be reported to the supervisor for inspection, and at the same time, strengthen self-inspection to ensure accuracy.

(2) Benchmark measurement

In the process of construction, traverse control points should be frequently re-measured to ensure the accuracy of leveling points and traverse point coordinates and elevations used in the construction process.

In the process of leveling point measurement, attention should be paid to the use of ruler pads, and tower rulers should not be placed anywhere. Attention should be paid to the equality of sight distance before and after to eliminate the error caused by sight distance in the measurement process. In addition, everyone has the habit of reading, so one should read as much as possible during the measurement to avoid reading errors. In the process of measurement, the method of changing the height of the instrument or observing by two people at the same time should be adopted to ensure the accuracy of the height difference between two points without stations. If the reading is large at a time, shake the tower ruler back and forth to read the minimum value of the crosshair, because the height of the tower ruler is the smallest when it is perpendicular to the ground.

(3) Calculation of earthwork volume

There are many discrepancies between earthwork and design drawings, which need to be changed. This requires the measurement of engineering quantity, mainly using section method to determine the changed engineering quantity. Such as YJK46+072- 135 low fill shallow excavation section, that is, from the original ground to the top elevation of 94, YJK45+643. 73-758 replacement section, from 96 roof to 94 roof, and AK0+000+060 section dredging survey. In the process of measurement, elevation adjustment can be carried out to increase the engineering quantity and strive for profits for the project department. For example, when measuring the original ground elevation, the pole height can be raised when using GPS to make the measured elevation higher than the actual ground elevation, and the elevation can be lowered when measuring the 94th top elevation, which can increase the earthwork volume.

(4) Other measurement work

The more sensitive issue is land acquisition, because during the construction process, construction workers don't know where the land acquisition line is, and occasionally it will exceed the land acquisition line and occupy the land of ordinary people. If ordinary people come forward to obstruct the work, it will not only affect the progress of the project, but also make the project department pay high compensation. Therefore, it is necessary to accurately determine the location of the land requisition line and try not to occupy the land of ordinary people.

Four. Future work objectives

After a year's study, I have been initially familiar with the basic work process and responsibilities, and the future work is full of challenges for me. After a year's study, the ultimate goal is to enable us newcomers to grow up and face our jobs independently. When I go to the next construction site, I can complete the surveying and setting-out work of the whole construction site by myself and become a qualified surveyor.

In a word, this year is the fastest growing year in my work and the most learning year. I will work hard, not afraid of hardship and fatigue. While doing a good job, we should also learn from other aspects as much as possible, strive for all-round development, be versatile in the future, and adapt to different jobs, and get better every year.

The builder's work summary 5 xx project is the first place I work after graduation. During my pre-job training, I learned something about the "harmonious family culture" of our company. After coming to the project department, I really understood the meaning of "harmonious family culture": at first, because I haven't got rid of the ruthlessness when I first arrived here, sometimes old employees will take the initiative to say hello to us; My colleagues here are very enthusiastic. No one will look down on us because we are fresh graduates. More importantly, if we don't understand, they will be happy to explain to us with their rich knowledge. Here, everyone calls our project department "home", and everyone cares about his colleagues? Harmonious living environment and passionate working atmosphere, these three months are both full and happy!

Now, I will summarize my work in xxxx for one year as follows:

First, the work results and gains during the trial period

1. Mentors and apprentices promote our growth.

The company attaches great importance to the cultivation of new students. To this end, the company holds "mentoring" activities every year. At the ceremony, Master and I. . The mentoring agreement was formally signed. As the saying goes, "the master leads the door and practices in the individual." My master is a man who doesn't like to talk much, but he has strong professional ability and rich work experience. What's more commendable is that his life style is also very rigorous.

Master usually teaches me modestly at the construction site: teach me to be a man and teach me to work! With such a master leading me, what can stop me from making progress except for my own reasons? You can learn countless things from Master. Let me give you a few simple examples:

(1) shared a dormitory with Master. Master gets up at 6: 40 every morning, and as an apprentice, I always arrive earlier than him, so I don't have the habit of staying up late.

(2) On the construction site, Master told us that many things should be done by ourselves (measuring the hole depth of bored piles, measuring the specific gravity of mud, and measuring the depth during grouting? ), which can help us eliminate laziness, which can also check the quality of the project;

(3) Master has rich work experience, and with her, you can learn a lot that you can't learn at school.

(4) The master comes from an ordinary class and has solid professional knowledge, which can help me solve many problems in my work!

I am convinced that after this year's internship, new employees of xx will feel the same way. The company's "mentoring" has benefited us a lot, allowing us to adapt to the role more quickly and put ourselves into our work. In this activity, we gained not only a lifelong master, but also our life (it may be a bit exaggerated, but if you think about it carefully, you will find that this sentence is not unreasonable)!

2. Learn with an open mind, work hard and strive to complete the task successfully.

(1) I have been responsible for the pile foundation construction of XXXX bridge since xx, xx, xx, 20xx. During this period, I consciously strengthened my study, humbly asked for advice, constantly clarified my working ideas and summarized my working methods.

On the one hand, learn by doing, constantly master methods and accumulate experience, and quickly complete tasks through observation, exploration, access to information, drawings, specifications and practice.

On the other hand, consult the master, leaders, colleagues, and sometimes the constructors who have long-term experience in pile foundation operation in the construction team, and constantly enrich their knowledge and master construction skills. With the help and guidance of leaders and colleagues, I have made continuous progress, gradually found out the basic situation in my work, and grasped the key points and difficulties in my work. So far, 34 piles have been poured.

(2) The project I am responsible for is pile foundation construction. The specific construction process is: pile foundation lofting → pile casing excavation → reinforcement cage inspection → inspection drilling → hole formation → venting → reinforcement cage installation → downcomer → underwater concrete pouring. At the same time, arrange corresponding construction materials and supervise daily safe and civilized construction.

(3) When I first started working, I couldn't even eat every day because I didn't adapt to the continuous operation of pile foundation construction. Fortunately, this situation was quickly adjusted. I finally understand now that the purpose of the company's training is to strengthen our execution on the one hand, and to consider the hardships of the construction industry on the other hand, to hone our will and prepare for hardship.

(4) At work, I strive to do: love my job; Not afraid of difficulties and hardships; Ask for advice modestly; Unite colleagues, carry forward team spirit and make progress with colleagues.

3, the heart is the job, earnestly perform their duties, highlight the focus of work, the implementation of the target responsibility.

(1) Since I officially participated in the foundation construction of xxXX on XX, XX, XX, I have earnestly implemented the attendance system of the project, and I have been on time for work and off work, and I am not late or leave early.

(2) When checking the construction of each working procedure, the construction shall be carried out in strict accordance with the specifications. If it does not meet the requirements, the on-site construction personnel are required to correct it in time: clean up the welding slag of the reinforcing cage and cooperate with the security personnel to correct and rectify the chaotic power supply; Protect the foundation pit with casing and mud pit enclosure; Protection of isolation piers on both sides of the road; Measure the hole depth during hole-forming inspection. If it is less than the designed hole depth, it is required to make up the drilling. When the reinforcing cage is lowered, concrete protection blocks shall be placed in strict accordance with the design requirements; When pouring underwater concrete, stand by and do it in the whole process, and make pouring records. If you can't solve the problem yourself, report to the leader for instructions in time and strictly control the quality.

(3) Do a good job in the safe and civilized construction of the construction site, carefully supervise the workshop cleaning of the steel bar team, and classify raw materials, semi-finished products and finished products; Arrange the construction personnel to backfill the mud pit and protect the roadside in time, inspect the construction site, and require the construction personnel to rectify in time if there are any potential safety hazards.

4. Main experiences and gains

(1) After three months' work and study, I initially understood and mastered the pile foundation construction methods and procedures.

(2) Learned how to communicate with workers and how to guide construction personnel to carry out construction work.

(3) Learning various construction schemes, summarizing drawings and consulting construction specifications.

(4) Make a good construction log, prepare for the work that has not yet started, and review the completed work.

(5) unite colleagues, carry forward the spirit of teamwork, and good communication can make it easier to start work. Only by actively integrating into the collective and handling all aspects of relations can we maintain a good working condition in the new environment.

Second, the existing problems and deficiencies

(1) I haven't studied enough theoretical knowledge, and I'm not rich in professional practice and experience. I often do things by feeling in my work and deal with problems by my own ideas, and I dare not try boldly for the work I don't have.

(2) I am lazy occasionally in my work, and the construction materials are not arranged in time.

(3) Being caught off guard by sudden and accidental construction conditions, and not considering things comprehensively enough.

(4) Not doing well in strengthening the execution of construction personnel.

Third, the next step of work measures

(1) Continue to learn new knowledge, strengthen familiarity with drawings, and strive to master various construction schemes. If you don't understand, ask the master and the old staff in time.

(2) Improve one's own quality and ease working mood.

(3) Strengthen communication with various departments, so as to timely sort out construction materials.

(4) improve their execution ability and complete the tasks assigned by the leaders as soon as possible.

(5) Enhance the sense of responsibility and not be afraid of new work arrangements.

(6) Not afraid of hardship, adhere to the working principle of "do more and do better".

Sail against the current, if you don't advance, you will retreat. In the future work, I will learn to master more professional knowledge and construction methods, improve my working ability, strengthen my sense of responsibility, enhance my safety awareness, ensure the quality of the project, and continue to work hard to complete every task assigned by the leaders. "excellent manager"-let me have greater motivation in the next job. I will continue to work hard to correct and make up for my shortcomings and defects in time. Under the leadership of Master and the leaders, and with the help of my colleagues, I believe I will do better in my future work. Contribute to the future of Zheng Xin.