Current location - Education and Training Encyclopedia - Education and training - Installation requirements of automation instruments and equipment
Installation requirements of automation instruments and equipment
Installation position

Installation requirements of automatic instruments and equipment: After the instruments directly installed on pipelines are installed, pressure tests shall be carried out with the equipment or pipeline system.

installation time

It should be installed before the pressure test after pipeline purging. When it must be installed with the pipeline at the same time, the instrument should be removed before the pipeline purging.