1, site construction personnel must fill in the safety training papers carefully and master all the examination contents. Without education, they are not allowed to work, and all construction workers are allowed to wear work clothes when they enter the site. It is forbidden to wear shorts, short sleeves, slippers, high heels, hard shoes and shirtless to enter the construction site. It is forbidden to sit, lie down, laugh or play on the hanging basket. 2, enter the construction site must wear safety helmet, fasten the hat belt, aerial work above 2 meters must fasten your seat belt, fasten the safety hook, seat belt should be hung high and used low. 3, high homework shall not throw down materials and tools sundry, etc. , the construction area should be supervised by special personnel. 4. The construction personnel entering the site shall not smoke, urinate or go to work after drinking, and the tic-tac-toe frame, hanging basket and hopper shall not be manned. 5, welders and other special types of work must hold relevant certificates and wear corresponding protective equipment before operation. Such as insulating shoes, insulating gloves, protective masks and goggles. Firefighting buckets should be set up when welders are working, and full-time firemen should be set up when three or more welders are working at the same time, and they should wear fire-fighting equipment. 6. Any construction personnel at the site shall not connect electricity privately, and the use of construction machinery by the general contractor or other construction units must be approved by relevant personnel. 7, without the consent of the relevant personnel, shall not be arbitrarily dismantled safety facilities and safety devices, all kinds of electrical equipment must have a leakage protection device and reliable safety grounding device before use. 8. Electric welders must check whether there are inflammable and explosive articles around the operation area during operation. If there is any hidden danger, it should be handled or reported in advance, and the construction operation can be carried out only after handling it. 9, temporary erection of scaffolding before construction must be checked by full-time security officer rear can use. 10. The welder must hang up the fire bucket when working on the facade wall or aerial work. In case of strong wind or rainy weather above level 6 (including level 6), construction is not allowed. 1 1. The welding machine shall be wired in the designated lock box to ensure "one machine, one brake and one leakage box". Before going to work every day, check whether the welding wire is damaged, whether the front and rear shields and welding guns are in good condition, whether the primary wire is less than 3 meters, and whether the welding handle wire is in place. 12, before welding starts, the quantity, working face and fire protection certificate must be submitted. 13, the distribution system adopts zero connection or grounding protection system according to the specification, and the motor is reliably grounded or grounded. 14, electric and coal stoves are strictly prohibited in the living quarters, and high-voltage electricity is strictly prohibited in the dormitory. 15, the electrician on duty has complete personal protective equipment, without pulling, pulling, pressing or smashing; 16. The materials stored in the warehouse should be placed neatly in classification code and isolated from the processing area. The processing machines and tools should meet the requirements of the specifications, and fire-fighting measures should be taken. The fire extinguisher should be set in a convenient and conspicuous place for standby; 17. The remaining materials and wastes on the construction site should be treated in time to prevent fire. 18, oxygen and acetylene should be classified and packaged centrally. The distance between the two bottles should not be less than 5 meters, and the distance from the open flame should not be less than 10 meters. If the requirements cannot be met, isolation measures should be taken. Acetylene bottles should not be laid flat, and the storage temperature should not exceed 40℃. 19. The construction team regularly holds meetings on workers' safety, fire control and civilized construction, and unswervingly implements the policy of "safety first, prevention first" to ensure that no safety and fire accidents occur on site. 20. The construction team insists on safety and fire control disclosure before shift. 2 1, strengthen the establishment of fire safety guarantee system and management system, ensure the cooperation of construction team personnel, obey the management of the project department, and give full play to the role of organization, coordination, management, supervision, inspection and guidance. 22, the construction team comes into play for this disclosure, construction team personnel should seriously study, carry out, execute, in the process of construction, if there is any disobedience to management or violators will be secondary education or clean up the construction site.
For more information about project/service/procurement bidding, and to improve the winning rate, please click on the bottom of official website Customer Service for free consultation:/#/? source=bdzd