Time flies, and it's the end of the year, and I'm about to start my work for the next year. Must be a lot of feelings. Have you finished writing the year-end summary? The following is the model essay 202 1, which I compiled for your reference only. Welcome to read this article.

Part I: Summary of Technical Annual Work Model 202 1 Selected 202 1 is about to pass and the new year is about to begin. Looking back on one's work experience and lessons in the past year is conducive to fostering strengths and avoiding weaknesses in future work and doing technical work better. Here, I report to the leaders on my work in the past year:

In the past year, due to the support of the company and the project department, I worked as a technician in the powertrain project department. In the past year's construction, with the care and help of many enthusiastic people in the project department, my work has made great progress, both in technology and quality inspection and management. Of course, my achievements only represent the past, and I will redouble my efforts to do better in the future.

"Scientific things must not have hypocrisy and pride". In engineering, the technical content is high, which requires our technicians to treat their work with a down-to-earth and rigorous attitude, rather than overstaffing. We should be good at learning what we don't know and constantly improve what we know, because technology is constantly improved and updated. Only through continuous learning, supplemented by pragmatic and down-to-earth style, can we be competent for our job. All engineering construction, technology and quality inspection work runs through. In the accumulation of work experience, you can gradually cultivate your foresight, so as to play the role of technology first. Different from other industries, the construction industry needs constant on-site inspection and supervision to find and solve problems at any time, which requires us to constantly cultivate the spirit of being hard-working and not afraid of hardship and fatigue, let go of the lofty attitude of managers and enrich ourselves from the actual work of the project.

As a member of our company, I feel extremely proud to have the opportunity to study and exercise under such conditions. This environment and external conditions give us a sense of self-confidence and glory, but it is more of a spur to our future work, requiring us to always restrain ourselves with the image of the company in our work. All our words and deeds must conform to the company's consistent standards, and gradually cultivate our own personal qualities and self-cultivation, so as to be worthy of the trust and training of leaders. By summing up the work in the past year, we can find out the shortcomings in our work so as to overcome them in our future work. At the same time, we need to read more books, study norms and related documents, master professional knowledge, improve our working ability, strengthen our sense of responsibility, and do our personal work in time.

In short, in the future work, I will constantly sum up and reflect, constantly spur myself, enrich my energy, improve my quality and professional level, so as to adapt to the development of the times and enterprises and make progress and growth together with the company.

Part II: Technical Annual Work Summary Model essay 202 1 Selected Year 202 1 is a fruitful year. For me personally, 202 1 is a year of comprehensive improvement of my professional skills. In the past year, as a technical cadre with engineering construction experience in xx Engineering Office, I participated in the technical work of several steam turbine professional construction teams in part or in whole. It is in this busy and fulfilling year that I have tested my original engineering knowledge and further deepened it under the unique conditions of xx, and on the other hand, I have initially built my own professional knowledge system.

I. Overview of work

The technical work of 202 1 a whole year that I am personally responsible for can be roughly divided into several time periods according to the key points of phased construction.

At the beginning of the Spring Festival in 20021year, I was the only technical cadre in the whole steam turbine team because two major projects of xx Company were in the critical period of construction. As the only technical cadre of steam turbine team, I am responsible for the technical work of all teams in steam turbine specialty. At the same time, it is also a time-pressing, huge and extremely important work to make plans for multiple sets of construction drawings of all xx large systems in steam turbine specialty.

During the period when other technical cadres joined in X month, my work focus changed, mainly responsible for the daily construction technical work of Class 1 and Class 2 and the unfinished phased construction tasks in the early stage. During this period, I was mainly responsible for the installation of steel platforms in 1 and 2# steam turbine rooms, the hoisting and hauling of X sets of high-pressure heaters, the installation of traveling rail beam and traveling crane in the circulating water pump room, the installation of circulating water pipes in the factory area and the installation of high-pressure water supply pipes in the first-class pipeline that participated in the water pressure test of 1# boiler.

Since 10, my technical tasks have been gradually stripped off, and all the tasks of pipeline class two have been delivered to the newly transferred technical cadres in the field at the beginning of 10, and the tasks have been reduced. In X this year, I began to take over the installation technical tasks of two steam-driven feed pumps, and my professional skills entered a new stage to cope with the new tasks. So far, my work focuses on the installation of two steam-driven feed pumps, the installation of temporary steam pipeline purging and the improvement of all steam-water pipeline systems responsible for the first-class pipeline construction.

Second, the work summary

In the work of 202 1, I have never been intimidated by a series of heavy construction tasks and a strange technical work. I have always despised the engineering and technical work I am engaged in. After all, these works have mature construction experience to learn from, and there are many engineers and technicians like me who are engaged in this work together. But I take a cautious attitude in working methods and strategies, because I can accumulate and learn valuable experience from the working practice and details of these systems.

I regard every job given to me by the team leader as a valuable opportunity to accumulate personal work experience. Successfully completing the task is my only work goal, and trying to solve the construction problems is my only work attitude. I participated in every construction task that I was responsible for, and fully grasped the key points of the unit project and sub-project construction. Taking the installation of steel platform and circulating water pipe in the steam turbine room as an example, these two construction tasks were the earliest unit projects carried out by the steam turbine team. During the construction of these two projects, I often rush between the main workshop and the circulating water pipe trench to check the implementation of key points of the project and discuss with the construction team leader to solve the construction difficulties. It is because I really put myself into the project construction process that I have mastered a series of construction points, such as span and verticality of steel platform columns, installation elevation control of steel column joints, connection quality control, installation quality control of circulating water pipes and so on.

To say hardship and fatigue, every worker on the construction site must have a deep understanding, and as a team technician, I have a special taste in it. At the busiest time of engineering construction, I have to run nearly xx construction teams every day, and I have to run back and forth from the xx meter floor of the boiler to the circulating water pump room several times every day for only one reason-I am an engineering technician. Because of the need of work, in the hot weather of more than 40 degrees in summer, I also discussed with the construction team leader to solve the construction difficulties of circulating water pipes and check the construction quality. Since I entered the construction site this year, I have only taken five days off for more than 300 days. The rest of the time, like the workers in the steam turbine team, I worked overtime every day for the smooth operation of the company's first 600 mw unit, and I was busy happily, rain or shine, and it was difficult to cope with the cold and summer.

As an employee of a modern large-scale enterprise, as an engineer and technician in a new era, I not only work hard, but also constantly sum up my progress. The conventional construction technology has long been firmly in my mind, and the new problems and difficulties encountered in the construction process are the focus of my summary. When the project is busiest, it is impossible to solve everything on the same day every day, so I will classify these things and deal with them in a planned way. Because my only project construction experience before Luzhou project was xxmw project, I had insufficient work experience and encountered many problems. I corrected all my shortcomings and mistakes in time, but I adopted the method of dealing with the fait accompli, analyzed the reasons from my shortcomings and mistakes, summed up the experience and lessons, and made them my wealth.

In addition to technical work, I also hold positions in the general branch and installation branch of the engineering project department, and I am also the person in charge of Qing 'an post of the steam turbine team. Participating in youth activities is always my safety. I participate in every activity of the Youth League Committee with my heart and perform my duties well in the activities of the Youth League Committee. In the youth activities, my only regret is that due to my busy work, I didn't carry out the activities of young workers in the steam turbine team as planned, and I didn't successfully complete the propaganda task on the steam turbine site in xx years. This is the failure of my project.

Three. abstract

I have always admired such a philosophical saying that a gentleman strives for self-improvement, and I have always demanded myself by the standards of an excellent engineer and technician, and I have also made progress because of this requirement. The glory of the company needs our efforts to create, and personal development needs our own efforts to achieve. For these lofty goals, I have been making unremitting efforts and striving hard. In the future work, I will continue to guard against arrogance and rashness, work hard, closely unite with everyone in the company's big family, realize the company's take-off with my brilliant youth, and write my own chapter with no regrets.

Chapter III: Summary of Science and Technology Annual Work Model 20021was selected to reform and innovate and build a grass-roots agricultural technology extension system, improve the transformation rate of agricultural scientific and technological achievements, and enhance farmers' ability to absorb applied science and technology. Over the years, we have taken effective work measures in strict accordance with the first-class guiding ideology of "work standards, work system, work effect and work experience", according to the unified deployment of superior business departments and the specific arrangements of our unit. The work summary is as follows:

First, the basic situation of work

Innovate the efficient agricultural technology extension and training mode, and explore the new mechanism of efficient agricultural extension. Relying on farmers' practical knowledge and technical training programs, the training of science and technology demonstration households is carried out by combining traditional methods with modern means. At the same time, I directly face the demonstration households and give practical technical guidance according to the actual situation to enhance the practicality and operability of the demonstration households.

Establishing core experimental fields, demonstration fields, demonstration households and demonstration bases, so that new technologies and new varieties can be displayed, and the leading role can be played by point and point, so that farmers can see the fundamental transformation of production methods brought about by science and technology. This is the fundamental way for farmers to embark on the road to wealth.

Provide all-round technical services to improve the scientific and technological capabilities of demonstration households. I communicated with the demonstration households, and the demonstration households encountered technical and life problems, and went deep into the fields many times to provide technical guidance and technical services hand in hand and face to face, which was well received by the demonstration households.

Second, the effectiveness of the work.

Through the direct delivery of science and technology to households, I have increased the time and opportunity to go directly to the fields and enter the production line, so that I can understand the present situation of efficient agricultural production and the needs of farmers in a simple way, so as to carry out my work better. At the same time, through the investigation and study of "agriculture, countryside and farmers" work, we can find problems and study countermeasures, so as to be good staff for leaders' decision-making.

The introduction of science and technology into households has narrowed the distance between our agricultural technicians and farmers, and the promotion of gay agricultural technology has made farmers more acceptable and willing to accept it. Through publicity, training, on-the-spot guidance, scientific and technological consultation and other scientific and technological channels, it not only established the production and management concept of green agricultural products for farmers, but also solved the practical problems and difficulties encountered by farmers in production.

The introduction of science and technology into households has promoted the development of agricultural science and technology work. At the same time, I also brought the experiment and demonstration of new agricultural technology directly to farmers, combined the experiment and application, and let farmers directly participate in the experiment of new agricultural technology, listen to their opinions and adopt their suggestions, so as to make the new agricultural technology more practical.

In my future work, I will continue to give effective scientific and technological guidance, and at the same time do a good job of summing up and obtain valuable first-hand information. Through efforts, farmers can effectively improve the utilization rate of scientific and technological knowledge and make their own contributions to increasing farmers' production and income.

The fourth chapter: summary of technical annual work model essay 202 1 selection time has passed, such as the blink of an eye, it has been more than a year since I came to xx. During this period, I worked and studied in two projects, and now I work in the liquid hydrogen project in xx. During my time in the project department, I learned a lot and gained a lot. Although I am busy every day, I feel very fulfilled. At present, there is still a lack of work experience and there are still many places to learn. I must study hard.

As a technician, first of all, I can be strict with myself and constantly improve my ideological consciousness. At the same time, I have always been strict with myself, taking my work seriously and positioning myself well. Strive to set high standards for yourself. Actively study all kinds of regulatory documents and requirements related to quality inspection, and often consult predecessors and colleagues in the same industry. In my work, I always keep in mind that I should keep learning in my work and combine theory with practical work well. Constantly change yourself at work, put forward different requirements for yourself at the right time, constantly sum up experience at work, improve your work skills, and constantly improve your professional and technical level.

In the past year's work experience, I have gained something while sweating like rain. In my previous practical work, I organically combined theoretical knowledge with practical work and greatly improved my level. The following is my construction experience during this period:

1, carefully familiar with the construction drawings, understand the general situation of the project, and strive for it.

To do every job well, we must have a comprehensive understanding of this work before taking up the post, which is conducive to better work; For civil construction, we should also make preparations before construction, be familiar with drawings and understand the general situation of the project. The so-called know yourself and know yourself. If you don't know the project site and work blindly, it is equivalent to going to war with your bare hands. To carry out the work smoothly, we must be prepared and fight well.

Preparation before construction: be familiar with the construction drawings-relevant technical specifications-operating procedures-design requirements and detailed drawings, node practices-relevant technical data-engineering quality requirements, etc.

Secondly, we should be familiar with the construction organization design and construction sequence, construction methods and technical measures, and find out the weak links and key parts in the completion of construction tasks; In the end, we should have a deep understanding of the construction site and be familiar with the construction drawings, only on paper. To have a clear and comprehensive understanding of the project and grasp the general situation of the project, you must go to the site to understand it in person. A careful understanding of the basic situation of the project is conducive to better implementation of management, implementation of construction methods and better improvement of work.

2, the implementation of feasible construction methods, covering all aspects of the work of civil construction personnel, summing up the implementation of feasible construction methods is a key work of construction technology. Doing a good job in construction preparation and explaining the requirements and methods of construction tasks to the construction personnel is to create good construction conditions for completing the construction tasks. The most important thing is to formulate feasible construction methods around the quality and time limit according to the requirements of relevant construction technologies in the whole construction process, and adhere to pioneering, balanced organization and combination in every stage, every working procedure and every construction task.

Secondly, it is necessary to organize relevant personnel to strengthen the inspection of key parts, prevent the occurrence of rework, and correct all kinds of irregularities and violations of construction operation procedures and on-site construction regulations at any time.

At the same time, if there are any design changes or changes in construction conditions, supplementary disclosure shall be made at any time, and records of project increase or decrease shall be handled at the same time, and corresponding procedures shall be handled. The revised information should be indicated on the drawings to facilitate the smooth progress of the construction. We should not only do the above work well, but also strictly implement the system of quality self-inspection, mutual inspection and handover inspection.

3. Establish good interpersonal relationships

In the construction site, to ensure that a project can be completed with good quality and quantity, we must not only have the necessary technical skills, but also be able to blend in with the following construction personnel; At work, communicate with workers and respect them, win their trust, so as to carry out all construction instructions.

It is also necessary to establish a good working relationship with Party A's on-site representatives and supervisors, exchange construction technology with Party A and supervisors, listen to their feasible construction methods, and strive for Party A and supervisors' satisfaction and recognition of on-site construction conditions.

As a member of the Sinochem family, we should not only consider the enterprise, but also make our own contribution to the construction of Sinochem. So I am strict with myself, responsible and self-motivated. I hope that through my continuous study and efforts, I can learn more knowledge, constantly improve myself, realize my own value and work hard for the rise of xx. Of course, I still have many shortcomings, such as lack of work experience and lack of rigorous sense of responsibility. These are all problems that I will improve.

There, I also expect leaders to affirm my work and give me valuable advice. I must correct it modestly as soon as possible, so that I can put myself into my work as soon as possible. Finally, I wish xx more and more benefits!

Chapter V: Summary of Technical Annual Work Model 202 1 Selected Works 202 1 I have been working in the Agricultural University Project Department of xx Company so far. I have been working as a technician in the project department for the past year. Through the practical work on the project site, thanks to the care and training of the leaders of the project department, as well as the enthusiastic help and inculcation of my colleagues, my work has been rapidly improved. Thank the company for its trust in me and the support of my colleagues. Through the joint efforts of the team, I have explored some work experience. Here is a summary of my personal work for one year. Please give guidance and correction from leaders:

I. Main responsibilities

1, responsible for the preparation of reinforcement material plan and the quality and quantity acceptance of reinforcement on site.

2, responsible for steel lofting, steel work disclosure and steel engineering inspection and acceptance.

3, responsible for meteorological records, construction survey unreeling, steel engineering hidden time and concrete pouring records.

4, responsible for the final accounts of each division subdivisional work measurement.

5. Participate in the labor management of steel bars, templates, civil works, scaffolder, team and other work arranged by leaders.

Second, work experience

1, knowing how to do a good job is the premise of an excellent job, which requires us to have a solid professional foundation.

2. The success or failure of a project depends on teamwork. A project needs the close cooperation of many departments. Only by overcoming all the immediate difficulties and forming a joint force can the whole team have strong combat effectiveness and win one victory after another in the fierce market competition!

3. Be diligent at work, have a serious attitude, communicate actively, and avoid information lag.

4, technology, management, both hands must be grasped, both hands must be embarrassed!

Third, shortcomings

1, due to lack of work experience, some aspects of project management cannot be controlled in advance.

2. In terms of settlement of reinforcement engineering, Guanglianda is not skilled in using it, and needs to constantly strengthen learning.

3, unfamiliar with the preparation of construction scheme, need to constantly strengthen the study of professional knowledge.

4, impulsive.

Four. Future plans

1, and gradually master the preparation of construction scheme.

2. Strive to be admitted to the second-level constructor in 2022, and then to the first-level constructor.

3. Strengthen project management, and strengthen the ability of target control and management coordination.

Generally speaking, all the tasks assigned by the leaders have been successfully completed. I have been engaged in engineering construction for one year and have made continuous progress. My professional knowledge has been improved and deepened, and my working ability, including organizational cooperation ability, management ability and adaptability, has been greatly improved. More importantly, I have accumulated valuable work experience. The work performance in the past year has also been recognized by the leaders and colleagues of the project department. Looking forward to 2022, there will be more new challenges in my work. I will try my best to work more actively. In the future work, I will meet new challenges with a hundred times enthusiasm, make continuous progress and maturity in my study, and make contributions to the development of the company!