1 Scope These Measures stipulate the objectives, responsibility system, management organization and control of safety and environment control in the project construction of Guodian Quan Min Power Generation Co., Ltd. These Measures are applicable to the safety and environment control of Guodian Quan Min Power Generation Co., Ltd. and all relevant units in the project construction. 2 normative reference documents The clauses in the following documents become the clauses of this standard through the reference of this standard. This standard does not apply to this document and its subsequent modification (excluding errata) or revision. Regulations of the State Council Order No.373 * * of the People's Republic of China and the State Council Order No.393 * * of the People's Republic of China on Safety Production Management of Construction Projects [2004] 122 Regulations on Safety, Health and Environment Management of China Guodian Group Project Company (for Trial Implementation) [2004]. Document No.78 Management Measures for Civilized Construction of Project Company of China Guodian Corporation 3 General Provisions 3. 1 In order to adhere to the policy of "Safety First, Prevention First" and implement the Law of People's Republic of China (PRC) on Work Safety, Regulations on Work Safety of Construction Projects and Regulations on Management of Safety, Health and Environment of Project Construction of China Guodian Corporation, 3.2 The project company of Guodian Quan Min Power Generation Co., Ltd. should establish a "people-oriented, Respect, care and care for people ",care about the work and life of employees, check and eliminate unsafe and uncivilized factors, and constantly improve the labor safety and health of employees and the engineering environment conditions. 3.3 The project of Guodian Quan Min Power Generation Co., Ltd. implements the responsibility system of safety and environmental protection for all employees, that is, "safety must be controlled in construction", "whoever is in charge is responsible" and "everyone is responsible for safe and civilized construction". 3.4 Project leaders at all levels of Guodian Quan Min Power Generation Co., Ltd. should straighten out the relationship between safety, efficiency and progress, always put safety and civilized construction in the first place, and achieve "three-level control", "four in place" and "five simultaneities" in practical work; Implement the principle of "paying equal attention to rewards and punishments" and "four no-misses" in safe and civilized construction. 3.5 Manage the safety, health and environmental protection of Guodian Quan Min Power Generation Co., Ltd. scientifically. All units should strengthen safety, health and environmental technology education to improve the quality of employees; Carry out construction safety evaluation, dangerous door identification and hazard source (point) analysis; Improve the construction safety measures and civilized facilities; Relying on scientific and technological progress, adopt safe and advanced construction technology and equipment. Do a good job in accident prediction and pre-control. 3.6 These Measures are applicable to Guodian Quan Min Power Generation Co., Ltd. and relevant units such as design, supervision, construction and commissioning contractors involved in the project construction. In case of any conflict between these Measures and the spirit stipulated in the superior documents, the provisions of the superior documents shall prevail. 4. Safety and environmental protection control objective 4. 1 safety control objective 4.1project safety objective of Guodian Quan Min Power Generation Co., Ltd. (52 1 safety objective): control personal injury accidents and avoid personal death accidents; No general or above mechanical equipment damage accidents; No general or above fire accidents; No major traffic accidents with the same or more responsibilities will occur; No environmental pollution accidents and collapse (collapse) accidents; The personal injury rate is controlled below 0.5%; The accident rate of general equipment shall be controlled below 0.3%; Create the first-class safe and civilized construction site of Guodian Group Company. 4. 1.2 In order to achieve the safety objectives of the project of Guodian Quan Min Power Generation Co., Ltd., all construction contractors (subcontractors) must formulate the "three-level control" measures for safety objectives and earnestly implement them. 4.2 civilized construction goal 4.2. 1 The overall goal of civilized construction of Guodian Quan Min Power Generation Co., Ltd. is to realize the requirements of civilized construction management measures of China Guodian Group Project Company in the whole process. That is, general layout management, modular materials, fixed placement, standardized site safety facilities, standardized operator behavior, routine office and living environment sanitation, and unified operator clothing. 4.2.2 The project construction should be "standard of facilities, code of conduct, orderly construction and clean environment", strive for the first-class level of safe and civilized construction of thermal power construction in China, and create a brand project of safe and civilized construction of Guodian. 5. Responsibility system for safety and environmental control 5. 1 The general manager of each unit of the project is the first person in charge of safety and environmental management of this unit, and takes overall leadership responsibility for safety, health and environmental management of this unit. 5.2 The deputy general manager, chief engineer, chief economist, chief accountant and other leaders of each unit of the project are directly responsible for the safety, health and environment management within their respective business scope. 5.3 The heads of functional departments of all units in the project are responsible for the safety, health and environmental management within their respective business scope, and all employees are responsible for their respective work scope. 5.4 All kinds of personnel of each unit of the project shall be inspected, supervised and managed by the safety management department or safety supervision engineer during the safety and environmental work. 5.5 The supervision contractor shall supervise and control the safety and environmental work during the project construction, and the director shall be directly responsible for the supervision and control of safety and environment. 5.6 The survey and design contractor shall be responsible for the truthfulness, accuracy and rationality of the survey and design documents provided, and shall be responsible for giving guidance on measures to ensure the safety of construction personnel and prevent safe construction. 5.7 The construction contractor (subcontractor) is the main body responsible for the on-site safety and environmental protection work, and is fully responsible for the safety and environmental protection work within the scope of its contracted projects according to law. 6. Safety and Environmental Management Organization 6. 1 Safety and Civilization Construction Committee 6. 1. 1 Safety Committee is composed of leaders of Guodian Quan Min Power Generation Co., Ltd., general managers of relevant units and heads of various departments of Guodian Quan Min Power Generation Co., Ltd.; The general manager of the project company is the director, the deputy general manager and director of the project company are the deputy directors, and other personnel are members. The Safety Supervision Department is the permanent body of the Safety Committee. 6. 1.2 Responsibilities of Safety and Civilized Construction Committee 6. 1.2. 1 Carry out the guidelines, policies, laws and regulations of the state, industry and group project companies on safety work, decide on major measures for safety and environmental protection work of this project, and ensure the normal operation of the two systems of safety and civilized construction. 6. 1.2.2 Adopt and publish unified safety, health and environment management measures and other safe and civilized construction management systems that relevant units of this project must abide by. 6. 1.2.3 coordinate the working relationship involving safety and environment of relevant parties, and assess the safety and environmental work of relevant parties. 6. 1.2.4 Decide to solve the major safety and environmental problems of this project, and implement them in terms of personnel, responsibilities, funds and time. 6. 1.2.5 Organize or participate in the investigation, analysis and handling of personal death accidents and major and above accidents in this project. 6. 1.3 The safety committee shall hold the first meeting before the project starts, and then the safety committee meeting chaired by the director of the safety committee shall be held once every quarter; The safety committee shall hold a safety and environmental work analysis meeting once a month, which shall be presided over by the deputy general manager in charge of infrastructure of the project company. 6.2 Safety and civilized construction supervision and management institutions. 6.2. 1 Guodian Quan Min Power Generation Co., Ltd. established a safety supervision department with no less than 3 safety management personnel; The safety supervision engineer of the supervision contractor shall not be less than 2; Each construction contractor (subcontractor) shall set up an independent secondary safety supervision and management organization, and be equipped with sufficient and competent safety management personnel to form a tertiary safety network. Safety supervision and management institutions at all levels should be equipped with necessary publicity and education equipment and special safety supervision equipment and tools. 6.2.2 The engineering safety network of Guodian Quan Min Power Generation Co., Ltd. will hold a regular safety network meeting hosted by the safety supervision department of Guodian Quan Min Power Generation Co., Ltd. once a week. 6.3 Each construction contractor shall establish a regular meeting system for safety and environmental work, and the project manager, site and team shall find and eliminate potential safety and environmental hazards by analyzing and discussing the safety construction situation, and put an end to illegal operations. Records of regular safety and environmental work meetings shall be properly kept. 7. Safety and environmental control management 7. 1 Safety and environmental control system and account 7. 1. 1 Guodian Quan Min Power Generation Co., Ltd. establishes a basic safety and environmental control system (but not limited to this); The supervision contractor shall formulate operation control measures in combination with the safety and environmental control system of the project company; The construction contractor (subcontractor) shall formulate detailed implementation rules according to the requirements of the safety and environmental control system of the project company. 7. 1. 1. 1 safety, health and environment management measures in construction 7. 1. 1.2 responsibility system for safety, health and environment management 7.1.3 civilized construction site management. Ming construction reward and punishment measures 7. 1. 1.6 fire control management measures 7. 1.7 flood control management measures 7. 1 .8 construction machinery and special equipment management measures 7.1. .65438 management measures 7.1.13 occupational health and industrial hygiene management measures 7.1.1./4 accident investigation and statistical report management measures 7.1. 5. Management measures for safety tools and personal labor protection articles 7.65437. Supervision 7. 1.2. 1 records of safety committee meetings, monthly analysis meetings and weekly safety net (including sign-in records); 7. 1.2.2 Safety and environmental inspection records; 7. 1.2.3 Notice of rectification of potential safety hazards; 7. 1.2.4 feedback sheet for rectification of potential safety hazards (verification); 7. 1.2.5 safety reward and punishment record (including reward and punishment notice); 7. 1.2.6 safety education and training records; 7. 1.2.7 safety management personnel file registration; 7. 1.2.8 Safe sending and receiving records; 7. 1.2.9 safety facility funds are put into the registration account; 7. 1.2. 10 monthly and annual safety comprehensive reports of contractors and project companies. 7.2 Safety Technical Measures Plan 7.2. 1 When bidding, the construction contractor shall list the cost plan of safety technical measures according to the General List of Safety Technical Measures Plan Projects and the Safety, Health and Environment Management Regulations of China Guodian Project Company (Trial). 7.2.2 The construction contractor (subcontractor) shall prepare the annual or unit project safety technical measures plan according to the scope of the above safety technical measures and the actual needs of safe and civilized construction, and submit it to the supervision contractor for future reference. 7.2.3 The construction contractor (subcontractor) shall ensure the investment of funds required for the safety technical measures plan, and the project company and supervision contractor shall strengthen the assessment of actual investment and establish relevant management accounts. 7.3 Management of Safety and Environmental Control Measures The management of on-site safety and environmental measures of Guodian Quan Min Power Generation Co., Ltd. can be controlled according to several processes, such as pre-entry management, construction and installation management, division trial run, start-up and commissioning of the whole machine, and trial run management. 7.3. 1 mobilization management 7.3. 1. 1 The project company has signed the Safety and Civilized Construction Agreement and the annual Safety Responsibility Letter with the contractor. Implement the responsibility to the project manager of each construction contractor. 7.3. 1.2 The construction contractor must implement the construction organization design and safe and civilized construction plan of the contracted project, and submit it to the engineering department and safety management department of the project company for review, so as to confirm that it meets the requirements of national fire protection, industrial hygiene and other relevant laws and regulations and the overall design and planning of the project construction organization. 7.3. 1.3 The temporary construction project of the construction contractor shall be designed well before construction, approved by the project company, and can only be used after completion acceptance. The engineering department and safety supervision department of the project company shall supervise and inspect its design, construction and acceptance. 7.3. 1.4 The safety committee of Guodian Quan Min Power Generation Co., Ltd. implements the site safety, fire fighting, flood control and security management system. The safety supervision department and the comprehensive management department shall urge the construction contractor to establish corresponding management systems and emergency plans, and report them to the project company and the supervision contractor for approval and filing. 7.3. 1.5 Large construction machinery entering the site must hold the safety inspection certificate issued by the competent department, and its installation must be formulated and approved step by step. Work instructions and safety measures can only be constructed after being submitted to the supervision for review and disclosure, and can only be used after inspection and acceptance. 7.3. 1.6 All personnel (including subcontractors) entering the site of the construction contractor must pass the safety education inspection and physical health inspection of the construction contractor, and make records and accounts; All personnel of special types of work have been trained and assessed, and they have certificates; All construction personnel entering the site must wear badges. 7.3.2 Construction and installation safety and environmental control 7.3.2. 1 All construction contractors must prepare construction work instructions and identify hazards and hazards (for trial implementation) in accordance with the Regulations on Safety Supervision of Special Equipment in People's Republic of China (PRC), the Regulations on Safety in Production of Construction Projects and the Regulations on Safety, Health and Environment Management of Engineering Construction of China Guodian Engineering Company. 7.3.2.2 should also prepare special safety and environmental protection technical measures for the following important temporary facilities, important construction procedures and special operations, and conduct disclosure and construction only after being reviewed by relevant personnel and approved by the supervision contractor. Important temporary facilities: including construction electricity, water, oxygen, acetylene, compressed air and its pipelines, transportation roads, oil depots, drug depots and other dangerous goods warehouses, radioactive source warehouses, boiler rooms, etc.
For more information about project/service/procurement bidding, and to improve the winning rate, please click on the bottom of official website Customer Service for free consultation:/#/? source=bdzd