A, the construction site safety inspection points

1. Construction site fence: closed with hard materials or brick masonry (the wall height of main sections in urban areas is 2.5m, and that of general sections is 1.8m), and the wall surface shall be plastered and painted to be firm, flat, neat and beautiful. There should be a wall cap around the brick and a propaganda slogan on the wall. It is not allowed to pile materials or soil against the wall. If conditions permit, color pressed steel plates can be used.

2. Site gate: battlements and gates. There is a light box above the door with the name of the enterprise and the name of the project written on it. The guard room should have a guard system. At the gate, "construction is important, and idle people are not allowed." And "safety helmet must be worn on the construction site." Brand. There are seven pictures and three cards hanging in the door.

3. Ground of the site: hard ground with good drainage (the main roads in the hardened site are not less than 20m, and not less than 5m outside the site), and it is equipped with a washing table.

4. Personal protection: wear a safety helmet and a safety belt. Seat belts should be hung high and used low. "Three treasures" must have production license, product certificate and quality inspection certificate.

5. On-site access: A protective shed shall be erected at the entrance of the access, with the shed being wider than the crossing, and scaffolding shall be erected at the top of the shed. The shed length should be greater than 3m; Buildings with a height of more than 24m should be provided with double-layer protection, with the spacing not less than 60㎝ and the shed length exceeding 10m.

6. Elevator wellhead: a fixed grid or two-way fence with a height not less than 1.2m(60㎝ one, 120㎝ one) shall be set, and a flat net shall be set every 10m in the elevator room.

7. Edge protection: Two protective fences with heights of 60㎝ and 120㎝ shall be set for the edge facilities such as balcony, roof, floor, stairs and unloading platform, and columns shall be set with a spacing greater than 2m.

8. Scaffolding: It is forbidden to mix steel and wood in material selection, and the material meets the standard. Before the scaffold is dismantled, it is not allowed to dig the foundation on the side.

9. Reserved holes: holes larger than 25㎝ are protected by fixed cover plates, and holes larger than 50㎝ are surrounded by two horizontal railings not less than1m.. For the hole larger than 1m, except for two horizontal railings, a safety flat net must be erected below the hole.

10. Dangerous area: Dangerous signs such as "No" and "Warning" should be hung in the dangerous area of the site operation point.

1 1. Material stacking: classified and stored neatly, marked and provided with the general plan.

12. Storage of gas cylinders: The distance between oxygen cylinders and acetylene cylinders is more than 5m, and the distance between oxygen cylinders and acetylene cylinders is 10m, so that they cannot be exposed to the sun and acetylene cylinders cannot be laid flat.

13. Construction pit (trench): When the depth of digging pit (trench) exceeds 1.5m, slope must be placed or reliable support must be added; When it is more than 2m, two guardrails must be set around, the height is 1.2m, and the distance between the vertical poles is not more than 2m. The upper and lower passages shall be erected firmly and non-slip. Mud, materials and machinery are not allowed to be piled up within the pit (ditch)1m.

14. Project license: business license (original), enterprise qualification (original), safety license (original), safety qualification certificate of enterprise legal person, safety supervisor, safety management network diagram, safety production guarantee system, safety production responsibility system at all levels, safety production responsibility letter (signed step by step until workers), qualification certificate of full-time safety officer of project department, post status and team.

15. On-site fire prevention: the floors of carpentry rooms, canteens, dormitory areas and operation areas must be equipped with fire-fighting equipment, and fire-fighting signs should be hung in dangerous places.

16. Life logistics: people are not allowed to live in the project under construction, urinals are set in high-rise buildings, it is forbidden to urinate anywhere, and clothes are not allowed to hang on scaffolding and wires. On-site canteens should conform to the regulations, operators should have physical examination health certificates, raw and cooked food should be separated, and canteens should have screen windows, screen doors, gauze covers, hygiene licenses and hygiene responsibility systems.

Key points of enterprise safety data inspection

1. enterprise safety production license (original and copy);

2. Enterprise safety production management responsibility system;

3. Rules and regulations of enterprise safety production;

4. Enterprise safety production operation procedures;

5 enterprise safety production management leading group, organization and staffing;

6. Information related to the safety assessment of "three types of personnel";

7. List and management of special operations personnel;

8 enterprise safety production mortgage risk certificate;

9. Relevant materials for payment of industrial injury insurance and accidental injury insurance;

10. safety production input list and related bills;

1 1. Special construction plan approval and expert argumentation data;

12. enterprise safety production education and training files and related materials;

13. Inspection data of enterprise safety production;

14. Relevant records of emergency rescue plans and drills for production safety accidents of enterprises;

15. Enterprise production accident account and accident-related information;

16. mechanical equipment management data;

17. Relevant information on the management of subcontractors and suppliers by enterprises;

18. Relevant information on labor protection articles management and occupational disease prevention;

19. Relevant information on hazard identification, evaluation and control;

20. The implementation of documents and notices issued by the competent authorities and formulated by enterprises themselves;

2 1. Other relevant information.

Key points of on-site safety data inspection

22. A copy of the enterprise's safety production license, and a copy of the assessment certificate of the enterprise legal person, enterprise manager, production manager, safety department (division) chief, project manager and full-time project safety officer;

23 enterprise safety management rules and regulations;

24. Operating procedures for each type of work;

25. Monthly report of employee casualties, industrial accident registration form, some industrial accident related records, accident and incident statistical account, industrial accident report, industrial accident file and industrial accident handling record;

26. Relevant documents for handling accidental injuries;

27. Copies of on-site safety investment accounts and shopping documents;

28. Production safety education and training, annual employee training plan, training account and trainees training records;

29 new workers three-level safety education record card, education content record, division of labor examination paper;

30. The list of special operations personnel and a copy of the special operation certificate;

3 1. Construction organization design and special construction scheme;

32. Expert argumentation review scheme and argumentation review report

3. Safety sign plan and drainage plan;

34. List of major hazard sources on the construction site;

35. Safety inspection records;

36. Notice of hidden dangers of accidents;

37 temporary electricity organization design, safety technical disclosure and acceptance records;

38. Grounding resistance test records, leakage protector test records and electrician patrol records;

39 "three treasures" and "four ports" protection, safety helmet, safety belt, safety net certificate and test report;

40. Safety technical disclosure and acceptance records;

4 1. Foundation pit supporting scheme, safety technical disclosure, acceptance records, monitoring or observation records;

42. Scaffolding construction scheme, erection safety technical disclosure, acceptance record (graded acceptance) and demolition safety technical disclosure;

43. Template construction scheme, template safety technical disclosure, template acceptance record (hierarchical acceptance), concrete strength report and formwork removal safety technical disclosure;

44. Tower crane special construction scheme, installation safety technical disclosure, acceptance record and demolition safety technical disclosure;

45. Safety technical disclosure, acceptance records and maintenance records of construction machines and tools;

46. Lifting construction scheme, safety technical disclosure and acceptance records;

47. Material hoist construction scheme, safety technical disclosure and acceptance records;

48. External elevator installation scheme, safety technical disclosure, acceptance records, inspection records, and safety technical disclosure for demolition;

49. On-site emergency plan, emergency drill records and emergency (accident) handling records;

50. Procurement plan, distribution account, certificate of approval and test report (or record) of labor insurance supplies;

5 1. Illegal handling record (with a copy of the bill);

52. Examination and approval procedures for hot work;

53. Relevant documents and implementation materials issued by competent departments and enterprises;

54. Other safety management information (safety management agreement, subcontractor safety management agreement, documents, notices, meeting minutes, safety supervision procedures, etc.). ) is related to safety in production.