Safety Inspection Implementation Plan (I)

According to the company's safety production management measures, combined with the project department's safety production inspection system, the specific implementation plan is as follows:

First, the overall goal

Further intensify the investigation of potential safety hazards in the project department, minimize accidents, eliminate all kinds of potential accidents, strengthen safety responsibilities at all levels and employees' safety awareness, create a good safety production environment, and ensure that the project department successfully completes the annual occupational health and safety objectives.

Second, the scope of inspection

The scope of safety inspection is the mine construction site and staff living quarters.

Third, regular safety inspection.

1. The regular major inspection of the project department is led by the first person responsible for production safety, and the heads of various departments and the monitor attend. The inspection should be focused and practical, at least once a month.

2. Regular inspection of departments and teams shall be organized by part-time safety officers of departments and teams, and mutual inspection of production safety shall be conducted at least once a week.

3. The Project Department shall organize a safety inspection every quarter.

ⅰ. Spring safety inspection focuses on lightning protection, anti-static, anti-electric shock and building collapse.

Ⅱ. Summer safety inspection focuses on heatstroke prevention and information prevention.

Ⅲ. Autumn safety inspection focuses on fire prevention, safety protection equipment and anti-freezing and heat preservation.

Ⅳ. Winter safety inspection focuses on fire prevention, explosion prevention, gas protection, snow prevention and anti-skid.

4. On holidays, a pre-holiday inspection should be conducted, and relevant departments and teams should be jointly organized to participate, including four inspections before New Year's Day, Spring Festival, Labor Day and National Day, mainly to check holiday safety measures, such as holiday duty, security, fire safety and holiday production preparation.

Fourth, the daily safety inspection

1, post operators should check the safety situation within the work scope of this post at any time in accordance with the safety operation procedures before and during work.

2. The team leader should conduct a comprehensive inspection of the safety production situation within the scope of the class before the operation, and check the safety situation again after the operation of the class, and hand over the hidden dangers of safety production and the handling situation to the next class during the handover. At the time of handover, related safety issues must also be carefully handed over. After the succession, check carefully, solve the problems in time when found, report the problems that cannot be solved to the subordinate departments, and record the situation in the shift-over diary at the same time.

3. The full-time (part-time) security officer on duty of the project department shall conduct safety production inspection.

4, security technology department should often go deep into the scene, safety inspection, listen to the opinions of the masses, found unsafe problems, timely urge the relevant departments to solve.

Verb (abbreviation of verb) specific requirements

1, attach great importance to and strengthen leadership. All departments should fully understand the great significance of safety inspection, regard it as an important task of current safety production, strengthen leadership and earnestly do a good job. It is necessary to implement the responsibility system for production safety at all levels and organize inspections.

2, production safety inspection should be checked, changed and implemented. Issue the "Notice of On-site Inspection and Rectification" in time for the problems found, and determine the personnel, measures and time. And take follow-up actions to ensure implementation. For problems that cannot be solved temporarily due to conditions, temporary measures should be taken to prevent accidents, and solutions and schemes should be put forward, and plans should be made to solve them within a time limit.

Every safety inspection organized by the intransitive verb project department must be truthfully recorded in the "Safety Inspection Record".

Seven. Attached Table: Inspection and Evaluation Form for Safety Production Management

China building materials industry construction Xi' an engineering company

Safety inspection implementation plan (2)

In order to conscientiously implement the No.20 * * 232 "On Forwarding

I. Guiding ideology

Guided by Scientific Outlook on Development, adhere to the policy of "safety first, prevention first and comprehensive treatment", implement the new concepts of "people-oriented", "scientific development" and "safe development", further strengthen inspection and supervision, comprehensively carry out safety quality inspection activities, comprehensively promote standardized management and control of safety quality, and reduce the occurrence of construction safety accidents according to national laws, regulations and standards on safety production.

Second, check the target.

Through inspection, the construction safety measures are fully implemented, the safety awareness and operation skills of employees are improved, the procedural management and standardization of on-site safety protection are promoted, potential safety hazards and illegal behaviors are eliminated to the maximum extent, the safety guarantee system is further improved, various safety management rules and regulations and safety production guarantee measures are implemented, and potential accidents are thoroughly investigated. The occurrence of safety accidents will be effectively prevented and resolutely curbed to ensure the continuous stability of the construction tasks of the factory's infrastructure technical transformation projects.

Third, organize and lead.

The Ministry of Infrastructure has set up a leading group for safety inspection activities.

Inspection work leading group

Team leader: Wang Liansheng

Deputy Team Leader: Zhou Konghao

Members: An, Chen, Ren,.

Fourth, the scope and content of remediation

1, the company's factory safety management.

2. Safety management of infrastructure projects under construction.

3. Improvement of relevant rules and regulations.

Verb (abbreviation of verb) checking method

1, check the self-inspection. Each construction unit team shall conduct self-inspection first, and then be inspected by the leading group.

2, check the rectification. Adhere to the inspection and rectification, so as to promote the rectification through inspection, and immediately rectify the hidden dangers and problems found. If it cannot be rectified for a while, it is necessary to formulate a rectification plan, clarify the rectification measures, implement the responsible person, and resolutely shut down those who do not meet the safety requirements and have serious hidden dangers and problems.

3. Inspection and accountability. To find out the major safety and quality problems, () refused to rectification, according to the relevant provisions of the directly responsible person and the person in charge of the responsibility, and shall be punished.

Six, check the time

The safety inspection is divided into three stages from August 15 to September 30.

1. Prepare for the inspection stage (August1May-August 25th), study and formulate the inspection plan, implement the responsibilities and personnel, do a good job in relevant publicity and launch, carry out hidden dangers investigation, and establish a problem base.

2. In the rectification stage (August 26th-September 20th), the problem base will be rectified, and the safety and quality problems that can be solved immediately will be rectified immediately. ...

3. Main work in the acceptance stage (September 21-September 30): recheck the problems found in the safety and quality inspection activities one by one, and rectify those that are not in place and incomplete again until they meet the requirements.

Seven, inspection requirements

(a) Raising awareness and strengthening leadership

We should fully understand the importance of this safety and quality inspection, carefully organize and deploy according to our own reality, and earnestly strengthen organizational leadership.

(2) Focus on key points and pay attention to actual results.

In view of the actual situation of our company, we should make clear the key parts and areas, register and file the weak links and key issues that are prone to accidents, and focus on supervision to effectively prevent all kinds of safety accidents, especially mass casualties and major accidents.

(three) the implementation of responsibility, self-examination and self correction.

Establish a leading organization for safety inspection, define responsibilities and division of labor, formulate practical implementation plans, and organize safety and quality inspection. To find out the hidden dangers, it is necessary to formulate feasible rectification measures, clarify the responsible person, and rectify within a time limit.

(four) to strengthen the work of production safety training and education.

It is necessary to vigorously publicize the popularization and publicity activities of safety Scientific Outlook on Development and safety production laws and regulations, actively carry out safety training and education for all employees, and improve their safety awareness and self-protection ability.

Infrastructure department

Safety inspection implementation plan (III)

According to the specific requirements of Heze Urban and Rural Construction Bureau's document No.97 (20 * *), the summer safety inspection of this construction project department will be carried out immediately, and the current work implementation plan is as follows:

First, set up a safety inspection team.

Team leader: Liu Yi

Deputy Team Leaders: Lu and Gong Weizhong

Members: Li Ya, Wang, Zhang Ming.

Second, the scope of inspection

Yuecheng International Garden (Phase II) construction site.

Three. Basis and standard of inspection

Law on Work Safety, Construction Law, Regulations on Management of Work Safety in Construction Projects, Inspection Standard for Construction Safety (JGJ59-99), Technical Specification for Safe Use of Construction Machinery (JGJ33-200 1), Technical Specification for Safety of Temporary Electricity Use in Construction Sites (JGJ46-88) and other related laws.

Fourth, check the content.

On the basis of comprehensive inspection, it is important to check whether the safety responsibility system is established and improved, whether it is put in place, and the potential safety hazards in the construction site. Specifically including:

1, the implementation of national safety laws, regulations, standards and norms in engineering construction.

2, leading the implementation of the shift on duty at the construction site.

3. Focus on special actions such as "cracking down on illegal activities", "construction dust", "safe production month" and "illegally building temporary houses with colored steel plates".

4. Self-inspection and standardized management of scaffolding, hoisting machinery, construction electricity, construction machines and tools, formwork support, safety protection and foundation pit support on the construction site.

5. Prevention and control of toxic and harmful dust and the implementation of flood control and heatstroke prevention and cooling measures at the construction site.

6, the scene of the accident or emergency rescue plan is perfect, and the emergency drill is qualified;

7, major hazards census filing, risk identification, monitoring and early warning system construction and the implementation of measures;

8, three kinds of personnel and special operations personnel related certificates and construction personnel education and training, and so on and so forth;

9. Investigation and management of potential safety hazards of all projects under construction;

Verb (abbreviation for verb) Check steps, methods and time schedule.

Inspection work is divided into three steps:

(A) the construction enterprise self-inspection and rectification stage (June 9th-June 3rd)

Notify all construction teams to carefully check the safety production and civilized construction of all projects under construction in this unit, rectify immediately when problems are found, and thoroughly investigate all kinds of accidents.

(II) In the stage of law enforcement inspection (June1April-June 18), the inspection team carefully inspected the construction site according to relevant laws and regulations.

(3) Summary and processing stage (June1September-June 20th)

The inspection team shall summarize and sort out the law enforcement inspection, and seriously deal with the illegal acts of safe production and civilized construction on the construction site according to law.

Specific requirements of intransitive verbs

The construction project department and the construction team should quickly carry out self-examination and self-correction, organize safety self-examination according to the requirements and the actual situation in the region, especially strengthen the inspection of key parts and key construction links, and order the engineering projects with major accidents to be rectified and tracked within a time limit to ensure the timely elimination of potential safety hazards.