Security contract
With the increasing popularity of legal concepts, contracts are indispensable on many occasions, which is both a guarantee and a constraint for both parties. So, have you mastered the format of the contract? The following are six safety contracts I have compiled for you, for reference only. Welcome to reading.

Safety Contract 1 Party A: xinghua city Shunda Road Pavement Reconstruction Project Management Department (hereinafter referred to as Party A).

Party B: (hereinafter referred to as Party B)

In order to effectively strengthen the management of production safety, ensure the smooth construction of xinghua city Shunda Road pavement reconstruction project, and ensure the safety of life and property of both parties, Party A and Party B have reached the following agreement on relevant safety responsibilities through consultation:

1. Party B has the obligation to inform Party A of its health status before entering the site, and shall not intentionally conceal its illness. If Party B dies of illness during the construction, it has nothing to do with Party A. ..

2. After Party B enters the site, Party A is obliged to provide Party B with safety education, safety technical disclosure and post safety skills training.

Three. During the construction of the project, Party B must strictly abide by the management systems formulated by Party A, observe traffic rules, observe labor discipline and obey the division of labor and command of Party A's on-site management personnel.

Four. No matter on the construction site or on the way to and from work, Party B must abide by the laws and regulations on safety in production, the Law of the People's Republic of China on Road Traffic Safety and the Regulations of the People's Republic of China on Road Traffic Management. If a safety accident happens to Party B, causing casualties or property losses, it will be handled in accordance with relevant laws and regulations. Party B or its relatives shall not interfere with or prevent Party A's construction on this basis, and Party A has the obligation to assist Party B or its relatives in handling related matters.

5. Party B should not only ensure its own safety in the work, but also ensure the safety of others. If personal injury or property loss is caused to others due to Party B's fault or negligence, Party B shall bear all losses caused thereby.

6. This agreement is made in duplicate, one for each party, and shall come into effect as of the date of signature by both parties. Valid until the end of this project.

Party A (Seal): Date:

Party B (Seal): Date:

Article 2 of the safety contract Party A: xx Project Management Department

Party B: Electric welder

1, welders must hold relevant certificates, accept the safety management and education of the head office, project, team (or labor service team) with an open mind, and operate according to safety disclosure and safety operation procedures.

2. The switch box should be locked, and the switch should be locked when not in use or in maintenance. Please don't close it while it is being repaired.

3, switch box are not allowed to put sundry, are not allowed to use other metal wire instead of fuse.

4. When the primary line of the electric welding machine exceeds 2m, wires should be hung or other measures should be taken to prevent wear and leakage; If working on metal structures, it is necessary to ensure the integrity of wire insulation.

5. When welding, you must wear protective equipment such as masks, fasten your seat belt when welding at high altitude on scaffolding, wear asbestos gloves when welding at high altitude, wear insulating rubber shoes when working in humid environment, and prevent electric leakage in areas such as electrode holders.

6. Except the wheel joint on the welder can be disassembled by the welder, only electricians are allowed to disassemble and assemble other power cables.

7. After electrifying, the welder shall not touch the uninsulated conductive part of the welder, and find an electrician to repair the leakage.

8. Before welding containers, pipelines and oil circuits that have stored oil or natural gas, you must first understand the relevant safety operation procedures and take guaranteed safety measures according to regulations, otherwise welding is not allowed.

9, welders are not allowed to move iodine tungsten lamp and other unsafe working lights with electricity, and are not allowed to work at heights after drinking.

10, when welding, it is necessary to clean up flammable materials that may cause fire when welding slag splashes; Electrode holders and weldments should be put away to prevent fire caused by heating.

1 1, correct your own safety hazards in time, point out other people's safety hazards in time and help eliminate them, and report the hidden dangers that you can't handle to your superiors and project safety personnel in time.

12. Be responsible for the violations and accidents caused by your own fault, and be willing to accept the corresponding punishment of the company and the project. Personal punishment of welders cannot exempt or reduce the responsibility that the project should bear for production safety accident casualties according to law.

Representative of Party A (signature): Signature of Party B:

Year, month, sun, moon, sun.

Article 3 of the safety contract Party A: (hereinafter referred to as Party A) Party B: Gender: Age: (hereinafter referred to as Party B)

The terms of this contract are the basis of mutual commitment and legal effect between Party A and Party B during the execution of the contract, and this agreement is formulated in order to fulfill safety responsibilities in an orderly manner and deal with major accidents in time during the execution of the contract.

1. If Party B has an unsafe accident during the specified work period, and medical expenses are incurred due to work-related injuries, all expenses for not being hospitalized shall be borne by Party A, and the rest expenses for being hospitalized shall be borne by Party A after reimbursement of economic cooperation treatment. Casualties and expenses caused by personal illegal operation can be determined according to the seriousness of the case.

2. All unsafe accidents (including leave, change of leave, sick leave, absenteeism) and all expenses such as disability, death, hospitalization due to illness, death accident, etc. It will be solved by Party B itself, and Party A will not bear any responsibility.

3. If Party B dies due to sudden illness or work-related accident during the specified working period, it shall be handled according to the relevant national policies and regulations on normal industrial accidents.

4. If Party B is sick and unwell within the specified working hours, it shall be treated in time or hospitalized. General treatment expenses shall be borne by Party B. If hospitalization is needed but the labor-employment relationship cannot be dissolved, the company will not subsidize those who are hospitalized in hospitals at or above the county level or who have been reimbursed by rural cooperative medical care. For those who have not participated in the cooperative medical care, Party A shall subsidize them according to 20% of the official invoice fee for discharge.

5. If Party B suffers from serious illness or needs health care and can't guarantee normal work, it shall terminate the employment relationship in time and go through the resignation procedures.

6. After Party B is hospitalized due to illness, if Party A's normal work is affected by various sequelae, it shall terminate the employment relationship in time.

7. Party B or the responsible party shall be responsible for all kinds of accidents caused by fighting in violation of the employment system during the specified working period.

8. During the working period, Party B goes out or leaves his post privately, handles private affairs, visits his post, illegally operates other people's machines, machinery and vehicles, touches the power supply privately and installs electrical appliances privately, and all the accidents and expenses arising therefrom shall be borne by Party B. ..

9. Party B shall not appoint others to replace its work. In case of similar situations, Party A shall not be responsible for the accidents of the employees.

10. Upon the expiration of the contract, Party B shall promptly clean up all kinds of articles and materials of Party A or the employing unit, and carefully handle the relevant procedures for the termination of the labor contract, otherwise, Party B shall bear corresponding legal responsibilities.

1 1. If any party refuses to accept the contradictions and disputes arising from the performance of the contract, it can be mediated or ruled by the people's court.

12. During the contract period, Party B shall not establish employment relationship with other units, otherwise Party A has the right to terminate the contract, and all responsibilities and expenses arising therefrom shall be borne by Party B. ..

13. If Party B is investigated for criminal responsibility according to law, the labor contract relationship between Party A and Party B shall be dissolved by itself, and all responsibilities and expenses arising therefrom shall be borne by Party B. ..

14. Party A shall take out accident insurance for Party B. If Party B has an accident during work, the insurance company will handle it according to the relevant provisions of the insurance claim contract.

15. During Party B's temporary employment or villagers' labor export, all unsafe accidents caused by violation of labor laws and regulations shall be borne by Party B. ..

16. If Party B fails to go to work on time due to vacation, vacation expiration or going out, and fails to apply for resignation, it shall be treated as voluntary resignation. Therefore, all accidents occurred outside shall be borne by itself, and Party A shall not bear any responsibility.

17. This agreement is made in duplicate, with each party holding one copy, with the same legal effect.

18. This agreement shall come into force after both parties fill in the text, and shall automatically become invalid when the contract is terminated.

19. Matters not covered in this agreement shall be settled by both parties through consultation.

Signature of Party A: Signature of Party B:

date month year

Article 4 of the safety contract Party A: Jilin Zhong Yi Industrial Co., Ltd.

Party B: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

Article 1 On-site tower climbers must wear safety helmets, including their entourage.

Article 2 When assembling a tower, a warning line or warning cone shall be set at the tower assembly site.

Article 3 Before the tower is assembled, the anchor bolts of the flange plate shall be cleaned and adjusted horizontally.

Article 4. After the first tower is assembled, tighten the double nuts and fasten them firmly.

Article 5 The tower-climbing personnel must hold the Permit for Working at Height, and the tower-climbing personnel should wear safety belts and safety ropes.

Article 6. When hoisting the tower, no one shall stand under the hanging object to prevent falling objects.

Article 7 When assembling towers, staff members shall not make noise with each other and keep the working environment relatively quiet, so as to avoid unnecessary troubles when assembling towers in busy communities or downtown areas.

Article 8 After the tower is erected, the site must be cleaned up. Don't litter everywhere. Wrap the garbage together and find a suitable place to dispose of it.

Article 9 After the tower is assembled, the tower body shall be vertically adjusted. If there is not enough time that day, the tower must be vertically adjusted the next day.

Article 10 Before hoisting the tower, the tower shall be cleaned and the damaged parts shall be treated accordingly before hoisting.

Article 11 If the above requirements are not met, the contractor shall be responsible for all the consequences.

Article 12 The tower erection personnel must carry out the construction in strict accordance with the tower erection procedures, and the personal injury of the tower erection personnel who are not in the working group of tower erection procedures shall be borne by the tower erection personnel themselves.

Thirteenth tower crane personnel should strictly abide by the safety agreement. If the tower staff fails to comply with the safety agreement, the personal injury caused shall be borne by the tower staff.

Article 14 The Guarantee Agreement shall be signed and approved by both parties, and shall be strictly implemented in accordance with this Guarantee Agreement. This guarantee agreement is made in duplicate, one for each party, and shall come into effect after being signed by both parties.

Party A: Jilin Zhong Yi Industrial Co., Ltd.

Party B: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

date month year

Article 5 of the Safety Contract: Party A: _ _ _ _ _ _ _ Telephone number: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ Telephone number: _

Party B: _ _ _ _ _ _ _ _ _ _ _

Article 1: Party A voluntarily participates in Party B's group visits and tours, and promises to abide by the provisions of this agreement.

Article 2: Party A has a sudden heart attack and is not allowed to take part in this tour. Party B shall not bear any responsibility for sudden illness caused by personal factors such as personal safety, economy and illness that may occur during Party A's travel, and Party A shall bear it by itself.

Article 3: Party A shall not leave the team without authorization, which will bring unnecessary troubles to the collective or the team, otherwise the consequences will be at its own risk.

Article 4: Party B shall not bear any responsibility for personal injury and property damage to itself or others caused by accidents and liability accidents that occur during Party A's visit and tourism.

Article 5: Party A shall earnestly pay attention to personal property and personal safety, and shall not illegally occupy other people's property. If the property losses are caused by improper storage due to Party A's own reasons, Party A shall be responsible, and Party B shall not bear any responsibility. During the tour, Party A shall take good care of his children and obey the unified arrangement and guidance of the tour guide. Don't act without authorization.

Article 6: If Party A causes damage to others, Party A shall bear all the liability for compensation.

Article 7: Party A shall strictly abide by the traffic rules. In case of a traffic accident, the party causing the accident shall be responsible, and Party B shall not bear any responsibility.

Article 8: Party A has full capacity for civil conduct and participates voluntarily. Willing to bear all possible damage independently. I am responsible for any accidents and responsibilities arising from the trip.

Article 9: This tour is organized by _ _ _ _ _ _ _ _ _

Article 10: This Agreement is made in duplicate, with the principals of Party A and Party B holding one copy respectively. ..

This agreement shall come into effect after being signed by both parties, and shall be automatically terminated after Party B confirms Party A's return to school.

Signature of Party A: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _.

Signature of Party B: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _.

Model Safety Contract Agreement 3 Party A: _ _ _ _ _ _

Party B: _ _ _ _ _ _

In order to implement the policy of "safety first, prevention first, comprehensive treatment", ensure the life safety and health of construction workers, protect the property of state-owned enterprises from losses, strengthen the work of safety in production at the construction site and prevent the occurrence of various safety accidents, Party A and Party B have formulated the following safety responsibilities through consultation according to relevant national laws and administrative regulations:

1. Party B shall establish a safety management system corresponding to Party A three days before admission, and Party B's project manager shall organize the implementation of Beijing Construction Enterprise Safety Production Responsibility System. According to the construction scale and the number of employees, set up a safety production management organization, equipped with full-time, part-time and group safety officers to organize and supervise the safety production work.

2. Party B shall strictly implement the Construction Law of People's Republic of China (PRC) and the Regulations on Safety in Production of Construction Projects, implement the national and industrial laws, regulations and provisions on safety in production, labor protection and fire control, and abide by various management systems of the enterprise. During the construction process, Party B shall strictly abide by the Beijing Construction Safety Operation Regulations and incorporate safety production into the whole construction process.

3. Party B is fully responsible for the safety protection, temporary electricity safety management, mechanical safety management and mechanical safety management of the construction site.

4. Before Party B starts the construction, Party B must give safety education to the construction personnel. Party B's construction personnel must wear badges when entering the site, special operators must also wear badges, and special operators must also carry special operation certificates. Party A's personnel have the right to check at any time.

5. Party B shall set up obvious signs in the construction area and close the centralized construction projects for a long time. Construction personnel shall be active in the construction area, and shall not enter the non-construction area at will, and Party A's personnel shall have the right to check at any time.

6. The safety protection equipment of Party B's construction team must be in place and the safety measures are effective, otherwise the operation shall not be started.

7. If Party B needs water and electricity, etc. During the construction period, Party B must fill in the application form. With the consent of Party A, the professionals will designate the water and electricity connection points, and the electrical lines and pipelines will be connected according to the specifications. Only after installing qualified measuring instruments can they be used. The expenses required shall be borne by Party B. When Party B uses temporary electricity on the construction site, both parties must sign the Management Agreement on Temporary Electricity Use on the Construction Site.

8. If hot work is required during construction, it must be approved by Party B's safety management personnel and confirmed that the conditions for hot work are met. Only after safety measures are implemented can hot work be started. Party A's personnel have the right to check at any time.

9. Party B shall report the construction site application form and the number of workers to Party A in advance when carrying out construction at the construction site. When Party B's materials appear, it shall report to ministry of materials and equipment in advance and issue a receipt. When Party B's construction vehicles enter the site, the speed shall not be greater than 5Km/h, and they must be inspected by the personnel on duty at the gate.

10. During the construction process, Party A has the right to check and stop the illegal operation, punish the behavior violating the safety regulations of the station or order Party B's construction team to stop work for rectification at any time.

1 1. The garbage generated by Party B during the construction shall be cleaned up as much as possible. After the completion of the project, Party B shall thoroughly clean up the construction site, so as to clear the site after the completion of the work. The cleaned garbage shall not be piled up in the site managed by Party A at will, otherwise a fine may be imposed according to the actual situation, and Party B shall be responsible for pollution, traffic and other accidents.

12. If Party B's safety production, civilized construction and environmental protection (including earthwork and muck transportation) are not up to standard due to the construction of this site, the developer, supervisor and government law enforcement departments will punish all losses of Party B, and Party A has the right to double the punishment on the original basis.

13. Party A has the right to punish Party B's unit that violates this agreement according to the Management Manual of Project Subcontracting, Regulations on Safe Production of Construction Projects, relevant documents of Beijing Municipality and Regulations on Engineering Punishment (attached).

Party B shall be responsible for pollution, traffic and other accidents. 12. If Party B's safety production, civilized construction and environmental protection (including earthwork and muck transportation) are not up to standard due to the construction of this site, the developer, supervisor and government law enforcement departments will punish all losses of Party B, and Party A has the right to double the punishment on the original basis. 13. Party A has the right to punish Party B's unit that violates this agreement according to the Management Manual of Project Subcontracting, Regulations on Safe Production of Construction Projects, relevant documents of Beijing Municipality and Regulations on Engineering Punishment (attached). 14. This agreement will run through the whole construction process, and the contents not included shall be implemented according to the relevant national and Beijing standards, and the latest Beijing laws and regulations shall be implemented according to the new laws and regulations.

supplementary agreement

Party A (signature): _ _ _ _ _ _ _ _ _ _ _ _ _

Party B (signature): _ _ _ _ _ _ _ _ _ _ _ _ _

Article 6 of the safety contract Name of Party A's unit: Dingbian Oil Production Plant in Yanchang Oilfield

Name of Party B's unit:

I. Purpose 。

In order to further clarify the safety responsibilities assumed by both parties in the construction process, protect the safety and health of construction personnel, prevent the occurrence of employee casualties and ensure the safe production order of Party A, the Oil Well Construction Safety Agreement was signed according to the People's Republic of China (PRC) Safety Production Law, the Labor Law and relevant laws and regulations.

Construction time: MM DD YY to MM DD YY.

Three. Project name and location:

Four. Content of the agreement

1. Rights of Party A

(1) has the right to require Party B to establish a safety organization, strictly implement safety production regulations and standards, abide by safety production regulations of oil production plants, formulate emergency plans and set up safety signs.

(2) Have the right to require Party B to perform safety production duties and supervise Party B to perform safety production duties.

(3) If Party B is found to be operating illegally, Party B has the right to give a warning, stop work, rectify and impose a fine.

(4) Have the right to require Party B to maintain relevant safety production facilities, equipment and equipment.

5] Have the right to manage the safety of Party B's equipment and facilities.

[6] Have the right to supervise, inspect and handle the safe operation of Party B's construction site.

Once after the accident, according to the relevant provisions to participate in the accident investigation, and accident statistics report.

2. Party B's safety responsibility

(1) Party B shall have the conditions for safe production stipulated in the Law on Safe Production, relevant laws, administrative regulations and national standards. Improve the safety organization, establish the responsibility system for production safety, formulate the work instructions for health, safety and environment of construction projects, equip necessary labor protection articles as required, and implement Party A's relevant safety system. ..

(2) Organize safety inspection according to regulations, and take effective measures to deal with and report to Party A if unsafe hidden dangers and major hidden dangers are found during operation.

(3) Formulate emergency plans for safety accidents. If an accident occurs, it should be started in time and implemented according to the rescue procedure. When an accident occurs, it should be actively rescued, obey the unified command, avoid further expansion of the accident, and report the accident as required by Party A. ..

(4) Maintain relevant safety production facilities, equipment and equipment.

5] Conduct safety education and training for operators, and have corresponding safety awareness and skills; Special operations personnel should have corresponding qualification certificates.

[6] Protect the environment, trees and lawns, and restore vegetation. Garbage, feces and sewage shall be centralized and closed, and shall not be piled up and discharged at will to prevent leakage of sewage and crude oil. The oil pollution generated in the operation should be recovered in time.

(7) Construction personnel must wear labor protection clothing uniformly when working, and special operators must carry special operation certificates. The construction area should be clearly marked, and the warning belt used in the construction site should be closed. Party B's construction personnel shall not enter the non-construction area at will.

⑻ Party A must abide by all relevant management systems and special requirements for safe production and construction.

(9) When an accident occurs, both parties have the obligation to rescue and provide disaster relief, and the expenses incurred shall be borne by Party B. ..

⑽ Accident responsibility should be determined through accident investigation; The accident report and investigation shall be conducted in accordance with the relevant provisions of the state.

⑾ All personal injuries and economic losses (not caused by Party A) incurred by Party B in the contracted construction shall be borne by Party B, and the responsibilities of relevant personnel shall be investigated according to regulations and reported to Party A; Party B shall be responsible for the accidents caused by Party B's engineering quality.

⑿ The industrial injury insurance of Party B's construction personnel shall be borne by itself.

[13] During the construction of Party B, all losses caused to Party A due to accidents not attributable to Party A shall be borne by Party B.. ..

[14] During the construction, Party B shall solve the environmental pollution, personal injury and other accidents caused by conflicts with local villagers; The losses caused to Party A therefrom shall be borne by Party B. ..

⒂ Party B must strengthen the HSE management at the production site, strictly implement the relevant HSE management regulations and requirements of the unit and Party A, and accept the inspection of relevant departments of the local government; Due to poor management at the production site, it will be fined by the local government, and all losses will be borne by Party B; The losses caused to Party A shall be borne by Party B; Party A has the right to deduct money to punish the hidden dangers caused by this when the project price is settled.

[14] All consequences caused by Party B's violation of the security agreement shall be borne by Party B. ..

⒄ If Party B has a safety and environmental accident in the construction process, Party A will deduct part or even all of the safety mortgage according to the nature of the accident and the proportion of responsibility, and finally the refund documents from the safety and environmental quality supervision department will be the main ones.

Verb (abbreviation of verb) liability for breach of contract

This agreement shall come into force after being signed and sealed by both parties, and shall have the same legal effect, and both parties shall earnestly implement it. If a safety accident is caused by Party A or Party B's breach of contract, the responsibility will be investigated according to law. This agreement is made in duplicate, one for each party, and shall come into effect as of the date of signing.

Party A (official seal) and Party B (official seal)

Person in charge of Party A: Person in charge of Party B:

Tel: Tel:

Year, month, sun, moon, sun.