Summary of individual annual work in water conservancy (1) Over the past year, under the correct leadership of the superior, under the specific guidance of the Water Conservancy Bureau, with the strong assistance of the village leaders and the active efforts of all the staff in the institute, we have conscientiously studied and implemented the relevant water conservancy laws and regulations, actively completed the tasks assigned by the Water Conservancy Bureau, promoted the development of water conservancy in our town through the capital construction of farmland water conservancy, and successfully completed the tasks assigned by the higher authorities. The following is my annual work summary:
First, strengthen business study and formulate rules and regulations.
Organize the staff in the institute to learn relevant water laws and regulations, actively participate in computer training courses, administrative law enforcement examinations and financial personnel training courses, and improve their business knowledge and work functions. At the beginning of the year, a series of rules and regulations such as various work plans, work responsibilities, flood control duty system and financial management system were formulated, and the division of labor was clear, which laid a good theoretical foundation for the smooth development of the work.
Second, do a good job in the capital construction of farmland water conservancy.
1, irrigation
This year, two places were built in xx irrigation area, one of which was xxx meters of the labor village canal washed away during irrigation. At that time, it was the time for farmers to transplant rice seedlings, which affected farmland irrigation. So I went to the countryside many times to understand the situation and solved xxx woven bags and xxx meters of plastic sheets. The other is the barrage in xx village. For some reason, it washed away more than xx meters, resulting in water shortage in xx paddy fields. In order to solve the problem of farmland water use, we have negotiated with the higher authorities many times without weekends. It took xx days to pull stones, weave cages, repair the washed dams and canals, and ensure the irrigation water in xx village. In addition, the repair of a farmer's bridge in xx village and the timely settlement of cement, steel bars and other materials will not affect the normal water use in paddy fields.
2. Drinking water project
In order to solve the drinking water problem of the villagers, the following work has been mainly solved. First of all, assist xx village to repair the reservoir, solve the problem of water seepage, and let the villagers drink tap water in time. Secondly, the renovation project of tap water in Minzhu Village includes drilling a deep well, maintaining reservoirs and pipelines, among which the reservoir project has not been constructed. Thirdly, Xiaoying village drilled two deep wells, repaired pipelines, and vigorously mobilized the village's financial and material resources to solve the farmers' drinking water project. And report the drinking water projects in other villages to the superior, and make the project design and budget estimate in advance.
Third, do a good job in flood control.
Flood control work is an important event to protect the national economy and the safety of people's lives and property, and it is also the focus of the whole town's work. As a water conservancy department, report the characteristics of flood control work this year to the competent leaders before the flood season comes, and formulate a flood control responsibility system to achieve early departure, early preparation and early prevention.
1, strengthen organizational leadership. Villages are required to establish and improve leading groups for flood control work, clarify leadership responsibilities, divide responsibilities and perform their duties, so that this year's flood control work is organized and guaranteed.
2 flood control post responsibility system has been implemented. The members of the leading group for flood control in the town have their own responsibilities, such as small reservoirs, ponds, river banks, etc., and sign letters of responsibility for small reservoirs and ponds with village leaders and pond owners. The staff in the organization often go to the countryside to check the situation, find problems and solve them in time, and report to the competent leaders if they can't solve them, which will attract the attention of the leaders and be solved in time. At the same time, assist the villages to clean up the garbage in the flood drainage ditch in time to achieve the standard of smooth drainage in flood season.
3. Flood control on duty. During the flood control period, we should consciously abide by the duty system. No matter day or night, no matter whether the weather is good or bad, there is no rest day, we should stick to our posts, fill in the duty situation of the day carefully, and provide the leaders with rain, water and disaster conditions in time to avoid missing posts.
Four, the basic data of water resources investigation work
In order to further grasp the utilization of water resources in each village, we went to the countryside to make a thorough investigation of each village and collected specific data such as springs, deep wells and vegetable fields. This work is complicated and long-term. We will continue to do a good job in all kinds of data census next year, and also create favorable conditions for applying for projects in the future.
Verb (abbreviation of verb) Do a good job in immigration investigation.
This year, the higher authorities arranged for the water conservancy department to conduct an immigration survey, which is related to the interests of future immigrants receiving subsidies. Therefore, from the first step to register immigrants, the second step to register immigrant children, deceased families, witness signatures and villagers' signatures, a series of registration processes require all villages to strictly control, the leaders are responsible, and the list is published. This immigration registration is the first time that the higher authorities have started this work. So many aspects are repetitive, complicated and tedious, so the village leaders feel very patient, but considering the vital interests of the vast number of immigrants, they still patiently explain to them so that there are no loopholes in immigration registration.
The intransitive verb prepares the project design report.
Through the survey section of the Water Resources Bureau, the survey and design projects of our town this year include xx tap water, xx flood control ditch, xx reservoir and xx ditch small watershed project. Among them, xx ditch small watershed management project was reported to the Finance Bureau, xx reservoir reconstruction was completed, and xx tap water project was reported to the Water Conservancy Bureau. Water is the lifeline of mankind, and the world is facing a water shortage crisis. In order to raise people's awareness of saving, water law publicity activities were carried out. Be able to go to the countryside in time to organize the general election of the village-level two committees in Baocun. Do a good job in Qingming fire inspection and new house project. Actively participate in theoretical study and various activities organized by government departments.
Work ideas for next year: do a good job in flood control, re-investigate the basic situation of dams, continue to do a good job in general survey of basic data of water resources and soil and water conservation, and severely crack down on indiscriminate sand mining and build buildings in flood control ditches. Timely report the drinking water project and flood control ditch project in each village.
In a word, in the past year, although our work has made some achievements, there are still great shortcomings. In the new year, under the correct leadership of our superiors, we will overcome difficulties, seize opportunities, blaze new trails, sum up experience, work harder to do all the work assigned by our superiors, and make due contributions to the water conservancy cause of our town.
Summary of Personal Annual Work of Water Conservancy (II) In 20xx, under the great attention of the superior and the correct guidance of the competent department, the water conservancy work of our bureau was guided by the core values of "dedication, pragmatism and tolerance", and firmly established the water control concept of "scientific development of water conservancy and harmony between people and water", closely focusing on the objectives and tasks of "doing a big job in the second quarter, breaking through in the third quarter and winning in the fourth quarter", through changing the style of work, rallying strength and
First, improve the quality, optimize the environment and further consolidate the foundation of water conservancy development.
1, the big discussion activities were carried out in depth. With the theme of "finding problems, making achievements and singing the theme of harmony and happiness" as the main content, the discussion activity of "optimizing the development environment and improving the service level" was carried out throughout the system, and "dedication, pragmatism and tolerance" was extracted as the core words of water conservancy values, effectively forming the common value orientation and pursuit of all water conservancy people; Strengthen the warning education of clean government in combination with the big discussion activities, deepen the "Ten Ones" work, firmly build the ideological bottom line of resisting corruption and preventing change, and effectively improve the ability of cadres in the whole system to resist corruption and prevent change.
2. Comprehensive coverage of water law publicity. With xx theme activities as the carrier, we invested xx million yuan, and concentrated on launching Water Law Publicity Month activities by building water law publicity street, carrying out peer-to-peer publicity, and widely publicizing through the media. At the same time, combined with river dredging, water administration inspection and other forms of law enforcement, through intuitive, negative and punitive publicity, deepen people's understanding of water resources protection.
3. The water census was promoted in an orderly manner. On the basis of fully completing the work of water conservancy census and inventory stage, the official census forms of xxxx census objects were filled in, reviewed and reported, and the preliminary census results were reviewed by experts at the same level and reviewed by the leading group in X years; Complete the general survey task of new beach reclamation project in X years; In the middle of X year, the census data passed the preliminary examination of the national office; X month passed the water conservancy census file acceptance, and the comprehensive acceptance issued by the water conservancy general office at the higher level shall prevail.
Second, improve the ability, fully guarantee and effectively promote the harmony between people and water.
1, do a good job in flood control and disaster relief. Fully deploy and implement flood control tasks, strengthen flood control safety inspection, clarify xx key flood control supervision projects and xx flood control hidden danger projects, and strictly implement rectification; Actively implement the construction of group monitoring and prevention system, and successfully hold flood control and disaster relief training and drills; Invest xxx million yuan to fully implement the construction of non-engineering measures to prevent mountain torrents; Solidly promote the construction of demonstration counties for flood control and typhoon prevention system at the grassroots level, and effectively improve the ability of flood control and typhoon prevention at the grassroots level.
2. Promote the construction of water supply projects. The first is to implement the safe drinking water upgrading project. We will build xxx kilometers of tertiary pipelines and xx purification projects to improve the drinking water conditions of X million people in xx villages. The second is to implement water-making projects. The expansion project of Yamashita xx factory has initially reached the intention of land acquisition, and the feasibility study has passed the examination and is awaiting approval; The expansion project of xx Waterworks has been completed and the feasibility study has passed the examination and approval; The expansion project of xx Waterworks has passed the feasibility study, and the preliminary design is to be approved; The expansion project of xx Waterworks has implemented the land use index and completed the examination and approval of the project construction document. The third is to implement the dredging project. Completed the dredging project at the bottom of the human reservoir, completed 86% of the dredging project at the reservoir beach, and will soon start the construction of the green barrier project.
3. Implement river cleaning and dredging. The first is to improve the long-term mechanism of river cleaning. The management measures for river dredging and regulation were revised, and the original policies, standards and requirements for river dredging and regulation were adjusted, in which the subsidy standard for river dredging and regulation was doubled on the original basis. The second is the implementation of river cleaning, dredging and regulation. Invest in cleaning funds of xxx million yuan, clean up the river course of xxxx kilometers, and the cleaning coverage rate is100%; Complete river dredging and regulation for xx kilometers. The third is to speed up the river dredging project. Among them, the dredging project of xx River has passed the completion acceptance, the dredging project of xx River has been fully completed, and the dredging project of xx River has started construction. Carry out soil and water conservation management. With the goal of sustainable development, we will strictly implement the examination and approval of soil and water conservation schemes for development and construction projects and the "three simultaneities" system.
Third, focus on difficulties, focus on solving them, and highlight achievements.
1, standardized and efficient administrative examination and approval. Taking "speeding up efficiency, improving service and improving efficiency together" as the main content, we will comprehensively sort out the approved projects, fully reduce the time limit for project approval, establish a joint meeting system in consultation with the construction and land departments, and strive to achieve "three regulations in one" when the project is submitted for approval, so as to promote the early landing of the project.
2. The river cleaning has achieved remarkable results. In view of the illegal activities on the water in the main rivers, the rectification activities of "river clearing assault month" were jointly carried out, and the obstacles in the rivers were completely removed through three links: "propaganda vehicles clearing the way, clearing orders being delivered, and forced demolition and follow-up".
3. The house demolition in the second phase of 3.xx has been vigorously promoted. According to the spirit of the on-site promotion meeting held by the superior, all towns (streets) along the line are required to completely complete the task of demolishing the left-behind houses. The headquarters of the second phase of xx actively cooperated, focusing on strengthening the house demolition of key nodes such as xx to avoid contradictions, avoid detours when encountering problems, and comprehensively clear the obstacles in the project construction. It laid a solid foundation for the smooth implementation of the next phase of the project.
4.xx made a breakthrough in cleaning up the arrears of water charges in the first phase. Residents in the first phase of xx residential area have been in arrears with water charges for X years, and have been in arrears with water charges for xx million yuan so far. To solve this problem, our bureau has actively carried out comprehensive debt settlement by strengthening communication and coordination, verifying comprehensive water price and improving service methods, and made great efforts to reform external management and install "one household, one meter", which completely solved the problem of water fee arrears in this community.
5. Effectively construct the national work pattern of preventing Taiwan. Firmly establish the idea of "disaster prevention and relief", constantly deepen the concept of national resistance to Taiwan, actively innovate working methods in the process of defending against Typhoon xx this year, and effectively protect people's lives and property.
Since the beginning of this year, with the joint efforts of all water conservancy workers, water conservancy work has made some achievements, but there are also some problems and shortcomings, including: the pressure of flood control and drought relief is great, and the accurate operation of reservoir water level is facing new challenges; The task of water administrative law enforcement is heavy, and water violations such as occupying water areas are repeatedly prohibited; It is difficult to deal with key project policies, which seriously affects the construction progress; There are many contradictions in the management of water supply enterprises, and the integrated management system of water supply needs to be gradually promoted; At the same time, the construction of organs is insufficient, and the sense of responsibility and service of a few staff members needs to be further enhanced, and some even have cases of violation of discipline. For the above problems, our bureau will face up to the difficulties, face up to the problems, solve them seriously in the future work, and constantly promote the new development of water conservancy.
Annual Work Summary (3) A water conservancy individual, with the concern of other comrades in the water management station, especially when reporting to the Water Conservancy Bureau, fully seized every opportunity to learn from professional water conservancy technicians with an open mind, and got timely help during his busy schedule. Over the years, I have grown step by step under the care of leaders and comrades, and my business ability has been continuously strengthened. In the management of township water conservancy, it quickly became the backbone of the business. The work of the past year is summarized as follows.
First, pay equal attention to construction management to ensure the safe operation of the project.
In the water conservancy projects in xx, most of them have low construction standards and long running time, and most of the original projects have become problem reservoirs. In addition, the canal system is not matched, the standard is low, and irrigation efficiency is not big. After on-the-spot investigation, under the leadership of the Water Conservancy Bureau, work was actively carried out, scientific planning and careful construction were carried out. In recent years, the investment in reservoir construction has increased year by year, and the construction of reservoir reinforcement project has provided favorable conditions for improving the present situation of reservoir. In recent years, the two reservoirs have been rebuilt, which can basically guarantee the tasks of flood control in summer and drought prevention in winter.
At the same time of project construction, we began to consider the management of reservoir projects. In order to fully mobilize the enthusiasm of villagers in various water conservancy areas, we have formulated detailed management methods, and paid special attention to village cadres, so that they can patiently and meticulously do the ideological work of villagers in water conservancy management and realize the importance of water conservancy construction. Strengthen publicity, control water according to law and create a good working environment. On the one hand, strengthen the publicity of water laws and regulations, educate the masses to put safety first and protect water conservancy projects; On the other hand, strengthen law enforcement, timely stop and seriously deal with violations.
Strive for the support of leaders at all levels and local village cadres, help coordinate and handle local contradictions, and greatly improve the management environment through long-term and meticulous work. Especially through demarcation, the scope of reservoir management has been clarified, water management units have legal management rights, and the external conditions of reservoir management have been completely improved. And establish a "self-sufficiency, self-sufficiency" operation mechanism. We make full use of surface resources, vigorously develop water conservancy and fisheries, and strive to improve operating efficiency and income-generating capacity.
Second, make full use of tap water resources and strive to improve operational efficiency.
In the tap water project, through the overall consideration of the Water Conservancy Bureau, the new mode of tap water management in villages and towns is actively explored, and the water resources are revitalized through the combination of individual contracting and water pipe station management, which truly achieves effective utilization and management. We fully tap the potential and rationally develop and utilize water resources. This new mechanism to speed up the reform of water conservancy investment and financing system has broadened the sources of funds for water conservancy construction, actively supported the combination of individual contracting and water management stations, and further broadened the channels for the development of township water conservancy.
Three. Plans for future work
1, strengthen study, actively do daily work, and strive to improve service quality. Only by constantly strengthening the study of various management systems and related business knowledge of water management units and constantly enriching themselves can we be competent for the post requirements. The personnel of the water pipe station should be responsible for implementing the policy and communicating internally and externally. At the same time, plumbing work is actually a service work. Therefore, the plumber is both glorious and hard, and needs a strong sense of professionalism and responsibility; I need to have strong working ability and work art. In addition, I will strengthen my exercise, obey the arrangement, match my words with my deeds, take the overall situation into account, resolutely safeguard the unity of the leading group and maintain the image of the leader. At the same time, give full play to the enthusiasm of the staff of the water pipe station, make them strive for perfection, continuously improve the service quality and do a good job in water conservancy service.
2. Be a good staff assistant and serve the decision-making of superior leaders. I will timely and accurately grasp all aspects of the work dynamics, and timely feedback all aspects of information to the leadership; And pay attention to investigation and analysis, take the initiative to offer suggestions, make scientific analysis and judgment on various situations, and provide reliable basis for leadership decision-making.
3. Further do a good job in flood control and drought relief. Flood control and drought relief work is a long-term and important work, which must be highly valued and unremittingly grasped. Local rainstorm and flood are inevitable every year in xx county, and the water storage of water conservancy projects is insufficient, so the drought is likely to develop. It is necessary to establish ideological preparations for flood control and drought relief, further implement the responsibility system for flood control and drought relief, do a good job in the construction of the annual inspection system for reservoirs, continue to improve the flood control plan, continue to do a good job in the construction of the three-prevention command system in various places, ensure the safety of flood control, water supply and food production, safeguard people's lives and property, and minimize disaster losses.
4. Do a good job in various water conservancy work focusing on rural water conservancy. Water conservancy work should focus on serving agriculture, countryside and farmers, closely focus on the strategic deployment of building a new socialist countryside, and continuously strengthen the construction of rural water conservancy infrastructure with the goal of improving comprehensive agricultural production capacity, promoting rural economic development and increasing farmers' income. Today, we should sum up the experience and lessons, consolidate the achievements of rural drinking water, and further solve the problem of rural drinking water safety.
My processing ability and social skills need to be improved in my future work. But I believe I can exercise myself through my enthusiasm and serious and responsible attitude towards my work when I was young. At the same time, I also realized some methods and strategies to do a good job in water pipe station, and I believe I can do a good job in water pipe station.
Summary of annual work (4) Water conservancy individuals passed in the blink of an eye, and the sun and the moon flew like a shuttle. Time often goes by inadvertently, and a year passes in the blink of an eye between our fingers. Looking back on a year's work, I can't help thinking a lot, and I am happy with the harvest. From the hardships of exploration, I summarized my work and study in the past year as follows:
First, strengthen the study of policy theory and improve their political quality.
Over the past year, I have persisted in studying the principles and policies of the country, and in accordance with the specific requirements of the spirit of the documents issued by the office, I have completely completed all the work and learning tasks assigned by the office. In my usual study, I have further emancipated my mind through continuous practice and deepened my understanding of theoretical knowledge through personal summary, so that I have been strict with myself and consciously abide by the rules and regulations of the office, laying a solid ideological and political foundation for my future work.
Second, strengthen business study and improve work skills.
Based on my own work, I strengthened the continuous improvement of my business skills, always followed the pace of water conservancy in the times, followed the learning consciousness of advanced technology theory knowledge and professional technical knowledge, became a learning worker, strengthened the spirit of seeking truth from facts, innovated various concepts, improved the essential requirement of being in power for the people, and further improved my business skills and organizational management ability with my continuous efforts and the help of my colleagues, so that my business skills and level were further improved.
Third, do your job conscientiously.
I work hard, obey long-term arrangements, and strive to complete various tasks. The safe operation of the project is the primary task to ensure irrigation. Over the past year, I have persisted in further understanding and mastering the current situation and operation of the project, and carefully studied the engineering performance of each main canal, the installation and debugging of information automation facilities, and the inspection, replacement and maintenance of each bucket hoist. In the normal operation and inspection of the project, I always do: people, channels and eyes. Report problems in time, and coordinate and solve various systems and post objectives and responsibilities of project management in time. The number of patrol reports on problems existing in normal operation and key canal sections has been increased, and the safe operation of the project has been realized.
In the next emergency repair, I and the staff on the section, under the scorching sun and the number of households, jointing the collapsed place of xx, working overtime to strictly control the quality, ensuring the seriousness of engineering maintenance and the reliability of operation management. This is the safe operation of the project in the past year, which ensures the normal irrigation in the irrigation area.
Four. Irrigation management
1, calibration of metering facilities is an important task of hydraulic engineering. A new description is given to the measuring weir, which ensures the clarity and accuracy of the observation water gauge. In the metering work, in cooperation with the statisticians of our hospital, xx metering inspections were carried out on the water intakes of various departments throughout the year, ensuring the accuracy of metering.
2. During the inspection of normal irrigation water distribution channels, I dutifully adjusted the design flow of channels at all levels according to the instructions in paragraph, carefully filled in the water level records observed during the inspection, and strictly carried out the inspection of water distribution for each channel three times a day, so that all crops were irrigated in time, and there was no drought on an acre of land, achieving a "double harvest" of economic and social benefits.
This year's work is over. While some achievements have been made, the task of water conservancy system is also very arduous. We should constantly sum up experience, find loopholes in work, analyze the reasons, constantly improve working methods, strengthen unity and cooperation, be strict with ourselves in all aspects, further forge ahead, always maintain the first-class spirit, and strive for the overall goal of water conservancy projects!