Current location - Education and Training Encyclopedia - Graduation thesis - Summary of industrial work of automobile sheet metal (5 selected articles)
Summary of industrial work of automobile sheet metal (5 selected articles)
Time flies, and 365 days a year is coming to an end. We all want to write the annual work summary, so the following is my "Complete Works of automotive sheet metal's Work Summary Model essay" for your reference, hoping to help friends in need.

20XX has passed, and we are about to usher in a challenging 20XX year. Looking back on the work of 20XX, first of all, I would like to thank all the leaders for their support and help to the work of the sheet metal workshop, and all the staff for their diligence and dedication in this bumpy year, and for working together with * * * to successfully complete all the work indicators issued by the company. The specific work report is as follows:

I. Main Work Situation

1. According to the company's production and operation plan, a batch of XX products and other accessories were produced.

2. According to the production plan of FRP workshop, we have completed the production of various small parts, mainly including XX products, XX products, XX products and several other small parts, and actively cooperated with the development of new products and iron parts in FRP workshop.

3. According to the production plan of the injection workshop, the production of various small parts has been completed, mainly including XX products, XX products, XX products and several other small parts.

4. Assist in the establishment of large warehouses. During the preparation in big warehouse, clean up the site for big warehouse without delaying production; When big warehouse was founded, we made ***XX shelves for big warehouse. During the planning of big warehouse, according to the requirements of big warehouse, various labels, signs, material trays and sanitary carts were made for big warehouse.

5. According to the production demand of each workshop, more than ***XX ovens, flatbed cars, shelf cars, scrap cars, iron frames, signs and working platforms have been designed and manufactured for each workshop. It provides convenience for the production and turnover of each workshop.

6. According to the requirements of the comprehensive management department, in order to meet the needs of orderly and safe storage of dormitory personnel, the dormitory cabinets were designed and made by rational use of leftovers, and two pieces have been made and put into use at present.

7. Complete various engineering projects of the company. It mainly includes the completion of beam welding and scaffolding work in the FRP trimming workshop, the maintenance of various equipment, the maintenance of workshop doors, the maintenance of radiators in various workshop departments and dormitories, and the solution of problems such as house leakage and circuit safety.

8. Complete other work arranged by the company.

Second, the future development direction

The year of 20XX is a turbulent year for the sheet metal workshop. Both the working environment and the work content have changed greatly, and the work content has gradually changed from producing external parts to producing internal parts. During this transformation, our workshop actively adjusted the staff, and when the peak season came, we promptly mobilized the staff of the sheet metal workshop to work in the foaming workshop, which rationally distributed the work of our existing staff and achieved a win-win situation.

In view of the present situation of the sheet metal workshop, after careful consideration, I have planned the future development direction of the sheet metal workshop. It is suggested that the sheet metal workshop and die workshop be merged into a new workshop, which is mainly responsible for the development of dies, the production of internals and the maintenance of equipment, so that we can make full use of the strength of our existing personnel, retain talents and ensure production. This is just my personal opinion, please consider it by leaders and colleagues.

In 20XX, the company will usher in a new round of great development. I believe that as long as we work together in Qixin, Qi Xin will be able to ride the wind and waves and write a more brilliant chapter!

thank you

Sheet metal workshop

20xx65438+February 22nd.

Summary of automotive sheet metal's Industrial Work (5 Selected Articles) 2XX years will soon pass. Unconsciously, I stayed in our company for a year, and my sense of accomplishment, joy, responsibility, enthusiasm, enthusiasm and enthusiasm were intertwined in this full year, which made me constantly improve my consciousness. A brief review is summarized as follows:

I. Work performance

Over the past year, as a sheet metal worker, I have been strict with myself ideologically, love my career, be strict with myself, spur myself, and strive to think that this young man can bear hardships in the eyes of leaders and colleagues, not too dirty and tired, and work hard, and never drag his feet when he gets to work. As a sheet metal master, I worked hard to improve the speed and finish the tasks assigned by the managers on time in the first half of the year while ensuring the quality. Once, an accident car was picked up by the driver from Jiangsu. I happened to have something to rest that day, and the rear bumper and some small things were not finished. Joe, they are busy, so call me. Thinking of punctuality and trustworthiness, it is not easy for customers to come once, so they quickly go back and tidy up the rest. I suddenly felt that my sense of responsibility had been rewarded when I heard the thanks from my customers. The output value began to be unsatisfactory in the second half of the year, and then I tried to ask Joe for advice. Only in this way can we come to the conclusion that the bigger work is almost done, so we will hand it over to the people below, and then we will do other work ourselves. We can't stare at a car all the time, it may be inefficient to consume time. After a period of hard work, I feel that our group has made great progress immediately.

Second, there is insufficient work.

No one is perfect, because he is stubborn, too subjective, does not listen to advice, makes many mistakes, reduces efficiency, and leads to the loss of factory profits. I remember BYD had an accident car girder. I tied the chain to the lower arm of the rear axle to pull the front beam. Manager Xu saw it and told me that it was probably not strong enough. I didn't care about the deformation of the lower arm and asked the warehouse to reissue another one, which delayed the delivery time and lost the interests of the factory.

Three. Work suggestion

Disputes often occur between sheet metal workers and painters. The reason is that in order to achieve speed, sheet metal workers spray a lot of things instead of disassembling them. (there are also parts problems, which are difficult to spray. ) coordination is not good, and some places are not knocked well and handed over to the painter. It is suggested that the sheet metal worker should complete the accident car, hand it over to the painter after being checked and signed by the supervisor or manager, and coordinate with the painter in advance if there is any problem, so as to further enhance the friendly relationship between sheet metal and spraying.

Personally, I feel that the effect of painting many cars is not very good. On the one hand, it is because there are more people and fewer cars, on the other hand, it may be because I only want to pay attention to the output value and ignore the quality. Therefore, it is suggested that the manager or the front desk staff score the paint effect of each car when inspecting the car, and directly control the salary.

After the accident car is dismantled, the insurance company will fix the damage. Now the warehouse staff will ask the sheet metal workers and technicians what accessories to send and what not to send. In fact, as long as you remove the statistical accessories, you can use a pencil to mark what is used and what is not used. This not only saves time, but also saves the warehouse staff the trouble of running around asking whether to send this or that, and also avoids wasting time looking for this or that part that is not known to be bad.

Fourth, safety work

Safety is the key point, whether it is work or life, life safety and mechanical safety, we need to attach great importance to it at all times. This year, there have also been individual safety accidents at work, some of which have been slightly stumbling. These small problems prove that there is still some carelessness, insufficient attention to small details and insufficient safety awareness. In the future work, it is necessary to make up for the thoughtless security risks.

To sum up the above points, there are still many shortcomings. In next year's work, we must get rid of bad habits, actively consult managers and colleagues, and read more useful books. Strive to become a first-class talent in the industry.

20xx is a special year and a year of progress for our team. Over the past year, as the team leader, I have been strict with the team members. I hope that we will grow into a team with dedication, ideological progress and certain practical experience. There are achievements and shortcomings. Let me review this year's work in order to be more conducive to next year's work.

As a team leader, I am fully aware of my post responsibilities. Teams and groups are grass-roots organizations that organize production and business activities. Have the responsibilities of improving product quality, improving production efficiency, reducing costs, preventing industrial accidents and assisting superiors. As a team leader, you need to upload and distribute, assist the leader and maintain the internal stability of the team. We should also be brave in taking responsibility, be lenient with others, be strict with ourselves, love the team, develop the team and pay attention to working methods. Strengthen communication with team members, stimulate everyone's subjective initiative and enhance the cohesion of the team.

This year, our team has a special person in charge of equipment, reducing equipment failures; Special person is responsible for the mold to reduce the damage of the mold; The refinement of daily workload ensures the smooth completion of work tasks; The full use of scraps greatly reduces the product cost.

Of course, our work also needs to be improved and perfected. Here are some examples:

In the * * * * project, the door panels designed by the team were 50mm more than the boxes, mainly because the engineering drawings were marked incorrectly and the team did not check them carefully. In the * * * project, we cut off 1 in the bus duct, which made it impossible to install the bus duct. The problem is that the engineering drawings are ambiguous and the team members have not communicated with the technicians in time. We have held a meeting to reflect on the above problems, and we will ensure that we try our best to avoid making similar mistakes in our future work.

20xx years have passed, achievements and shortcomings can only explain the past, and we are more concerned about the future. In the future work, we will continue to work hard, foster strengths and avoid weaknesses, innovate, keep learning, be brave in pioneering and enterprising, and create a brilliant future. In order to better achieve the goal of 80 million-1 billion, our group also needs to strengthen theoretical study, improve its own quality, pay attention to practice and tap production potential. Generally speaking, we plan to work hard from the following points:

1. Respect leaders, obey distribution, unite and help each other, and strive to form a cohesive team with the same goal.

2. Insist on holding a team meeting every week, sum up the work of the week, solve problems in time, and refine the tasks of next week to each employee to ensure the completion of the tasks.

3. Organize employee training once a month, improve operational skills in theory and practice, learn from each other, learn from each other's strengths, give full play to one's strengths, do what one can, and complete tasks faster and better.

4. Organize regular study on safe operation system to ensure that there are no safety accidents throughout the year.

5. Refine each production process into each working procedure, make clear what points need to be paid attention to and seize the problem.

6. Materials should be placed neatly, so that everything will have its place, and everything will have its quantity. Insist on cleaning posts every day, study hard and do it according to 6S requirements.

7. In the operation and management of the equipment, the installation and debugging of the mold need a certain professional level of personnel to be responsible for the maintenance and cleaning of the equipment every week, which improves the effective utilization rate of the equipment, reduces the damage rate of the mold to the lowest point, and improves the solid guarantee for us to complete the production task.

8. Organize employees to learn quality knowledge regularly, strengthen self-inspection and mutual inspection in the production process, and prevent unqualified products from flowing into the next working procedure. For quality problems in production, carefully fill in the list of corrective/preventive measures, find out the root causes of the problems and reduce the occurrence of quality problems.

Summary of metalworking work in automotive sheet metal (5 selected articles) Part IV: We conducted a three-week metalworking practice in the Metalworking Practice Center of Guandu Campus. During this period, we studied lathe, milling machine, planer, fitter, welding, grinding, casting, forging and other jobs. Due to the limitation of school equipment and our time, we mainly contact lathes, milling machines, planers, locksmiths and welders. With the patient and meticulous teaching of teachers and our active cooperation, we did not have an injury accident, basically met the expected internship requirements and successfully completed the three-week internship.

During the period, the commuting system was implemented, which made us feel the atmosphere when we joined the work in the future. Go to work at 7: 30+0 1 every day, get off work at 2: 30 pm, and end the internship at 5: 00. This made me get rid of the bad habit of sleeping late, and I went to bed early at night, which was a bit like the iron discipline environment when I returned to military training. Metalworking practice is as close as possible to the commuting system of actual production, which makes us feel a completely different way of attending classes from the classroom. It is very important to understand the discipline in production.

The first problem in production is safety, followed by efficiency. On the first day of practice, the teacher gave me a safety education class, watched some examples of unsafe operation, and learned about the safety problems that all kinds of jobs should pay attention to, such as not fooling around, curly long hair, not wearing slippers and so on. All types of work have more safety requirements, fitters are allowed to wear gloves, but turners are not allowed to wear gloves, and welders must wear gloves and masks. ...

First, unforgettable lathe

We are arranged to study lathes in the first week. C6 132A 1 horizontal lathe is the main object of our study this week. First of all, the teacher pointed to the various parts of the lathe while explaining to us. Lathe is mainly composed of gearbox, spindle box, change gear box, feed box, slide box, tool rest, tailstock, lathe bed, lead screw, polished rod and joystick. The lathe is operated by each handle, and the teacher explained to us the function of each handle, as well as the speed and feed required for a certain material, and different tools should be used according to different turning.

In fact, there are some dangers in making lathes. The teacher said that once a school student forgot to take the wrench to tighten the three-jaw self-centering chuck when operating the lathe, and then started the lathe. As a result, the wrench broke his head. At that time, I felt chilling after listening to it. It is too dangerous! But the teacher said that in order to avoid this situation, the lathes in our school are all equipped with spring button devices. Without a wrench, the lathes can't be started. This device ensures the safety of our practice.

The teacher told us that one of the keys to the quality of machined workpieces is the installation of tools. Pay attention to several points when installing turning tools: (1) The tip of turning tool should be equal to the axis of lathe spindle (175mm when we installed it). (2) The lathe tool spindle should be perpendicular to the lathe spindle axis. (3) Don't extend the turning tool too long. The extension length is generally 1.5-2 times the thickness of the handle. (4) The gaskets at the lower part of the arbor should be smooth, and the number should not be too much, generally 2-3 pieces. (5) After the lathe tool position is installed, the tool rest screws should be tightened, usually with two screws alternately.

The teacher showed us the operation while explaining it to us, and also reminded us what problems we should pay attention to in some places. With the skilled skills of the teacher, the material with rough surface has become a workpiece with smooth surface, and we are amazed. But when it comes to my operation, it stumbles me, and the accuracy is difficult to achieve. It's really a test. I kept turning the horizontal and vertical control handles, constantly measuring the size, and carefully processed it for a whole afternoon. When I thought I was almost the same, when my first workpiece was about to be born, I was ready to make the last cutting, but I rashly reduced the diameter of the shaft! I am very sad. At that time, my mood was quite depressed and helpless. The original successful product was destroyed by myself. There is no choice but to do it again. Through continuous efforts, the workpieces I made basically meet the requirements, which makes me very happy. After a few days, the sweat was not in vain, and finally something will be gained.

As there is only one milling machine and one planer, we study in batches. First, the teacher explained to us the structure and usage of milling machine and planer, and then the teacher personally operated the demonstration. The main components of milling machine are: bed, beam, spindle, longitudinal workbench, transverse workbench and lifting platform. The main components of planer are: lathe bed, ram, tool rest, workbench and transmission mechanism. Due to the limitation of equipment, we divide the cylindrical iron bars into three groups, milling two faces with a milling machine and planing four faces with a planer.

Second, the hardest internship-fitter

In the second week of internship, I started the locksmith internship. To tell the truth, before I entered the locksmith internship, I didn't know what a locksmith was and what to do. After the internship, I learned that fitters mainly rely on manual operation and use various tools to complete the processing, assembly and repair of parts. Compared with machining, it has high labor intensity and low production efficiency, but it can complete the work that machining is inconvenient or difficult to complete, and the equipment is simple, so it is still an indispensable and important type of work in mechanical manufacturing and repair.

First of all, after the teacher said the relevant content, he played the video. Through the video, we learned more about the work of locksmiths. After that, the teacher introduced us to relevant tools and usage, such as file, one-legged gauge, line drawing table, hand saw, dial indicator and so on. The teacher demonstrated the holding method, filing posture and filing method of documents.

After the introduction, the teacher asked us to use iron bars as materials and process a hexagonal nut according to the pattern on the wall. Wow! It is necessary to file two end faces and six side faces, and to drill and tap. When can I finish it? In addition, there must be accuracy. At first, I filed all morning, my hands were sore and I didn't file my face well. I gradually lost patience, but seeing that my classmates are working hard, I decided to stick to it. It seems that the assembler needs patience to do it well. In the process of filing, I always file the end face to be low on both sides and high in the middle, and then I know that the filing method is wrong. When filing, we should master the change of the force exerted by the file during handling. When pushing the file forward, the force exerted on the file by both hands should strive to make the file move forward in parallel (the pushing process must be straight) and cannot swing up and down; When returning, no pressure can be applied to the workpiece to reduce the wear of the file teeth. Straight file, horizontal file and push file can all be used for filing. After both ends are filed, the next step is to draw lines (on the drawing table). After drawing the line, cut off the redundant parts (pay attention to the machining allowance) and file them as required. Then drilling, tapping and rounding are carried out to complete the hexagon nut. Next, we made screws and evaluation parts-trapezoidal fittings.

To tell the truth, locksmith internship is boring. He may have been doing an action repeatedly all morning, but he still needs strength and accuracy, that is, holding a file back and forth on the workpiece. At noon, my whole body ached and my legs were stiff. Therefore, fitter practice can exercise our patience.

Thirdly, heat treatment.

The internship entered the last week, that is, hot processing. This week we learned about sheet metal forming, gas cutting, gas welding and covered electrode arc welding. I also know manual plasma cutting, TIG welding, automatic submerged arc welding and resistance welding.

On the first day, the teacher first introduced us to the relevant equipment of the training center, such as hydraulic shearing machine, shearing machine and rolling machine. Next, we will explain the sheet metal unfolding method called "the land of heaven and earth".

Our group first learned gas cutting, which mainly uses the heat released by the combustion of acetylene and oxygen to cut. These devices are acetylene cylinders, oxygen cylinders, pressure gauges, catheters and cutting guns. Turn on a little acetylene and oxygen switch, ignite, gradually turn on the big button, adjust the fire to suit (only adjust the center of the flame a little), preheat before cutting (wear protective glasses when cutting, tilt the gun outward by 5- 10, and the nozzle is 3-5 mm away from the iron block), and turn on the oxygen button at the top until the molten iron overflows and moves slowly. I often keep cutting because the top oxygen switch is not open enough.

Gas welding is to use the high temperature generated by gas combustion to melt the weldment and welding wire to form a joint. Gas welding is suitable for welding low-carbon steel sheet, cast iron and alloy weldments with low quality requirements such as copper and aluminum below 3mm. Its device is similar to gas cutting, except that gas cutting uses a cutting gun, which uses a welding gun. The teacher asked us to remember two points when welding:

(1) flame core contact weldment;

(2) The weldment shall be liquefied.

Finally, we study arc welding. According to different materials and requirements of weldments, welding voltage and current should be adjusted. There are two ways to strike the arc:

(1) arc striking method is an ideal arc striking method;

(2) scratch arc method. When welding, the teacher asked us to master three degrees:

(1) The angle of the covering electrode is perpendicular to the front and rear angles and 80 degrees to the left and right angles.

(2) Welding speed.

(3) the length of the arc.

At first, I often found covered electrode stuck to the weldment. After practice, this situation is less, but it still exists. It turns out that this technology can't be practiced overnight.

During the internship, the teachers' professionalism and rigor made us admire. Teachers can take pains to help us find errors in the program over and over again. Some programs are particularly long, but the teacher doesn't care. As long as there is a little fault, we should find out and try our best to make the students' works more perfect. The teacher will show the students how to operate again and again until the students really understand. This spirit is worth learning from each of us.

After the internship, I feel that the internship life is different from what I imagined before. Internship is not a simple thing, not our holiday, not an easy thing, but a laborious thing. Although I am very tired and bitter during my internship, I feel very happy! Because we not only learned the basic knowledge necessary as a mechanic, but also exercised our hands-on ability.

Metalworking practice is an effective way to cultivate students' practical ability. Metalworking practice is another opportunity for us to actually master knowledge. Without the rigorous environment in the classroom, we will feel the atmosphere in the workshop. At the same time, we feel more about the significance of being a worker, which makes us more aware of our responsibilities.

Labor not only transforms nature, but also transforms human mind. After three weeks of metalworking practice, I also have a deep understanding of this aspect.

(1) Labor is the most glorious. Only by practice can we appreciate the pain and joy of labor.

(2) Perseverance, care and patience.

(3) Be serious and responsible, and pay attention to safety.

(4) As long as you pay, you will get something.

Internship not only brings us experience, but also cultivates our hard-working spirit and serious style. We learned a lot that books can't. It makes us know how to observe life, dare to explore life, and also provides us with an opportunity to know and understand life in many ways. At this time, I still miss the metalworking practice very much. It enriches our knowledge and makes us more aware of such a sentence: "What you get on paper is shallow after all, and you never know what you are going to do." In this short three weeks, I learned a lot that I couldn't learn in class, and I got an exercise in my will quality. I have learned a lot of work knowledge, which is another valuable asset in my college life and will have a great influence on my future study and work.

Automotive sheet metal's industrial work summary (five selected works) has quietly left in 20xx. In this year, with the help and support of company leaders and team members, our team has successfully completed its work through continuous efforts and in accordance with the requirements of the company and departments, made new breakthroughs in working mode, and greatly improved its working methods and efficiency. The work in 20xx years is summarized as follows:

First, pay close attention to safety management and reduce accidents.

Compared with other teams and groups in the company, the sheet metal shift has many potential safety hazards and is more prone to accidents. Although there have been no major industrial accidents in our group in the past 20xx years, hidden dangers always appear, which has a certain impact on the company. We are responsible for the safety of every brother who comes to work.

Second, ensure product quality and improve product quality.

With the expansion of the company's scale and the improvement of brand awareness, consumers have higher and higher requirements for the quality of switchgear. As a result, the company's high-level attention to product quality has also been mentioned to an unprecedented height. As the front-line team of the company's production, the responsibility of the sheet metal office is getting bigger and bigger. Due to our responsibility to the company, we have never slackened our efforts in quality control, and actively and timely communicated with our colleagues in the quality control department. We never let go of defective parts in the production process. At the same time, strengthen employees' understanding of the importance of quality, and ask everyone to do self-inspection and mutual inspection to ensure that a problem does not flow from the team to the next process.

Third, strengthen team building and improve team management.

There are many problems to be solved in the team. In order to solve these problems, our department has taken measures to standardize the implementation of the positive incentive system. Give notice of praise to the employees who perform well in the team, produce xx and other "stars of the week", and punish the employees with poor performance and employees with major quality accidents by withholding bonuses. Due to the adoption of a clear performance reward and punishment system and a fair and just assessment method, the execution of team members has been greatly improved, and the cohesion of the team has been improved.

Fourth, strengthen self-study and improve professional level.

During this year, all employees of the sheet metal class actively improved their operation skills, worked hard to improve work efficiency and quality, and strived for initiative. Through this year's efforts, I have made some progress, I can calmly deal with various problems in my daily work, and I have greatly improved in all aspects, ensuring the normal operation of all the work in this position, being able to treat all the work with a correct attitude, and having a strong sense of professionalism and responsibility.

Verb (abbreviation of verb) actively participates in the improvement activities of the company.

The company is like a big family. We live and work in this warm family every day. As a member of this big family, I think we have the obligation and responsibility to build it better and more harmonious. Therefore, over the past year, we have actively participated in the company's improvement activities, mobilized the enthusiasm of team employees, and made many valuable improvements to the workshop by using collective wisdom.

Thanks to the help of leaders and colleagues, we will make persistent efforts in the new year. Reward the care and love of the leaders with better work performance!