(2) Project production and schedule control:
Organized the construction schedule network plan and labor force plan. In the production process, according to the actual situation, the whole project production is controlled and managed by making plans. At the beginning of construction, there was a shortage of labor. In this regard, we call on idlers to work together to basically ensure the construction period.
According to the engineering requirements, make the construction organization plan and create the construction conditions in time. In order to make the whole project schedule consistent with the original planned construction period, specific requirements are put forward for its specific schedule and production content.
(3) Safety and equipment management:
According to the characteristics of this project, plan and arrange the construction work area and make the equipment demand plan. In the process of construction, safety management is the focus of daily management, and ensuring safety without accidents is the first priority. Therefore, the management work has been strengthened from the following aspects: ① Strengthening the safety technical disclosure. Strengthen the safety awareness of employees through three-level safety education when entering the site and special safety disclosure when taking up the post. (2) Strengthen safety inspection and patrol, find problems in time, rectify them in time, and put an end to potential safety hazards. Strengthen the safety protection of buildings. At the same time, all the equipment on site is managed by special personnel. Check the equipment after it enters the site, and install it in place after there is no potential safety hazard. In the process of construction, the equipment shall be repaired, maintained and inspected regularly, and the problems shall be repaired and replaced in time. Ensure safe construction and achieve the expected purpose of safe production.
(4) Management of materials, cost reduction and labor cost:
I made a material demand plan according to the construction process. At the same time, in view of the actual situation that some tools and equipment of this project need to be rented. Make use plan and return plan. During the whole construction period, there was no large backlog. Arrange personnel to count the content and quantity of materials in time during the use of materials, adhere to the quota acquisition system, and correct and rectify the waste in time when it is found.