Collection of summary papers on coal mine safety work
How to write a summary of coal mine safety work? The following is the Summary of Coal Mine Safety Work in Fan Wenxuan compiled by me for you. Welcome to read, for reference only, I hope it will help you. More articles are in the work summary column, I hope you can pay attention to and read.

In August, under the correct leadership of the municipal party committee and municipal government, the superior competent bureau and the group company, Qi Xin, a cadre and worker of the whole company, worked hard to overcome many unfavorable factors such as the great change of underground geological conditions and the difficulty of safety management. He strictly followed the instructions of his superiors and the requirements of the company leaders, and worked hard to successfully complete various safety production indicators in August. The related work is summarized as follows:

I. Safety in production

(1) Security situation

In August, the Safety Technology Department * * * found out that there were problems in each mine 126, and fined xxxx yuan, of which Xiaogang Coal Mine found problems in 4 1, and fined xxxx yuan; Yangquan coal mine found 62 problems and fined xxx yuan; Sihuai Coal Mine found 23 problems and fined xxxx yuan. From the analysis of the problems found and the tickets issued, the problems in roof management and electromechanical transportation are still high. In August, 43 problems were found in roof management, 32 problems were found in electromechanical transportation and 28 problems were found in one ventilation and three prevention.

(II) Production situation

In August, * * * Company produced 67,762 tons of raw coal, and completed the driving footage1115.3m; Among them, Xiaogang coal output is 45,029 tons, with footage of 574. 1 m, Yangquan coal output is 138 17 tons, with footage of 238.5 meters, and Sihuashu coal output is 8,965,438 tons, with footage of 302.7 meters. From the analysis of production situation, the excavation efficiency of each mine can't keep up with the needs of current production, and the excavation and connection is still the main problem restricting production, which needs to be carefully studied to improve the excavation efficiency and ensure the normal operation of excavation and connection.

Second, the implementation of key work last month and the main work carried out

According to the arrangement of the company's safety office meeting on August 6th, the following work was mainly done in August:

(-) All coal mines attach great importance to safety work ideologically and practically. According to the current safety situation, the company's safety technology department and the coal mines carefully summarize, analyze, arrange and check, and the coal mines decompose, implement and require the safety tasks by holding special meetings and early meetings. The safety technology department of the company organized three coal mine safety section chiefs and safety mine managers to hold a regular safety meeting on June 20, 65438, demanding attention to the current safety work, and conducted unscheduled surprise inspections on three coal mines according to the resolutions formed at the meeting, which achieved good results.

(two) highlight the key points, grasp the difficulties, and manage the weak periods and links. All coal mines carefully sort out their own work, identify the key and difficult points in the work, formulate measures and carefully organize their implementation. Under the correct leadership of the safety technology department and Xiaogang Coal Mine Team, the supporting measures were improved during the downward mining of 74 12 working face in xx Coal Mine, and the phenomenon of roof caving pushing the bottom of the pillar was prevented. Xx coal mine -386 coal mining face retreated safely and smoothly, 1 1 109 coal mining face was initially put safely; Seasoning was used in the working face of Sihuashu Coal Mine1510/KLOC-0, which reduced the circulation and laid the foundation for the finishing work. 16 floor bypass and 16 floor auxiliary downhill are safely and accurately connected.

(three) take various forms to do a good job in employee education and training, and constantly improve the safety skills of employees. All coal mines continue to organize heart-to-heart talks, home visits and exchanges with employees. Through persuasion, education and persuasion, employees' safety awareness has been significantly enhanced; Secondly, according to the plan made at the beginning of the year, employees are trained, studied and tested; The third is to carefully organize safety knowledge sampling activities and reward those who have achieved good results in sampling activities.

(four) the implementation of strict system, strict assessment, strict investigation. According to a series of safety rules and regulations issued by the company, the company's safety technology department and various mines

Summary of Coal Mine Safety Work Fan Xuan 2 Since the beginning of this year, our mine has conscientiously implemented the spirit of the safety meeting of two-level safety management companies, continued to carry out the work of "double construction and double success", insisted on face-to-face training, improved the quality of all staff, and paid close attention to implementation, thus realizing safe production, putting an end to major malignant accidents, obviously improving the standardization level of mine quality, and maintaining a good momentum of stable and healthy development of safe production. Let's briefly summarize the safety work this year.

First, the basic situation of safety:

*, safety performance: put an end to serious injury accidents, put an end to gas, coal dust, water disasters and other vicious accidents, to achieve safe production; However, there was a serious injury accident xxxx, a minor injury accident xxxx and a non-casualty accident xxxx.

*, safety inspection: Mine * * * organized ten-day monthly inspection *xxxx, * * inspected xxx hidden dangers, including 3 A-level hidden dangers, 7 B-level hidden dangers and xxx C-level hidden dangers; At present, there are still major hidden dangers:

(1) and * * * work areas with double circuits and single power supply;

(2) The problem that the safety clearance at the bottom does not meet the requirements;

(3), * * * wellhead main fan capacity mismatch problem;

(4) There are different types of supports in the fully mechanized mining face, which are intact or not;

5], underground air compressor belongs to the problem of explosion-proof equipment;

[6], * * * wellhead boundary expansion problem;

Once, * * * wellhead heater problem.

3. Key safety project: * * total return air lane: it is estimated that *8xxxx will be completed on 1 1 month, with a total of 70xxxx, and the remaining engineering quantity is expected to be 30xxxx.

Bottom-hole powder magazine: At present, 3** meters has been completed, and all the shaft and roadway projects have been completed.

Bottom-hole sump: At present, 33xxxx has been completed, and all shaft and roadway works have been completed.

West Water Warehouse: 8 xxxx 1 1 month construction, with a total of 53xxxx, and the remaining amount of work * 0xxxx.

4. Management of surrounding small coal mines: According to the eight instructions of the group company, the mine has set up a professional management team to conduct regular inspections. At the same time, a deputy head of the * * * work area is responsible for supervising and inspecting the surrounding small coal mines from time to time; The recent situation of two small coal mines around the wellhead is: * * There is a small coal mine *xxxx, and no illegal production behavior has been found in the small coal mines in the mine field.

5. Completion of special treatment:

35 project plans have been completed, and xxx are planned to be completed. The capital plan is xxx million yuan, and the plan is xxxx. The unfinished projects mainly include: there is also a main fan installation project, and the wind lock of the main fan has not yet arrived. * * * is RMB xxxx.

6. Staff training: level 1 training plan for six special jobs *4xxxx, actual training xxxx and planned training xxxx; New miner training plan xxxx, actual training 3*xxxx, completion plan xxxx.

7. Quality standardization: In the construction of quality standardization, adhere to hardware management and improve the standardization working environment. * * * In the month of the mine, the inspection scores of various professional quality standardization bureaus were: coal mining xx, tunneling xxxx, electromechanical xxx, transportation xxx, ventilation xxx, geological survey xxx, dispatching xxxx and mine xxxx, which reached the ministerial standard.

8. Ground safety management: According to the document xx Electric (* 004) No.34 of the group company, the mine issued the document xx Hui (* 004) * No.4 of the xx River, set up a leading group for ground safety improvement and a professional management group, organized the ground safety inspection for xxxx times, and * * * found 97 hidden dangers, all of which were treated according to the three decisions.

9. Underground cadres: in * * month, the mine level should be reduced to 8*xxxx, but actually it should be * * 5xxxx at the department level of 87xxxx, and the actual level of xxxx team should be 70*xxxx, which all meet the specified requirements.

*0, catch three violations: * * month * * catch three violations of xxx person-times, including serious three violations of xxxxxx times, and punish XXXXXX.

Second, the main practices of safety work:

As far as safety work is concerned, there are three characteristics: one is to maintain good safety performance; Second, the hard environment of on-site quality standardization has been significantly improved, and the connotation level has been greatly improved; Third, while the scale of the mine is expanding, the core equipment is upgraded again. This is not only the characteristic of safety work, but also the goal set this year. Therefore, while carefully analyzing and summarizing the gains and losses in 2003, under the guidance of the spirit of the two-level company safety meeting, the mine established the idea of safety work in 2004. The basic practice of safety work is embodied in "four stresses", that is, grasping the foundation, grasping the key, grasping the major events and grasping the key points. Specific practices:

*, grasp the foundation. Formulate a management system that conforms to the actual situation of the mine, and establish and improve a high-frequency and all-round safety management supervision and inspection system.

At the beginning of xx, our mine took the implementation of the spirit of the safety meeting of the group company as the top priority, organized the three-level management personnel of the mine, branches and teams to study and discuss, and formulated specific operating procedures according to the actual research of our mine, and established an efficient and all-round safety management supervision and inspection system, focusing on the following five aspects:

One is to establish a comprehensive monthly assessment system for safety and quality performance of teams and departments, and list the total wages of teams and groups in the month as safety and quality content wages. At the beginning of each month, led by the mine safety supervision department, organize relevant departments to conduct a public assessment on the monthly safety management, engineering quality and performance of the team, and strictly honor it, and honor the * * * * safety performance salary xxxx.

Second, with the development of star-rated team construction competition as the core content, and by further improving the three-level assessment system of mine-to-team safety assessment, team-to-team safety assessment and team-to-individual safety assessment as the means, the quality acceptance and mutual inspection system, all-round post supervision system and on-site management system have been formed, which firmly grasp the dynamic of on-site safety quality and post operation quality and have been affirmed in the safety inspection of group companies.

Third, in terms of safety supervision and inspection, on the one hand, we continue to adhere to the acceptance system, insist on seriously investigating the problems existing in the site, and focus on investigating management responsibilities (investigating 3xxxxx times in * * * and imposing a fine of 7 * 3xxxxx), so as to ensure fair acceptance and strict performance of the assessment. On the other hand, adhere to the four-shift zero-shift safety team system led by mine leaders, and pay close attention to the safety management in remote areas and weak areas.

Fourth, the "face-to-face" training activities for cadres at the mine, branch and team levels were carried out, and the working system of cadres not training employees and not going into the well was established. At the same time, we insisted on the combination of Wednesday training and full-time training. First, the leaders of the branch must go to the grass-roots team for training on Monday and Wednesday; Second, adhere to the principle of combining team theoretical training with field practice, and highlight the training of practical knowledge. In * * *, * * held a full-time training course *0, and * * * trained xxxx, which received good results.

Fifth, efforts should be made to create a cultural atmosphere in the mining area with "safety first" as the soul. Since the beginning of this year, in cooperation with the Propaganda Department of Political Work, safety activities such as "Safety Comic Exhibition on New Year's Day and Spring Festival", "Safety Knowledge Competition" and "Safety System Knowledge Competition" have been organized. The staff reading room was established, which enriched the cultural life of the staff. Establish a "three violations" publicity column, implement the three violations and carry out negative education; Glorious compliance with regulations and shameful violation of regulations have gradually become the common sense of the workers and the masses.

*, grasp the key. Strengthen safety management during festivals.

In view of New Year's Day, Spring Festival, Mid-Autumn Festival, National Day and other major festivals, according to the actual work, some documents such as "Several Provisions on Strengthening Safety Management during the Spring Festival" and "Several Provisions on Strengthening Safety Management during the Mid-Autumn Festival and National Day" were formulated and issued, and detailed arrangements were made for the safety work during the festivals. First, we have grasped the key to the style of cadres, and paid close attention to the cadres' off-site and on-site work. The second is to strengthen dynamic inspection, strengthen safety supervision, and implement two lines of safety supervision, namely, dynamic inspection of teams and groups and follow-up review of hidden dangers rectification of safety teams and groups. During the festival, the mining team's activities were * * * 3xxxxx, 437 hidden dangers were detected, 5* person-times of various "three violations" were detected, and 73 hidden dangers were dealt with on the spot; The security team * * * found 54 hidden dangers, investigated the responsibility of the team for * * person-times, and fined * 36xxxx, which ensured the safety in production during the festival.

3. grasp the big things. Grasp the link to make up the set and optimize the hard environment for safe production.

Insist on optimizing the hard environment of safe production as a major event of mine safety work in xx years, and focus on nine transformations or deficiencies: First, upgrade coal mining units, eliminate xxx units and equip them with 375 units; Second, the monorail endless rope car was put into use, which optimized the auxiliary transportation system in the west area; Thirdly, a set of belt comprehensive protection is put into use, and the comprehensive protection of compressor and pressure relief valve is in place; Four, heading face rake coal machine is equipped with a fence; Fifth, replace the *4Kg/m rail **xxxx of the gangue hill and improve * sets of parking facilities; Sixth, install hydraulic pillow to start dynamic monitoring of roof; Seventh, two grease depots were built in the fully mechanized mining face, which realized the standardization of grease storage in the working face; Eighth, the installation of laser pointing device improves the management level of waist line in tunneling face; Nine is to complete the standardized management of belt lane and track lane at the **0xxxx meters of two wellhead.

4. Get to the point. Actively organize, strictly control and pay close attention to key safety work.

First, the "emergency plan for disaster prevention" was completed. By summing up the experience and lessons of safety work in our mine and combining with the objective reality at this stage, we actively organized production, dispatching, geological prospecting, electromechanical, ventilation, safety supervision, supply and other departments, and formed a more scientific safety management system in our mine after four joint reviews and revisions.

Second, according to the alternation of seasons, pay close attention to the safety management of seasonal key areas. With the change of seasons, our mine has carefully grasped its characteristics and conducted a comprehensive inspection of small coal mines, "three defenses in rainy season", fire prevention, key parts and public places. Give priority to prevention, earnestly implement the leadership responsibilities and various measures, especially the three precautions in rainy season, and focus on timely preparation of materials and personnel to ensure the safe flood season in August and prevent accidents and accidents.

Third, according to the characteristics of different periods on the site, timely adjust the management priorities, such as fully mechanized working face moving backwards, major temporary works, poor working face management, moderate transportation management in the western region, rectification of mining site support, and over-roof mining working face. In order to keep a close eye on the post and effectively supervise.

Looking back and summing up, the most important thing in safety work this year is to realize the stable development of safety production situation, but the gap in work can not be ignored: First, the vulnerability of mine site safety management is still very prominent, which is not suitable for mine scale development and equipment upgrading; Second, the standardization level of mine quality is still superficial in connotation depth; Third, the work of "double construction and double success" did not go deep into the hearts of employees, was not implemented on the spot, and the effect was not reflected; Fourth, there is no breakthrough in the stability of the workforce and the improvement of the quality of employees; Fifth, insufficient attention has been paid to key safety projects. In a word, while seeing the achievements, we must not ignore the problems. We must carefully analyze and summarize, find a breakthrough and find a breakthrough point.

In March this year, our coal mine did a good job in the investigation and rectification of hidden dangers and disaster investigation and evaluation during the earthquake relief, and did a good job in the investigation and rectification of hidden dangers in the aspects of "one ventilation and three defenses", roof management, electromechanical, transportation, initiating explosive devices, geological investigation and prevention of water, ground transportation and fire protection, ensuring safe production.

This month, we will focus on the following aspects of safety management:

1.After the "xxxx" earthquake, our mine completely stopped production on xx, xx according to the requirements of the municipal party committee, municipal government and the company. During the period of production suspension, the mine manager organization and the deputy mine manager participate in the hidden danger investigation of all mining heads in the whole mine, and strictly rectify the hidden dangers according to the principle of "four decisions and five implementations"; Led by the secretary of the Party Committee, organize the Safety Supervision Department, the Military Security Department, the Life Company and the Shen Zhi Office to investigate the hidden dangers of the workers' houses in the whole mine, set up tents for the dangerous households in time, and cooperate with the Municipal Education Bureau to set up temporary tent schools for xx primary school to ensure that the children of workers in our mine will start school on time on September 8; Do a good job in earthquake disaster prediction, and issue the ninth work briefing for earthquake relief, which ensures the accuracy and timeliness of earthquake disaster report in our mine; Seriously organized the study and training of employees during the shutdown period, which ensured the ideological stability and normal life order of employees during the shutdown study period, and laid a solid foundation for the normal production of our mine.

Second, in order to seriously learn the lessons from the "xxx" accident, implement the responsibility for production safety, strengthen on-site safety management, reverse the passive situation of safety in our mine, and ensure safe production in the later part of this year, our mine has formulated the Supplementary Provisions on the Investigation of Site Safety Responsibility, and earnestly implemented it, further increasing the penalties for hidden danger investigation, safety guarantee, cadres taking classes to go down the well, and failure to implement technical management responsibilities.

Third, strengthen gas management. Further clarify the working concept that gas overrun is a safety accident, and require the whole mine to closely focus on the comprehensive gas control system of "reliable ventilation, up-to-standard drainage, effective monitoring and management in place", strengthen leadership, implement responsibilities, and strictly implement the inspection system of high gas working faces in mines, districts and teams. Small class patrol system shall be implemented in gas working faces such as xxxx middle lane and xxxx transportation lane. The safety management of roadway crossing coal seam was strengthened to ensure that the gas did not exceed the limit, and 46 hidden dangers were found in the whole month ventilation, all of which were rectified according to the principle of "four determinations".

Fourth, strengthen on-site safety management, highlight the investigation and management of hidden dangers as the main line, and pay close attention to quality standardization construction as the basis to ensure safe production. Focus on adjusting the central support of xxxx working face of a fully mechanized mining team; Pay special attention to the safety management of gob-side entry retaining in transport roadway of xxxx working face of fully mechanized first and second teams; Do a good job in the implementation of safety technical measures such as anti-skid, anti-spalling and anti-flying stone in the working face of large inclined seam; Safety management during initial mining and caving in xxxx working face of coal mining team 1 and xxxx working face of mechanical mining team 2.

Five, increase the investigation of hidden dangers of electromechanical transportation. Increase the safety inspection of power supply, reduce the number of unplanned power outages and wind stops, standardize the installation inspection and acceptance of small winches, intensify the rectification of transportation order, and prevent transportation accidents. 52 hidden dangers of electromechanical transportation were found in the whole month, and all of them have been rectified.

Six, strengthen the management of initiating explosive devices and road traffic safety. This month, a weekly special inspection of initiating explosive devices was organized, which was led by the military security department and participated by the safety supervision department. The two powder magazines, Ganbatang and Muduqing, were inspected one by one, and the transportation, storage and use of initiating explosive devices in all underground mining heads were comprehensively inspected. Three hidden dangers were found, all of which were rectified according to the principle of "four determinations".

7. This month, our company * * * received company document 18, all of which were seriously rectified as required, and 8 notices of major hidden dangers were issued, all of which were rectified according to the principle of "four decisions and five implementations". There were 5 minor injuries and 5 people injured in our mine in the whole month, which ensured that the minor injuries did not exceed the standard. All kinds of fines are estimated to be about 654.38 million yuan.

Security priorities for next month:

First, do a good job in the work of cadres on duty on National Day and weekends, and require the main party and government leaders of all units to adhere to the duty system of entering wells on National Day and weekends. Mining teams must implement the double-follower system, and all units must report the double-follower schedule one day in advance. The safety supervision department, the dispatching information center and the Party Committee work department will organize post inspection activities from time to time, and those who violate the regulations will be strictly and severely investigated for responsibility.

Two, do a good job in road traffic safety inspection during the festival.

Three. Intensify the investigation of on-site safety management responsibility, and strictly implement the relevant provisions of the Detailed Rules for the Implementation of Special Provisions of the Company to ensure safe production in the later part of this year.

Fourth, strengthen on-site safety management. Continue to pay special attention to the gas assessment and management of xxx coal mining face, and adhere to the patrol inspection of high gas working face; Pay special attention to the safety management during the initial mining and caving of xxxx coal mining face; Do a good job in the safety management of adding frames in xxxx fully mechanized mining face: focus on the safety management during the installation and initial mining of xxxx working face in No.1 coal mine, the exit under XXXX working face in No.2 coal mine, the safety management to prevent the floor rock from slipping, and the safety management of gob-side entry retaining in No.1 coal mine; Pay special attention to the safety management of XXXX working face, the installation of XXXX working face and the ending of xxxx working face, and pay special attention to the safety management of preventing flying stones, spalling and skidding in the mining of large dip seam working face, put an end to parallel operation and ensure safe production.

Five, strengthen the safety management of key parts. Strictly implement the system of receiving and returning initiating explosive devices, and the military security department, safety supervision department and supply department will organize a weekly investigation of potential safety hazards in the powder magazine. The military security department, the safety supervision department, the mechanical and electrical department, the transportation area, the infrastructure office and other departments should strengthen the safety inspection of key departments, especially the safety inspection of waste hills, substations, compressed air rooms and industrial plants and facilities, and report to relevant departments and leaders in charge in time when problems are found; Life Company must strengthen the safety inspection of earthquake prevention, flood control, fire prevention and power supply in the living quarters of employees, and Shen Zhi Office and Life Company should strengthen the safety inspection of employees' housing. Every time it rains and blows, it is necessary to organize hidden dangers investigation, report to the leaders in charge in time when problems are found, and report major problems to the main leaders of the mine at the first time. For the problems found, in charge of the leadership on-site organization to formulate rectification plan, in accordance with the principle of "four fixed" rectification within a time limit.

Do a good job in the construction of double-base work with intransitive verbs: clearly stipulate that the party branch secretary is responsible for the work records of party affairs and trade unions, and the vice captain in charge of safety is responsible for the safety management records. Every half month, the work department of the Party Committee (* * * Youth League Committee), the trade union and the production technology department will participate in a comprehensive inspection of the double-base work of the mining team. If the records are incomplete or irregular, the relevant personnel will be seriously investigated for responsibility.

Seven, continue to pay special attention to the training of all staff, especially the skills training of blasting workers and tile maintenance personnel.

I recommend it carefully.