The prelude to comprehensive construction, internal work handover. The account manager needs the assistance and cooperation of the owner when he starts to handle the property and related formalities.
commencement
The project was officially launched. Shang Ceng will hold a solemn and simple foundation laying ceremony for this purpose, which requires the owner to make a good start.
Tell sb. his true intentions
The construction personnel shall implement the defense line on site according to the construction drawings, and at the same time, the basic materials shall enter the site, which requires the owner to confirm the defense line achievements on site and conduct material acceptance.
Equipment and civil engineering reconstruction construction stage
Some equipment, such as central air conditioning system, must be installed at the initial stage of the project. At the same time, in order to ensure the smooth handover in the later period, the owner needs to determine the main materials such as cabinets, special sanitary ware, kitchen and bathroom walls and tiles at this stage.
Hydropower construction stage
Concealed works such as waterways and circuits began to be constructed.
Concealed engineering acceptance
The acceptance of concealed works such as waterways and circuits requires the owner's personal participation, and at the same time, the owner and the project manager need to jointly confirm the concealed quantities.
Medium-term construction stage
Large-scale engineering construction began. The foundation of carpenters and bricklayers will start construction. There will be several site meetings at this stage, and the project manager will inform the owner in advance to attend.
Temporary acceptance
Doors and windows, fine wood and white stubble products are basically completed, and the project is basically over half. Need the owner to participate in the acceptance and confirmation of the engineering quantity, go through the formalities of adding or subtracting the project, and pay the interim payment; Owners also need to start to determine the main materials such as sanitary ware, floor, stairs, wallpaper and lamps.
Late stage of construction
Oil workers started construction. At this stage, the owners need to attend on-site meetings and sign furniture and accessories contracts one after another.
Final acceptance of construction
When all construction projects are completed, the company personnel will conduct a comprehensive acceptance with the owner. After the acceptance, they will pay the final payment and go through the warranty procedures.