Current location - Education and Training Encyclopedia - Graduation thesis - Model essay on personal work summary of civil engineers
Model essay on personal work summary of civil engineers
Did you get anything from working for a while? As a person in the workplace, we must form a good habit of summing up our work. The following is a summary essay of personal work of civil engineers compiled by me for your reference only. Welcome to reading.

Summary of Personal Work of Civil Engineering Teachers (1) I graduated from xx Institute of Technology with a bachelor's degree in civil engineering, and have been engaged in construction work in xxxx Engineering Co., Ltd. since 20xx. After working for ten years, I worked diligently in business and technology, and gradually grew from an ordinary technician to the director of engineering department, technical supervisor and deputy project manager. In the meantime, I have tasted the ups and downs of building construction and accumulated rich experience in building construction through tempering. I have strong feelings for building construction, which has strengthened my belief and determination to engage in building construction all my life.

I. participation in education and training

After obtaining the qualification of assistant engineer, I actively participated in the education and training of modern professional ethics and general ability, office automation and so on organized by the Municipal Personnel Bureau, and successfully passed the relevant examinations organized by the Municipal Personnel Bureau. In addition, I actively strengthen the study of related skills in professional fields. While participating in the internal training and study of the unit, I participated in the building-related skills training organized by xx Vocational and Technical School of Architecture, xx Vocational and Technical College of Architecture, xx Civil Engineering College and other institutions.

Second, the main work performance and rewards

(1) Strengthen political and professional study and strive to improve their own quality.

Society is a university. After I took up my post, I combined theory with practice, and on the basis of mastering new technology, new knowledge, new standards and new norms in time, I applied the technology I learned to practical work according to the needs of my work. When encountering problems, actively consult the information and humbly consult the old comrades of the unit. With the help of the old employees, the business ability has been greatly improved step by step. In terms of political thought, we should keep abreast of domestic and international situations and current political news, actively study socialist theoretical systems such as "Theory of Three Represents", "socialist concept of honor and disgrace" and "Scientific Outlook on Development", pay attention to our own ideological construction, and constantly improve our political quality. In the work, words and deeds are consistent, the style is correct, seeking truth from facts, being strict with self-discipline, daring to fight against violations, daring to carry out criticism and self-criticism, uniting comrades and respecting leaders. Adhere to the principle that personal interests are subordinate to the interests of the company, regardless of personal fame and fortune, maintain a healthy mentality, be proactive and optimistic, and have full confidence in the future of the construction industry and the company.

(two) based on their posts, try to do their job.

I have worked for more than ten years and participated in the construction of several projects such as xx Community, xx Community and xxxx International Plaza. Starting from the first residential area in the county, we witnessed the development and urban changes of xx as a builder.

Building xx International Plaza 15# is an annual key project in xx County. During the project construction, as the deputy project manager, I assisted the project manager to be fully responsible for the technical and construction management. In the process of construction, from the formulation of organizational plan to the preparation of technical site, from the matching of water, electricity and living facilities to the entry of materials, from the organization of construction to the filing of materials, I have done every link and work in a meticulous and orderly manner. At the same time, give full play to professional expertise, reasonably plan the construction period, accurately formulate the resource plan, determine the construction plan, and actively promote the application of new technologies, new processes and new materials. Due to strict quality control, reasonable schedule and cost management, the quality, safety and construction period of the project were completed in strict accordance with the contract requirements, and it was rated as Suqian civilized project.

The project of building xx6 can be said to be a difficult project taken over by our company. There are three schools around the project: county bilingual school, county bilingual kindergarten and county experimental primary school north campus. The construction site is narrow, the construction is difficult and the security risks are great. As the technical director of the project, I made continuous progress in the construction, studied hard, actively assisted on-site construction personnel to solve various technical problems encountered in the construction process, and organized the construction in strict accordance with the company's quality, environment and occupational health and safety management procedures. In order to ensure that students have a quiet learning environment, I revised the construction plan in time and put some noisy work at night or at night. Nevertheless, the quality, safety and construction period of the project were completed in strict accordance with the contract requirements, and no safety accidents occurred during the construction period spanning nearly one year, which won unanimous praise from the school, parents and owners, and also won a good reputation and reputation for the company and established a good social image.

Because of his excellent work, he was rated as an advanced individual of the year for three consecutive years, and he was rated as excellent for four years since he served as an assistant engineer for five years. He has successively won honorary titles such as honorary teacher of xx secondary specialized school in xx county, outstanding correspondent in xx county, advanced worker in xx county and advanced worker in engineering quality management in XX province. The project I presided over, "Improving the formwork support technology of beam-column joints and improving the finished product rate of concrete forming", won the Excellent Achievement Award of Suqian Excellent Quality Management Group of Engineering Construction in xx years; The project "Improving the Construction Quality of Electrical Piping" won the Achievement Award of Excellent Quality Management Team in Suqian City in xx years.

(3) Play a leading role and actively cultivate new people.

In my work, I set an example, strive for perfection in everything, pay special attention to the education of newcomers, always set an example for new jobs, give technical guidance, actively help them solve various difficulties in their work and life, and teach them how to apply what they have learned to engineering practice. In order to effectively solve the problem of insufficient human resources in enterprises, under my proposal, the company holds a technical symposium for new and old employees every two months to discuss various problems encountered in the work and exchange some good experiences and practices, thus creating a good atmosphere of "everyone attaches importance to technical work and everyone cares about the growth of new employees" in the whole enterprise. In addition, the unit also signed an agency teaching agreement with xxxx* Vocational and Technical School. I and other three engineering and technical personnel have served as construction engineering instructors in xx Vocational and Technical School all the year round, and have trained more than 200 engineering and technical students for xx Vocational and Technical School. As the practice base of xx school, this unit enjoys the priority to admit outstanding students, which not only solves the problem of lack of technical talents in the unit, but also injects new vitality into the education and teaching of xx school.

Third, papers, treatises and other works

In the process of construction, I pay attention to summing up experience and be good at thinking when encountering problems. Through continuous study and work practice, my professional quality and ability have been further improved and strengthened, and I have completed and published many papers in journals above the provincial level. The paper "The Role of Feasibility Study in Project Construction" was published in the national publication "Modern Education Research". Because of its national promotion significance, it was preserved by the national excellent discussion library of this journal and issued a certificate. The paper "Reflections on Technical Supervision under the New Situation" was published in the provincial journal xx Times and obtained a certificate.

Summary of Personal Work of Civil Engineering Teachers (2) 20xx is coming to an end. Looking back on the work of the past year and summing up the gains and losses of the year, I feel a lot. Over the past year, I have been keen on my work, being strict with myself, keeping my job in order, and always maintaining the attitude of "modesty", "caution" and "self-discipline". With the care and training of leaders and the help and support of colleagues, I always study hard, make positive progress, strive to improve myself, complete my tasks seriously and perform my duties well. As a hardware engineer, in my heart, Shaanxi Derong is my home, my leaders are my parents, my colleagues are my brothers and sisters, and Derong's business is my own business. I will make the company's projects perfect through my unremitting efforts, and let our products from Shaanxi Derong be introduced to the market as soon as possible. I understand my responsibilities and obligations as a xx hardware engineer. Looking back on the past year, I summarized the following work:

I. Annual Work Situation

In the past year, I gradually grew from being familiar with the company's projects to being able to undertake some modules of the company's projects, and made due contributions to the company in these aspects. My personal ability has also been improved accordingly. However, the company's projects are more complicated and there are still many things to learn, so I will continue to work hard to understand the details and difficulties in the project more deeply, hoping to see the perfect birth of the products through my own efforts.

During this year, I mainly completed the following work:

1. On the basis of 20XX years, the indicators of radio stations are refined and studied. According to the suggestion of Deng Gong and the index of civil aviation, this paper summarizes our own radio test methods, carries out a detailed test on our radio station, and evaluates the performance of the radio station according to the test records.

2. According to the tracking test of the radio station, the problems existing in the radio station are sorted out one after another, and the corresponding parameters of each module are modified. Then, the schematic diagram of each module is modified, and the solutions are put forward for the fractional frequency division problem of transmitter frequency combination and the large harmonic problem of transmitter.

3. It took a month and a half to integrate and modify the system schematic diagram of the whole radio station, and at the same time, it made clear the meaning of various signals of the whole radio station, which laid the foundation for later research and development and testing.

4. According to the test data of the transmitter, the transmitter is evaluated, and some problems such as unstable power, inaccuracy, modulation drift, large distortion and PTT timeout are put forward. And then cooperate with Xigong University to solve the related problems of transmitter. During the cooperation, the problems such as power stability, modulation drift and PTT timeout were solved. By solving these problems, we also summed up a set of methods and formulas, which solved the related problems of the transmitter more deeply and laid the foundation for the subsequent debugging and production of the transmitter.

5. Further efforts should be made to solve the problems of large distortion and large harmonics left by the transmitter. Try to make MOD voltage generating circuit, narrow the scope of troubleshooting, try to use custom filter to reduce harmonics, modify power amplifier parameters and solve problems. Although the problem has not been well solved, we have also found the direction from it. I think if we continue to work in this direction, these problems will be solved.

6. Start to participate in the discussion and research of new schemes. Firstly, the modulation board is used to reduce the useless signal lines of the modulation board, and the DSP serial port protocol is used to communicate with ARM. Then the power board, which integrates the original separate power board and rectifier board, reduces the number of connecting wires and increases the heat dissipation area; Then the improvement of ARM, according to the newly purchased ARM model, makes an effective isolation scheme and changes the original power supply mode; According to the new requirements of radio station, the fractional frequency division function is added to the frequency synthesizer, so the frequency synthesizer adopts ADF435 1 PLL design.

7. Draw PCB boards of power board, modulation board and ARM adapter board, participate in the discussion of interface modes of each board, and weld ingredients for PCB boards.

8. The company's new project, Digital Radio, made a test tool for digital radio, planned the preliminary research and development scheme of digital radio, conducted three outdoor tests and evaluated digital radio. Although this project has not been carried out, I have learned a lot myself through this project and felt the motivation of the company's development.

9. Test the modulation board, ARM adapter board and power board on the single board, and then weld the shielding frame. During welding and installation, some structures were modified and improved. Finally, the function test is carried out, and the new modulation board, power board and ARM adapter board are debugged.

10, Fudan project, mainly made the following points: 1) First, get familiar with the basic situation of the project, and start designing voltage sampling circuits to determine the types of resistors; 2) With the progress of the project, the manufacturing resistor and the basic circuit form are finally determined; 3) Then determine the size of the cabinet and the manufacturer according to the size of the resistor, and design and process the bus; 4) Submit the project to Shanghai for evaluation, and repair the installation size and bus installation mode in the cabinet again according to the evaluation results.

165438+

Second, work experience

I have been in the company for more than a year. From the initial understanding of the project, to being familiar with the working principle of each module, and then to undertaking the research and development of modules in the project alone, I saw that I was growing, progressing and maturing. At work, I also realize the importance of cooperation. Our radio system is very complicated, and each of us is a part of it, so our cooperation is very important.

Third, shortcomings in the work.

After a year's work and study, I also found that my deeper understanding of the project is not enough, and my ability to solve complex problems is not enough. This is where I constantly hone and improve myself in my work. To sum up in detail, during my one-year work, I did not do well in the following aspects:

1. I am not proficient in the professional technology of the work, and I have not found a solution to the transmitter distortion problem. I should strengthen my study in this field and provide guidance for my future work.

2. The working environment is not clean enough, the experimental platform is not neat enough, and the instruments are not in place. I hope to restrain myself from putting things back in the future and form good habits. Habit determines success or failure, and good work habits will actively promote our work.

3. I didn't sum up my work in place, and I didn't actively sum up my gains and losses in my work, which led to falling down twice in the same place. I hope to strengthen this aspect in the future.

Summary of Personal Work of Civil Engineer (III) This year is my second full year as an office worker. Civil engineer is my first job and a starting point of my career. I also cherish it and try to adapt to this position. Through a year of continuous study, with the help of my colleagues and leaders, I have completely integrated into the big family of xx, and my personal work ability has been obviously improved. Although there are still some shortcomings in my work, it should be said that I have paid a lot and gained a lot in the past year, and I feel that I have gradually grown up. The work in xx years is summarized as follows:

1. Through unremitting efforts over the past year, I have completed the work of sorting out and handing over the construction data of the first and second phases, the landscape greening of the second phase, the preparatory work for the early commencement of xxx Group, the model house project of X Group and other tasks entrusted by company leaders.

1, collation and handover of construction data of Phase I and Phase II projects

In the first half of this year, the second phase of the project was successfully delivered to the owner. Before the handover of the project, the construction data must be sorted out and handed over. I carefully checked and consulted the construction materials of each building, and made every effort to ensure no leakage, no shortage, neat catalogue and complete information. Before handing over the second phase of the project, I will prepare all the floor plans, warranty certificates and instructions for use of Building 13 in advance, and fully guarantee the owner when handing over the house. All the filing materials of Building No.2 13 were sorted by myself, and all the sorting work was successfully completed before the handover under the guidance of the leaders. After the delivery of the house, due to the excessive and important information, it needs to be handed over to the company's archives for safekeeping. At the time of handover, I will rearrange more than 100 boxes of data of 30 buildings in Phase I and Phase II, so that each one is recorded, and any information can be found in a directory. During the period, I spent a lot of energy and nearly a month, and finally I didn't live up to the leadership's entrustment. All the materials have been rearranged

2. Landscape greening project of Phase II project

At the beginning of the year, I took over the landscape greening work of the second phase project. Compared with modern residential areas, the proportion of landscaping work is very small, but it is of great significance. It is indispensable for modern new living areas. Due to full preparation, the second phase of landscape greening is progressing smoothly.

However, in the later acceptance process, the change of seedling size brought great trouble to our acceptance work. Finally, I cooperated with the technical department to check the types, quantities and specifications of all seedlings in place. Finally successfully completed the work entrusted by the leaders.

3.xxxx project

At the beginning of September, I received instructions from the leader. It is necessary to set up a model house for C, which is a microcosm of the wise decision of the company leaders to start xx Group and set up this new apartment in the case of the national real estate recession in 20XX. Its quality directly affects the sales performance after the opening of three-dimensional superposition, and it is also a new measure of the company after the sales situation of Group B is not optimistic this year. Its success or failure directly affects the success or failure of the company this year.

After receiving the instructions from the leader, I quickly threw myself into practical work. In order to achieve the expected effect, I positioned and paid off three times in two days, and finally achieved the expected effect of the leader. In the process of construction, I am not afraid of hard work, work hard and strive to get to work on the spot. After work, I need to work overtime many times because of the project. Later, due to the intervention of decoration companies, this requires good coordination and organizational skills. Try to deal with the friction and contradiction between the two sides in the construction process. Finally, the model house project was successfully completed before the opening. It has made due contributions to the company's impressive sales performance and turning losses into profits after opening.

After the successful opening of X, I cooperated with the technical department. Participated in the final accounts of the later model houses.

Second, the past year's work experience

1, keep a good attitude and a positive working attitude. As a member of "xx", I consciously abide by the company's rules and regulations and obey the work arrangements of my superiors. With absolute loyalty to the company, put into all the work, take the company's business as your own, and actively think about site construction management and coordination according to the actual situation on site, instead of waiting for the leader to arrange it. Invest in all work as a master, and maintain the company's image and interests from being damaged.

2. Integrate yourself into the company, and rely on the collective wisdom and strength to complete all the work. In many of the work I have completed this year, I have received support and help from leaders and colleagues at all levels.

3. After one year's work, I found that I still have many shortcomings: I don't have enough management in dealing with on-site affairs at work; I have been careless in dealing with these problems. In the new year of 20XX, I will pay more attention to overcoming these problems.

20xx is a year of exploration, learning and progress for me. Faced with different work contents, I put my mind right, give full play to the initiative of my supervisor and think positively. In such a year, I enriched myself through my own labor and broadened my horizons through the opportunities given to me by my leaders.

Summary of Personal Work of Civil Engineer (IV) I have been in the company for almost half a year. With the strong leadership and care and support of the company leaders, I have made great progress in 20xx. In the course of my work, I successfully completed the annual work target of 20xx. 20XX's personal work is summarized as follows:

I. Annual Work Situation

1, familiar with the rules and regulations of the company.

I joined the company in 20xx 10. In order to integrate into the company team faster and better and lay a good foundation for future work, I stepped up my understanding of the company's rules and regulations and became familiar with the company's corporate culture. Through understanding and familiarity, I am proud to join the company's team, but I also feel my own pressure. In the future work, I will take the company's rules and regulations as the criterion, be strict with myself, be honest and self-disciplined, dare to innovate while adhering to the principles, and complete the task faster and better.

2. Be familiar with the structure and site conditions of the project.

As a civil engineer, being familiar with and understanding the site is quite beneficial to the future work. In order to better carry out the work in the future, I went to the scene many times to get a deeper understanding of the layout of the scene. After mastering the first-hand field data, I consulted the relevant technical data, studied the structure of the project, analyzed the difficulties and difficulties in the future construction, and analyzed the basic forms of the project. Through research and analysis, the actual situation of project construction management is objectively predicted, which provides a reliable basis for the next step of planning.

3. Participate in the modification of the management system of the engineering department.

In order to facilitate the management of the engineering department in the future, I combined the requirements of the company and the actual situation of the engineering department, referred to the relevant systems of well-known real estate enterprises such as ABO, and compiled and revised various rules and regulations of the engineering management of the engineering department. The establishment of this system is conducive to clarifying the responsibilities of each post and providing guarantee for project management. Through this compilation, I have a further understanding of other majors in project development, and it also makes my next work clearer.

4. Analyze the weather in 20xx.

In order to complete the company's project development task in 20xx, and make scientific and practical work contents and project construction progress plan in 20xx, I analyzed the weather situation in 20xx, and combined with the perennial weather situation in Wuzhi County, predicted the weather in 20xx. At the same time, I combine the weather conditions and the progress of the project, make reasonable adjustments to the progress of the project, grasp the construction season, avoid large-scale construction in the rainy season, and prepare for the rainy season and high temperature.

Second, the existing shortcomings and improvement measures

20xx is about to die with the wind. Looking back on my work in the company in the past six months, although the workload is relatively large, there are not many highlights, and many jobs are still unsatisfactory. To sum up, the shortcomings mainly include the following points:

1, lack of communication, unable to make full use of resources.

In the process of work, because I am not familiar with other majors, and because of my face, I don't take the initiative to ask other colleagues, which leads to reduced work efficiency or even mistakes, and I can't make full use of superior resources. As the saying goes, "Three people must have a teacher". In the future work, I will actively strengthen communication with colleagues in other departments, share resources through the company's platform, and improve my business level.

2. Lack of planning

In the process of work, especially in the construction stage of project development, due to the lack of planning, the purpose of work is not clear enough, and the contradiction between primary and secondary is unclear, which often achieves twice the result with half the effort. The leader is dissatisfied or full of grievances. In the future work process, I will make a work plan carefully, strengthen my understanding of the purpose, distinguish between primary and secondary contradictions, and strive to get twice the result with half the effort.

3. The major is narrow.

As a modern talent, he should be versatile, so that talents can meet the needs of the times and the company. My professional field is narrow, and I don't know enough about other real estate majors, especially marketing planning and laws and regulations, which limit my own development. In the future work process, I will strengthen the study of other majors, make full use of the company's resources, improve subjective initiative, and strive to become a multi-functional and compound talent.