Quality management summary is referred to as 20XX years. With the help of the company's leaders and all members, I closely focused on the warehousing of finished products, gave full play to my post functions, constantly improved my working methods and improved my work efficiency, and successfully completed various tasks.
First, a year's work summary
(1) Grasp learning and constantly improve their own quality.
Strengthen ideological and political study and professional knowledge to improve political quality. Mainly study the company's related spirit, material management, computer operation, enterprise management and other knowledge to continuously improve their own quality.
(2) Strengthen work functions and do a good job in finished product management.
1, mainly responsible for the management of finished products of sand, aluminum and granules. I can be strict with myself in my work to ensure the accuracy of warehousing, warehousing and picking data.
2, during the shift, carefully coordinate warehousing, timely and accurate warehousing.
3, material distribution, can seriously implement the provisions of the material distribution, dare to adhere to the principle of selflessness, to ensure the accuracy of the finished product distribution.
4, report production, class four in addition to improve the transmission efficiency, but also carefully collect data, reasonable preparation, with their own ability to provide the most accurate data for the leadership.
5. Do a good job in warehouse management, clean the warehouse as much as possible, remove the bad packaging bags in time, organize the warehouse according to the situation, and actively carry out 5S management.
Second, the existing problems and the work plan for next year
Say goodbye to the old and welcome the new. While summing up this year's work, we should also correct our attitude and strive to overcome the problems of impatience and bad style in our work. I also put forward some preliminary ideas for next year's work. First, continue to strengthen theoretical study and firmly establish the concept of "service first". Second, continue to strengthen business learning, actively strive to participate in various training courses, become business experts, improve work efficiency, and make work to a new level. Thirdly, in accounting, I will try my best to learn computers and make full preparations for network management such as enterprise resource planning (ERP) in the future.
Facing the expectations of leaders and colleagues, I am full of confidence. I believe that with the leadership of director XXX and the help of comrades, the finished product team will certainly do better and truly become a finished product keeper.
Third, there are still some problems in finished product management.
1. The management of the labor force needs to be further strengthened. The uncertainty of its personnel and extensive working methods have brought extremely backward unfavorable factors to the quality of finished products and delivery efficiency.
2. The market information collection is not detailed enough. For example, in the case of silicon delivery, certain customer requirements should be provided for reasonable storage in case of uncontrollable unqualified products.
3. The quality awareness of relevant departments is not strong enough, and it even smells of compromise. How can we turn a blind eye to unqualified products? There is no reasonable relevant system, which is limited to simple unqualified applications.
4. Inadequate management of purchased materials. So far, there is no set of quality indicators for acceptance, which indicators should be accepted and which indicators should not be accepted, which can not be clear at a glance, which brings certain hidden dangers to the use and return of materials. I hope that it will not add too many hazy meanings to the purchased materials.
I hope the above problems can attract relevant attention. Difficulties are stumbling blocks and the cornerstone of progress. While trying to carry forward the advantages, we should learn to improve the shortcomings and be brave after knowing the shame. I believe that with the joint efforts of all of you, the finished product management will be completely new.
Summary of Quality Management In 20xx, the quality and safety supervision station of water conservancy project construction in our city, under the direct leadership of the bureau party group, under the business guidance of the provincial quality supervision center station, and with the strong support and cooperation of the brother departments, conscientiously implemented the regulations of the Ministry and the province on quality management of water conservancy projects, earnestly performed the government's function of quality supervision of water conservancy projects, earnestly grasped the quality supervision and management of water conservancy projects in the whole city, and completed all the objectives and tasks formulated at the beginning of the year. The work of this year is summarized as follows:
First, the unit's own construction
There are people in our station, there are (posts) people and (posts) people. Quality supervision is an important part of quality management, and the construction of quality supervision team is the key to improve the quality supervision and management level of water conservancy projects. Water conservancy project quality supervision is a professional, technical, policy and practical work.
Therefore, our station attaches great importance to the training and education of quality supervisors. On the basis of self-study, we often organize everyone to study the laws, regulations and technical standards of the state, the Ministry of Water Resources and the province on project quality management. Organize relevant personnel to participate in the qualification certification training course for quality supervisors of water conservancy projects in the province.
In the daily quality supervision work, every quality supervisor can often go deep into the construction site, be familiar with the construction technology and quality inspection methods of the project, adhere to principles, handle affairs impartially, and maintain a diligent and honest work style. Over the past year, we have conscientiously implemented the provisions of the responsibility book for building a clean and honest party style, and conscientiously implemented the "Regulations on Honesty and Self-discipline of Cadres" formulated by the Party Group of the Bureau. No violation of laws and regulations occurred, and a good image of administrative law enforcement personnel was established.
Second, the quality supervision and management
In the process of engineering quality supervision, our station mainly works from the following aspects:
1, strictly implement quality supervision procedures.
In the process of quality supervision, strictly implement the "Provincial Water Conservancy Project Quality Supervision Procedure". First, before the project starts, go through the quality supervision procedures in time and sign the "Water Conservancy Project Quality Supervision Book"; Second, after the project starts, the project division and examination and approval procedures should be handled in time to clarify the main branches and key parts of the project; Third, in the process of project implementation, in case of project division adjustment and major design changes, it must be reported to the quality supervision station for the record; Fourth, at all stages of project implementation, the quality grade should be verified in time.
2, strengthen the supervision and inspection of quality behavior.
In the past, quality supervision often focused on the quality supervision of engineering entities, but neglected the supervision of quality behavior of all parties in the project. According to "Regulations on Quality Management of Construction Projects" and "Regulations on Quality Supervision and Management of Water Conservancy Projects" of the Ministry and the province, under the supervision of the physical quality of the project, check the quality management system of the project legal person, the quality control system of the supervision unit and the quality assurance system of the construction unit, focusing on the positions of chief supervision engineer, project manager, technical director and final inspection engineer; Check the implementation of "Mandatory Provisions of Engineering Construction Standards" (part of water conservancy projects) by construction enterprises; Check the supervision unit's implementation of the Code for Supervision of Construction Projects in the process of construction supervision, and carry out on-site supervision, witness sampling and supervision personnel holding certificates; Check the construction unit, supervision unit and construction unit's inspection and evaluation of project quality.
3, strictly grasp the quality standards, do a good job of quality evaluation.
Carry out the principle of "supervision, assistance and promotion" and guide all contractors to do a good job in engineering quality evaluation. Through the spot check of the construction, supervision and construction unit's engineering technical data and the spot check of the project's physical quality, check and verify whether the construction unit and supervision unit strictly implement the engineering quality evaluation standards during the self-evaluation and re-evaluation of the project quality, and insist on rectification when finding quality problems or defects. In the spot check of engineering quality, it is necessary to check whether the self-inspection of the construction unit meets the requirements and whether the supervision unit has a certain number of parallel inspections.
The appearance quality of water conservancy projects is not only the image of the contractors, but also the image of our water conservancy industry. Therefore, in the work, we require all contractors to strengthen the internal quality management and external quality management of the project. Strictly grasp the standards in quality evaluation. If the appearance quality can't meet the specified requirements, the engineering quality can't be rated as excellent grade.
4. Comprehensively carry out supervision and spot check on the construction quality of projects under construction.
I have visited the construction site many times to conduct supervision and spot checks on the supervised water conservancy projects. On the basis of the general self-examination of the contractors, according to the scoring method for quality inspection of water conservancy projects, and on the basis of on-site inspection and data review, the projects are scored one by one. In view of the problems existing in the inspection, put forward opinions on the spot and make rectification within a time limit, so that the found quality defects and quality hidden dangers can be dealt with promptly and effectively, and the whole project under construction is always under control.
Third, supervise the project.
In 20xx, the quality supervision coverage rate of water conservancy projects in our city (excluding wading projects in other industries) reached 100%, and there were * * * water conservancy projects under supervision in the city. Among them, our bureau implemented 20 water conservancy projects, of which 20 were completed and 20 were accepted; The unit project has been accepted; A number of sub-projects passed the acceptance, of which 10 was excellent, and the excellent rate of sub-projects was%.
IV. Next Work Plan
The quality of water conservancy projects is directly related to the safety of life and property of the country and people. Looking back on the quality management work in the past year, although some achievements have been made, there are still many shortcomings. Next, we plan to further improve the quality supervision of water conservancy projects from the following aspects:
First, raise awareness, increase publicity, and firmly establish the consciousness that quality is life.
The second is to further strengthen quality supervision and management, establish and improve the quality supervision and management network, and establish and improve the quality supervision and restriction mechanism.
The third is to further strengthen the quality supervision and sampling inspection of the supervised projects, strengthen the inspection of parallel inspections, and ensure the authority of quality supervision.
The fourth is to further strengthen the technical training of quality supervision personnel, improve the technical level and ensure the quality of quality supervision.
Quality management summary: three short hours have passed. In a blink of an eye, our printing department has crossed another year. Although there is no vigorous result, it has experienced extraordinary tests and tempering. As a grass-roots manager, there are joys and sorrows in work, and occasionally there will be a little disappointment, but more joy! Looking back on this year, I can't help but meditate and summarize the work of this year.
As a personal experience, our printing department has made some achievements through continuous efforts from preparation to now, and the following points are more prominent:
First, team management.
Although team management has been strengthened, there are still some problems.
For example, the standardized operation of employees needs to be improved; The professional and technical level of employees needs to be improved; The enthusiasm of employees has not been fully mobilized. Without high-level management, there will be no high-quality employees and no high-quality products. Therefore, in the future work, efforts should be made to solve the problem of improving the comprehensive quality of employees, strengthen the training of job skills and professional and technical knowledge, and strive to greatly improve the work skills of employees in a short time. At the same time, organize team members to study the work content collectively and share their work experience.
Second, quality control.
Quality is produced, not checked, that is to say, total quality management should be emphasized, and every link and every working procedure should be carefully grasped according to the target requirements. At the same time, quality inspection is very important, especially in the production process, which can effectively avoid quality problems, change post-treatment into pre-prevention and process control, and change passivity into initiative. Although the company has always attached great importance to quality from top to bottom, there are still many problems in the actual operation process, especially the first process is very important. Once the first process goes wrong, it is difficult to guarantee the quality of the subsequent processes, thus delaying the cycle. I think to do a good job in quality work, we must grasp the principle of "strictness, detail and practicality", strictly manage and be meticulous, and pay close attention to implementation. Since its establishment, our printing department has taken product quality as the management of production line and promulgated a series of quality management regulations. Due to the lack of enforcement by various departments, many quality problems have been exposed.
Quality is the life of an enterprise. In order to further improve the quality awareness of the production line staff and effectively ensure the quality of the plate bending machine in the workshop, employees should be organized to carry out the training of "quality system" documents and production skills and process standards. Explain its necessity and importance to employees, especially the personnel in key and important processes should strictly control the quality of the plate bender according to the requirements of process documents and the quality control measures formulated by the workshop, so as to prevent the defective plate bender from flowing into the next process and make the quality level of each department by going up one flight of stairs.
Personally, from an ordinary employee to production scheduling, there are still many shortcomings in this year's work, and many problems are not mature enough. Need to learn and improve in the future. I hope to make persistent efforts on the original basis, seriously improve my professional skills and make contributions to the development of the company and the workshop.
Therefore, the following points are the key development directions:
1. Strengthen study and broaden knowledge. Study printing professional knowledge and related management knowledge hard;
Based on the principle of seeking truth from facts, we should report the situation to the next higher level. Really be the assistant of the leader;
3. Complete all tasks assigned by superiors, increasing day by day;
Finally, I would like to thank all the leaders for their help and colleagues for their cooperation in my work. In the new year, I will make persistent efforts to upgrade my ability to a higher level and do my work well. thank you