Annual Work Summary (1) In this year, under the leadership of the Municipal Water Conservancy Society, I worked actively, pioneered and innovated, faithfully served the water conservancy construction and water conservancy economic development, and made certain achievements in promoting the healthy and sustainable development of the ecological water network. The main work in the past 20 years is summarized as follows:
First, fine management is carried out to maximize the benefits of ecological water network projects.
My office is mainly responsible for the management and operation of the city's ecological water network project. In order to scientifically dispatch water sources and ensure the safe operation of the ecological water network, especially in view of the serious shortage of above-ground water storage in the city this year, we have carefully formulated plans and plans, implemented strict dispatching, organized personnel to check at any time, and better controlled the water level of water control projects and channels; Strictly and scientifically dispatch urban water sources to ensure a good and safe water supply order.
This year is the most severe year since the operation of ecological water network, and the water source is the most tense period. The water storage capacity of Yuecheng and Dongwushi reservoirs is only 54 million m3 and 48.4 million m3 respectively, and the water shortage is more serious than once in 20 years. In order to ensure the normal operation of the ecological water network and ensure the safety of industrial and agricultural production in the city, the whole department has established the concept of "water is more expensive than oil and cannot be wasted", carefully dispatching and scientific management. In addition to the peak period of agricultural irrigation, Fuyang River water system has always adhered to high water level and low flow, even running near the warning water level. Second, in order to make good use of rain and flood resources, give full play to the role of Zhangzhuang Bridge, Lianhuakou and other sluice and culvert hubs along the river, and adopt flexible dispatching means to intercept and store water sources one after another and make effective use of them. Third, in view of the serious drought situation, extensive publicity was carried out to ask the masses to change the planting structure and sow more drought-resistant crops. In the whole year, the water network irrigated 6.5438+0.35 million mu of farmland, of which 504.5 million mu and 680,000 mu were irrigated by the main canal and branch canal under control, which contributed to ensuring the city's agricultural harvest.
Two, actively organize cadres and workers to participate in various learning and training, improve the technical level.
Actively organize the relevant cadres and workers of the whole institute to participate in various professional business training courses organized by higher authorities, and participate in various trainings such as accounting, accountants, legal representatives and personnel. , to carry out water transfer, water use, water management and other aspects of learning and training. Through the form of office meetings and office plenary meetings. The cadres and workers of the department also participated in the study of hydrology, water resources and accounting through self-study and correspondence, and combined with the hydrological testing training of Zhang Weinan of the Ocean Commission, carried out special training on hydrological measurement. Through systematic study, the political quality and professional quality of grass-roots water conservancy workers have been comprehensively improved, and their practical work ability has been enhanced, which has laid a certain theoretical foundation for water conservancy construction and management to reach a new level in the new period.
Three, strengthen the technical foundation and innovative management, and promote the scientific management of water network.
While strengthening the management of ecological water network project, we should actively do a good job in popular science propaganda, guide agricultural irrigation and water fee collection during the most tense period of agricultural irrigation, strengthen water-saving propaganda, and encourage counties to use new water-saving technologies and equipment to maximize the benefits of limited water resources.
At the same time, we should change our thinking in time, start with the work of ecological water network, innovate management concepts, guide and help counties to do a good job in the water landscape construction of county towns, especially give full guidance and support in concept and technology, and give the water source the greatest satisfaction in the critical period, focusing on guiding Linzhang County to complete the water surface construction of Qizi Lake, Cheng 'an County to complete the water landscape construction around the city, and Jize County to complete the water landscape construction of Maosui Park, which greatly improved the urban environment.
Actively organize members to write academic papers and study scientific and technological innovation. This year, "Ideas and Measures for Comprehensive Management and Construction of Fuyang River in Handan City" written by our office was published in "Water Conservancy Science and Engineering Technology" sponsored by Hebei Water Conservancy Society. Combined with my own work, I have compiled an ecological water network management manual from the aspects of water source engineering, irrigation area engineering, water storage engineering, drainage engineering, water metering engineering and dispatching management, so as to prepare for the future.
In 20__ _, under the leadership of the Municipal Water Conservancy Society, combined with the Twelfth Five-Year Plan, in view of the implementation of projects such as diverting water from the Yellow River to the Han River and transferring water from South to North, hundreds of millions of cubic meters of water will be added in our city. In-depth study will be made on how to effectively dispatch and manage water to benefit the people of the city, do a good job in water transfer, and give full play to the maximum role of ecological water network.
I have been studying Marxism-Leninism and Mao Zedong Thought, deeply understanding Comrade Deng Xiaoping's theory of building Socialism with Chinese characteristics, adhering to the four cardinal principles of the Party, supporting the leadership of the Central Committee, the socialist system, the policy of reform and opening up, loving the water conservancy cause, and being full of affection for the unit I serve. Pay attention to their own ideological construction, constantly improve their political quality, match words with deeds in their work, have a correct style of work and seek truth from facts. Be strict with yourself, dare to fight against violations, dare to carry out criticism and self-criticism, unite with comrades, respect leaders, successfully complete all tasks assigned by superiors, adhere to the principle that personal interests are subordinate to the interests of the unit, regardless of personal fame and fortune. Strict and meticulous work style, Excellence, diligence and pragmatism. Maintain a healthy attitude, be positive and optimistic, and have full confidence in the future of water conservancy undertakings and units.
First, pay attention to learning at work. If you can learn and master new technologies, new knowledge, new standards and new norms in time, you will apply them in your work. You will persist in studying according to your work needs, and apply the technology and application you have learned to practical work, so that your professional level can be improved, you have strong professional working ability, and you can engage in technical work in multiple positions according to your work needs and obey the arrangement of the leaders. In the construction of the three-side light seepage control project of the north main canal, as an engineering technical assistant, I was responsible for the construction and quality supervision of the distribution canal section and the arrangement of the completion data.
Second, according to the characteristics of complex engineering structure and short construction period, the reinforcement design of small reservoirs gives full play to its own professional expertise, rationally plans the construction period, accurately formulates the resource plan, determines the construction scheme, and actively promotes the application of new technologies, new processes and new materials. The project was rated as an excellent project. The construction is difficult. As the technical director of the project, I kept forging ahead in the construction process, studied hard, consulted modestly, actively assisted on-site construction personnel to solve various technical problems encountered in the construction process, thoroughly implemented ISO9002 quality system standards, and organized the construction in strict accordance with the company's quality management procedures, so that the project quality, safety and construction period were completed in strict accordance with the contract requirements. The project won many honors and awards such as Hebei Diameter Civilized Construction Site and Hebei Science and Technology Progress Award. At the same time, my professional quality and ability have been further improved and strengthened through my own study and work practice. Haitong Building Project in Shijiazhuang is located beside Zhongshan Road, the most prosperous city in Shijiazhuang, opposite to the railway station. Because it is located in the downtown area, the construction site is narrow and the construction is difficult. As the technical director of this project, I keep forging ahead in the construction process, study hard, actively assist the site construction personnel to solve various technical problems encountered in the construction process, and organize the construction in strict accordance with the company's quality, environment and occupational health and safety management procedures. Complete the quality, safety and construction period of the project in strict accordance with the contract requirements. The project won the honor of civilized construction site in Hebei province, won the praise of the owners, won a good social reputation for the company and established a good social image. At the same time, my professional quality and ability have been further improved and strengthened through my own study and work practice.
Pay attention to summing up experience in construction, and complete the exchange of papers such as Standardization and Standardization of Safety Production Materials Management, Selection of Tower Crane from a Technical Point of View, and Application Practice of Plastering Gypsum at the company's annual technical work meeting.
The above is the main technical work I have been engaged in for a year. Through learning from books, learning from practice, learning from others, plus my own analysis and thinking, I have indeed made great gains and progress. Achievements and shortcomings coexist, and experience and lessons go hand in hand. Overcome shortcomings, learn endlessly, and the road extends under your feet. I will, as always, go all out in my work, keep learning, strive for progress, improve my professional quality, exercise my working ability, sum up experience, learn from training, do my work better, serve the training and care of the unit, and contribute all my energy to the unit and the water conservancy cause.
Summary of Annual Work of Water Conservancy Individuals in 20xx (Chapter III) Under the correct leadership of the Party Committee and Administration Bureau of Water Affairs Bureau of our district, with the guidance and help of the municipal water conservancy department, the socialist concept of honor and disgrace, giving full play to the benefits of water conservancy projects, earnestly performing various functions of the unit, and with the concerted efforts of all cadres and workers, Qi Xin successfully completed various tasks and indicators assigned by superiors. This year's work is summarized and reported as follows:
(1) flood control work
Flood control work is the main function of my social benefits. According to the specific situation of "Mai Sha" and "Kanu" typhoons, this year's flood prevention preparations were made earlier, more fully and more in place than last year. We have mainly taken the following specific measures:
First, establish perseverance, overcome paralysis and luck, enhance the sense of urgency and responsibility, always tighten the string of flood control, and repeatedly educate cadres and workers, preferring to believe what is there and not believing what is not. Flood control safety is related to Songjiang's economic development, social stability and the safety of people's lives and property, so strict precautions must be taken to ensure the safety of one party;
Second, according to the forecast of meteorologists, flood control inspection should be carried out seriously and solidly. Carry out carpet inspection on 25 sets of water (pump) gates and 2 rubber dams in the whole hospital, strictly follow the inspection requirements of municipal and district water affairs bureaus before flood season, highlight key points, achieve "six misses", strictly control, reinforce dangerous situations, eradicate all kinds of hidden dangers, and ensure the normal operation of facilities and equipment;
The third is to implement the responsibility system for flood control, and set up a leading group for flood control and typhoon prevention headed by the director, making it clear that the main administrative leaders are the first responsible persons for flood control and typhoon prevention, the leaders in charge are the direct responsible persons, and the heads of various departments are the specific responsible persons;
The fourth is to further improve the flood prevention and typhoon relief system, systematically and comprehensively formulate flood prevention and typhoon prevention plans and emergency plans, and ensure that the organization and command, rescue personnel and flood prevention materials are in place, so that once all kinds of disastrous weather attacks are encountered, they can respond calmly, orderly and foolproof;
Fifth, strengthen the two-level duty system at stations and gates, adhere to the 24-hour duty at stations and gates, and ensure the smooth delivery of information, information reporting and government orders;
Sixth, set up "Five Notices" billboards at all sluices, that is, inform the boatmen of the rain, water, flood, tide and construction conditions, ensure the safety of boatmen's navigation, and ask for cooperation in flood control and typhoon prevention.
Although there has been no serious disastrous climate and no danger this year, these measures have played a positive role in defending against two typhoons, eight astronomical climaxes and the external influence of 1 1 over-warning water level, ensuring the safety of XX in flood season.
(2) Water transfer work
Water transfer is another main function of water conservancy projects in our hospital to bring social benefits into play, and it has become an extremely important perennial task of our hospital. It is our unshirkable responsibility to persistently dispatch water resources, improve the water quality in the control area, meet the requirements of society and people for water quality, promote the sustainable development of Songjiang economy, and consolidate and develop Songjiang National Water Conservancy Ecological Scenic Area. To this end, we have mainly done the following work in the water transfer work:
First, carry out the water transfer instructions of the higher authorities to the letter;
The second is to open and close the gates in time, exhaust all the leads, clearly stipulate that there should be a special person in charge of each gate, and make a record of water transfer for future investigation;
Third, all sluices are required to start the automatic detection system, so as to provide the superior with an intuitive water level and provide a true, reliable and scientific basis for further improving the water transfer scheme in the future;
Fourth, correctly handle the relationship between water transfer, flood control and ship navigation. While doing a good job of water transfer, we must also ensure flood control and ship navigation safety.
(3) Navigation fee
On the premise of ensuring navigation safety and providing quality service, it is the need of our institute to safeguard itself and ensure the normal operation of sluice, and also the need to ensure the benign operation of unit economy. There are five main navigation toll stations in our hospital, all of which have a designed navigation tonnage of100t. With the increasing tonnage of ships passing through the gate, there is a contradiction between permitted navigation and actual navigation, which may easily lead to safety problems such as hydraulic structures and ship navigation. In view of the above contradictions and problems, we have taken the following effective measures:
The first is to go deep into the scene and reasonably command and dispatch. According to the change of water level, the number and tonnage of ships in internal and external rivers, carefully arrange the ships to enter and leave the sluice;
Second, continue to carry out the license and call for entering the gate, register large-tonnage ships in Hong Kong in advance and make reasonable arrangements;
Third, since May, boat people's information cards have been handled free of charge at five major navigation toll stations such as Youdun Port.
The fourth is to coordinate the water police station and the local maritime department to carry out special rectification for many times. The main contents of the rectification include checking the ship's book, inspection book, driver's license, information card for crossing the gate and other documents, and dealing with some illegal acts.
Summary of annual work, water conservancy individual (Chapter IV) In this year, under the leadership of the Municipal Water Conservancy Society, I worked actively, pioneered and innovated, faithfully served water conservancy construction and water conservancy economic development, and made certain achievements in promoting the healthy and sustainable development of ecological water network. The main work in the past 20 years is summarized as follows:
First, fine management is carried out to maximize the benefits of ecological water network projects.
My office is mainly responsible for the management and operation of the city's ecological water network project. In order to scientifically dispatch water sources and ensure the safe operation of the ecological water network, especially in view of the serious shortage of above-ground water storage in the city this year, we have carefully formulated plans and plans, implemented strict dispatching, organized personnel to check at any time, and better controlled the water level of water control projects and channels; Strictly and scientifically dispatch urban water sources to ensure a good and safe water supply order.
This year is the most severe year since the operation of ecological water network, and the water source is the most tense period. The storage capacity of the two major reservoirs is only _ _ million m3 and _ _ million m3 respectively, and the water shortage situation is more serious than once every 20 years. In order to ensure the normal operation of the ecological water network and ensure the safety of industrial and agricultural production in the city, the whole department first established the concept of "water is more expensive than oil and cannot be wasted", carefully scheduled and scientifically managed. In addition to the peak period of agricultural irrigation, the water system has always insisted on high water level and low flow, even running near the warning water level. Second, in order to make good use of rain and flood resources, give full play to the role of sluice and culvert hub along the river, and use flexible dispatching means to block water sources one after another and make effective use of them. Third, in view of the serious drought situation, extensive publicity was carried out to ask the masses to change the planting structure and sow more drought-resistant crops. Throughout the year, the water network realized 10,000 mu of farmland irrigation, of which 10,000 mu was irrigated by the main and branch canals under control and management, and 10,000 mu was irrigated, which contributed to the city's agricultural harvest.
Two, actively organize cadres and workers to participate in various learning and training, improve the technical level.
Actively organize the relevant cadres and workers of the whole institute to participate in various professional business training courses organized by higher authorities, and participate in various trainings such as accounting, accountants, legal representatives and personnel. , to carry out water transfer, water use, water management and other aspects of learning and training. Through the form of office meetings and office plenary meetings. The cadres and workers of this department also participated in the study of hydrology, water resources and accounting through self-study and correspondence, and combined with the training of hydrological testing, carried out the special training of _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _. Through systematic study, the political quality and professional quality of grass-roots water conservancy workers have been comprehensively improved, and their practical work ability has been enhanced, which has laid a certain theoretical foundation for water conservancy construction and management to reach a new level in the new period.
Three, strengthen the technical foundation and innovative management, and promote the scientific management of water network.
While strengthening the management of ecological water network project, we should actively do a good job in popular science propaganda, guide agricultural irrigation and water fee collection during the most tense period of agricultural irrigation, strengthen water-saving propaganda, and encourage counties to use new water-saving technologies and equipment to maximize the benefits of limited water resources.
At the same time, we should change our thinking in time, start with the work of ecological water network, innovate management concepts, guide and help counties to do a good job in county water landscape construction, especially give full guidance and support in concept and technology, give the greatest satisfaction to water resources in the critical period, and focus on guiding _ _ county to complete the water surface construction of _ _ lake landscape and _ _ county to complete the water landscape construction of _ _ garden. Actively organize members to write academic papers and study scientific and technological innovation. This year, "Ideas and Measures for Comprehensive Management of _ _ River in _ _ City" written by our office was published in _ _ sponsored by _ _ Provincial Water Conservancy Society. Combined with my own work, I have compiled an ecological water network management manual from the aspects of water source engineering, irrigation area engineering, water storage engineering, drainage engineering, water metering engineering and dispatching management.
In 20__ _ _, under the leadership of the Municipal Water Conservancy Society, combined with the _ _ plan, our city will add hundreds of millions of cubic meters of water for the implementation of _ _ and other projects. In-depth study will be made on how to effectively dispatch and manage water to benefit the people of the city, do a good job in water transfer, and give full play to the maximum role of ecological water network.
Annual work summary, water conservancy individual (Chapter 5) Over the past year, under the correct leadership of the county party committee and the county government, under the specific guidance of the county water conservancy bureau, with the strong assistance of village leaders and the active efforts of all the staff of the township government, we have successfully completed all the tasks assigned by the higher authorities. In deepening the construction of farmland water conservancy infrastructure and promoting the development of water conservancy in our township, the following work has been done.
First, strengthen business study and formulate rules and regulations.
Organize water station personnel to learn water laws and regulations and the party's principles and policies, actively participate in the training organized by the county, enhance their business knowledge and improve their working ability. At the beginning of the year, a series of rules and regulations, such as various work plans, work responsibilities, and flood control duty system, were formulated, and the division of labor was clear, which laid a good theoretical foundation for the smooth development of the work.
Second, do a good job in the construction of farmland water conservancy infrastructure.
The construction of irrigation and water conservancy infrastructure is closely focused on agricultural production to solve the drinking water problem of the majority of villagers. Focusing on accelerating the adjustment of agricultural industrial structure and accelerating agricultural industrialization management, the key point is to seek a breakthrough in land circulation; Seize the opportunity, make good use of advantageous policies, and focus on building 1 10,000 mu of cornflakes, trees and alfalfa planting bases to improve the overall benefits of agricultural planting and ensure the safety of people's production and life.
Third, do a good job in flood control.
Flood control work is an important event to ensure the safety of national economy and people's lives and property, and it is also the focus of the whole water conservancy work. Before the flood season comes, the water conservancy workstation shall report the water situation to the competent leader and formulate the flood control responsibility system, so as to achieve early start, early preparation and early prevention.
1, strengthen organizational leadership
Villages are required to establish and improve leading groups for flood control work, clarify leadership responsibilities and perform their duties, so that this year's flood control work is organized and guaranteed.
2. Implement the post responsibility system for flood control.
The members of the leading group for flood control in villages and towns are responsible for their own duties and sign safety responsibility letters with village leaders. Organize township business organization personnel to often check the situation in the village, find problems and solve them in time, and report the problems that cannot be solved to the competent leaders for timely solution. At the same time, assist the villages to clean up the garbage in the flood drainage ditch in time to achieve the standard of smooth drainage in flood season.
3. Flood control on duty.
June/KLOC-0 to September 30th is the flood control period, so we should consciously abide by the duty system, stick to our posts no matter whether the weather is good or bad, fill in the duty situation of that day carefully, and provide the leaders with rain, water and disaster conditions in time to avoid missing posts.
Four, water conservancy census work
In order to further master the utilization of water resources in each village, the staff of township water conservancy station actively cooperated with the work of county water conservancy bureau, personally went to the countryside to conduct a thorough investigation in each village, carefully counted the data, and did a good job in water source regulation, river regulation, pollution interception and emission reduction. In accordance with the principle of "market-oriented, scientific planning, adapting to local conditions, and adapting trees and places", we will support the forest and fruit industry that is suitable for growth, fast growth and high efficiency, and ensure the good results of managing one place, becoming one place, receiving benefits and demonstrating one place.
Five, strengthen the publicity of water law.
Water is the lifeline of mankind, and the world is facing a water shortage crisis. In order to raise people's awareness of water conservation and carry out water law publicity activities smoothly, banners and posters were posted in the cultural square to further raise the awareness of water conservation among the rural people.
In a word, in the past year, although our work has made some achievements, there are still great shortcomings. We will conscientiously sum up and correct, explore new and reasonable working methods, overcome difficulties, seize opportunities, blaze new trails, and work harder to complete the tasks assigned by our superiors, so as to make due contributions to the water conservancy cause in our township.