Summary of project supervision 1 XX February1,responsible for the scientific research and development of xx shipyard co., ltd., the 3rd-5th floor project of shipowner's building (architecture and concrete structure specialty), the site quality, progress, investment, safety, contract, information management and organization and coordination in Dehui North 1# outfitting shed project. And on May 2 1 day, the above-mentioned engineering supervision materials were sorted out and handed over.
On April 5, Zhongshan Guangshuan International Shipping and Ocean Engineering Co., Ltd. compiled and handed over the supervision data of single dormitory B, single dormitory C and single dormitory canteen; On May 29th, the compilation and handover of supervision data for road reconstruction, production and domestic sewage treatment system project, 3# shift house and surrounding site reconstruction project in the old district, and 200-ton fixed crane foundation project of Guangzhou Shipyard International were completed.
In July, the preliminary supervision plan and detailed supervision rules of the project were compiled in the supervision institutions of the horizontal slide project of Luhang Test Site and Longxue Factory.
In September, he entered the south outfitting site project of the new hull workshop of xx Shipyard Co., Ltd., and was responsible for site quality, progress, safety, investment control, contract and information management and organization and coordination; In June, 5438+00, the supervision plan and supervision rules were worked out in the early stage for the general contracting of the dormitory project of xx Shipyard Co., Ltd.
Time flies, I have been in xx supervision company for more than two years. Under the careful care of the company leaders and the careful guidance of colleagues on site, with familiarity with the company's technical management documents as the breakthrough point, taking the staff as the foundation, taking "going to the site with problems" as the goal, and taking colleagues' serious work attitude as the example, carefully study the construction drawings, specifications and contract documents in the work; Master the relevant information of the project, understand the acceptance criteria of supervision, be modest and prudent, guard against arrogance and rashness, and always take the service of the owner as the center. Up to now, with the strong support of the company's leaders and project supervision institutions, and the mutual trust of Guangzhou Huangpu Shipyard, xx Shipyard and the Archives Management Office of Guangzhou Shipyard International Company, the supervision completion materials compiled are all "inspection-free products".
During this period, I learned a lot of work that I have never involved before, such as security, contract, information management, coordination and so on. Benefited a lot. I am deeply honored, and every attempt has benefited me a lot. Of course, at this time, I need to seize the learning opportunity that waits for no one.
Thanks to the care and trust given by the company leaders, and to the project leaders, Manager Zhu and Qugong, for their tireless help and explanation. In the future work, I will continue to study hard and work hard to become a qualified supervision worker in return for the trust and training of the company.
I wish the company a bright future and healthy leadership!
Summary of project supervision 2 The project supervision department began to enter the site at the end of March 20XX to carry out the construction preparation and supervision of the municipal engineering of Shangchuan No.2 Road. At present, the project has reached the completion acceptance conditions. Therefore, our project department organized the construction unit, the design and survey unit and the construction unit to jointly conduct the pre-acceptance of the project in 20XX 65438+ 10/0. All units * * * participants went to the site for inspection and acceptance, and agreed that the overall quality of this project basically met the design requirements, met the construction acceptance specifications, and the project pre-acceptance was qualified.
Under the leadership of the director, all the staff of this project department are United and work conscientiously based on the basic principles of "law-abiding, honesty, justice and science", which not only achieves strict supervision, but also embodies the spirit of enthusiastic service. It has been highly praised by Party A, completed the service content agreed in the construction supervision contract, and successfully completed the entrusted supervision work of the construction unit. Looking back on the supervision work of this project department, I think I have the following experiences and experiences:
First, the supervision work must work closely with Party A.
The external environment and natural conditions of the municipal engineering of Shangchuan Second Road are complex. Looking back on the whole supervision process, an important experience is that cooperation with Party A is very important. Party A of this project is Baoan District Land Reserve Center, which is very supportive of the supervision work. Party A's support and efforts are important factors for the smooth completion of the project.
1, the construction management personnel proposed by us are not in place; The quality of personnel was investigated and the number was insufficient; Party A gave decisive support when the basic construction management requirements could not be met. Finally, the project is carried out smoothly and the progress and quality of the project are guaranteed.
2. We respect our opinions on the technical requirements of construction technology and design changes. Such as the design modification of high slope and the replacement treatment technology of soft foundation. , and listened patiently to the supervisor's plan many times. Finally, the monitoring of construction quality and safety of key parts of the project was realized, and the design requirements and contract objectives were achieved.
3, municipal engineering supervision and coordination workload is bigger. The relationship around the location of the project is complex; Although the project coordination work is difficult. In the work, Party A does its best, and we try our best to share its worries.
(1) Cooperate with Party A for external coordination. Coordinate with the surrounding industrial areas. Understand the current situation of historical buildings, coordinate the contradiction between design and past status, and strive for their support for the project, including the removal of obstacles, the migration of pipelines, and the connection between old and new facilities.
(2) Assist Party A to coordinate the design. Due to the lack of engineering geological data, the designed highway slope protection is far from the actual safety requirements. We assist Party A to implement the scheme one by one from the demonstration.
(3) Coordinate various contradictions in the contractor's construction. Including the level of construction management personnel; Check the quality defects and construction progress of various sub-projects for many times. Coordinate and promote it to reduce the impact on the project schedule; They all got strong support from Party A. ..
Second, pay attention to the work of the blue prints.the design
1. The high slope has repeatedly demonstrated that the municipal project of Shangchuan No.2 Road is a piedmont urban road project facing the mountain. The slope at the starting point of the road belongs to ultra-high slope (>: 30m). The design of this slope has aroused our great concern. After design disclosure and joint review, it is inconsistent with the actual engineering geological conditions; We reported to Party A and got the support of quality inspection and safety supervision; Redesign and modify the design according to the specified requirements, and pass the expert argumentation; It avoids potential safety hazards such as landslide and sliding caused by inadequate mountain treatment and reinforcement.
2. Further verification of soft foundation replacement.
Before the joint review of drawings, we insisted on site investigation, digging holes to verify the soft foundation replacement and filling sections of drawings. Because the engineering geological data is quite different from the actual situation, the length and depth of the soft foundation replacement section in the design drawings are far from the actual situation. Thanks to our efforts and the support of Party A, the geological survey was carried out again, and the errors in the drawings that were divorced from reality were corrected.
Third, adhere to the "core and focus" of supervision work.
The core and emphasis of supervision work is "engineering quality and construction safety control". And carry out supervision work with this as the center.
1, engineering quality control, focusing on the quality control of subdivisional work.
(1) subgrade replacement quality monitoring. Municipal road subgrade engineering is pavement foundation engineering. According to the engineering geological data provided by the survey institute, the piedmont alluvial section belongs to soft soil foundation and should be replaced and filled according to the design requirements. In the supervision work, according to the requirements of design and construction technical specifications, layered filling and layered rolling must be carried out. Its compactness must reach the specified value in the specification, and we arrange supervisors to effectively control the construction process. According to the specified number of points, the density test results all meet the design and specification requirements.
(2) Quality inspection of stone powder slag at the base of pavement. The pavement base of Shangchuan No.2 Road is cement stone powder slag base. During the construction process, the construction technology, mixing uniformity, water content, paving thickness and flatness are monitored. It is pointed out that steam curing is not carried out according to the requirements of construction technology and the water content is uneven, which requires improvement. Key indicators such as rolling compactness and modulus of resilience shall be inspected according to regulations until they are qualified.
(3) Quality control of cement concrete pavement. The pavement of this project is cement concrete pavement. In the supervision work, follow up according to the requirements of supervision rules, designs and specifications. Focus on inspection at the grass-roots level, and accept the installation of formwork support, tie rod and dowel bar; At the concrete pouring station, check the concrete mixture ratio, slump of commercial concrete, concrete vibrating, secondary plastering, galling and slotting, timely joint cutting, maintenance and other technological processes to ensure that the pavement strength meets the design and specification requirements.
2. According to the provisions and requirements of the State Council's Regulations on Safety Production Management, review the construction organization design and the construction technical scheme of various subdivisional works according to the prescribed procedures. In particular, it puts forward clear requirements for safety protection in the construction process:
(1) High Slope Protection of Shangchuan No.2 Road. According to the requirements stipulated by the Ministry of Construction, Party A organizes experts to demonstrate the design scheme and requires the construction party to organize the construction according to the design requirements; According to the requirements of supervision procedures, organize the inspection of anchor cable materials and tensioning equipment of anchor cable lattice beams; Review of special construction scheme; Special monitoring of scaffolding; Station supervision, etc.
(2) There should be obvious warning protection for trench excavation, and various inspection wells should be covered during construction to avoid harm to pedestrians and children; And require the construction party to assign special personnel to supervise.
(3) Safety protection of rock blasting. Both the foundation stone of Shangchuan No.2 Road and the trench stone of box culvert need blasting, and we have reviewed the blasting scheme according to the specified requirements. In particular, whether the on-site blasting protection measures are in line with the actual situation is reviewed and controlled. In the environment of industrial zone, the blasting was successfully completed. Fourth, do a good job in the coordination of project supervision 1, external supervision coordination
The supervision and coordination of this municipal project is very heavy. The relationship around the location of the project is complex; Although the project coordination work is difficult. In the supervision work, we try our best to share the worries for Party A;
(1) Coordinate with surrounding industrial zones. Understand the current situation of historical buildings, coordinate the contradiction between design and past status, and strive for their support for the project, including the removal of obstacles, the migration of pipelines, and the connection between old and new facilities.
(2) Coordination with government management functional departments. This includes the coordination of government supervision departments: quality inspection stations, safety supervision stations, roads and bridges, street lamps, greening departments of urban management departments, water, electricity and telecommunications departments.
(1) Organize to send drawings to the door to solicit opinions on the design, and submit them to Party A and the design after sorting and summarizing, so as to coordinate and communicate with each other, which is conducive to controlling investment and smooth construction;
(2) Test the key parts in the construction, and strive for * * * to cooperate with the inspection. Such as: pipeline closed water test, tap water interface and water pressure, disinfection test, destructive inspection of materials, acceptance of sub-projects and so on.
(3) Cooperate with the safety supervision department for many times to conduct unscheduled flight inspections. Strengthen construction safety management to effectively ensure the safety of engineering construction.
2. Internal supervision and coordination.
(1) Assist Party A to coordinate the design. Due to the lack of engineering geological data, the road slope protection design is far from the actual safety requirements, and we assist Party A to implement them one by one.
(2) Coordinate various contradictions in the contractor's construction. Including the level of construction management personnel, it is recommended that Party A replace them; Coordinate and promote the design changes that are insufficient in construction strength and not in place on time, so as to reduce the impact on the project progress;
(3) Soft foundation replacement, pipe trench foundation treatment, drilling depth and length, and coordination with relevant parties;
(4) Organize the coordination of special quality work for quality defects of various sub-projects for many times.
Summary of project supervision work 3 I am xxx, 26 years old, majoring in construction engineering management, with the title of assistant engineer and the qualification of second-class constructor. He joined our company on May 20th, XX, and was appointed by our company as the civil engineering supervision engineer of seven projects, including Building 9, x 17r 1 plot residential project in South New Area of Beijing Economic and Technological Development Zone. Seven projects, including x 17r 19# Building in the Southern New Area of Beijing Economic and Technological Development Zone, are composed of three 24-storey and three 27-storey high-rise residential buildings with large underground garages around them, with a total construction area of 122240㎡, and the projects have entered the stage of completion acceptance. Looking back on the work of the past year and looking forward to the new tasks and challenges that our regulatory authorities will face next year, I feel a lot. In retrospect, the first thing to thank is the concern and trust of the company leaders and the great help and support of colleagues.
Since I entered the construction site, I have always adhered to the standard of a high-quality management talent to define myself, love my job and earnestly complete all the work entrusted by the company's leaders and Party A. In my daily work, I can strictly define myself with high standards, stand ready within the scope authorized by laws and agreements, and strictly perform my post duties. I neither mingle with the construction unit nor insist on keeping a necessary distance from the construction agency. Stand in a fair position and solve some problems on the construction site independently.
In the process of supervision, I pay attention to "quality, progress, investment" and safety to control, mainly emphasizing pre-control and prevention, and nip in the bud. Combined with the inspection and acceptance of process control, on-site control and post-event control.
Quality control: before construction, review the quality assurance system and safety technical measures of the construction unit, timely require the construction unit to rectify the non-conformity with the project plan, supervise and inspect the implementation plan of the construction unit, urge the construction enterprise to improve the quality and safety management procedures and management system, and supervise its effective implementation of 202 1 supervision. Require construction personnel at all levels to hold relevant certificates; Check the validity of drawings, atlas, specifications and standards used by construction enterprises, and check the accuracy of measuring instruments and measuring instruments used (whether in the appraisal period); Review the materials, equipment and components entering the site. At present, the project has entered the stage of completion acceptance, and our department has formulated a weekly comprehensive quality and safety inspection system for construction units organized by the project department. The inspection mainly includes the following problems: the results of the last inspection, which problems have been rectified and which problems have not been rectified, and which problems have been found in this inspection, which are reflected in the weekly, monthly, weekly and monthly inspection records of the supervision. During the daily patrol, I notice the quality and safety hazards in time through oral notice or notice to the supervision engineer, so that the construction unit can make timely rectification. Sign the accepted sub-items and sub-projects every day, and timely summarize and file the information submitted by the construction unit to prepare for the smooth acceptance.
Time limit control: strictly supervise the construction enterprises to organize the construction according to the time limit specified in the approved schedule, urge the project department of the construction unit to prepare the schedule according to the time periods such as year, month and week, and review the guarantee measures for the implementation of the schedule submitted by them. Check the progress of the project image in time, report the progress of the project to the construction unit and analyze the reasons for the deviation! .
Investment control: carefully review the monthly, quarterly and annual engineering quantity statements of this major, so as to ensure the accuracy of the engineering quantity in the engineering quantity visa. Without acceptance or experience, those who do not meet the requirements will not be signed for approval.
At work, I cherish my reputation, adhere to honesty and self-discipline, fulfill my duties, refuse to accept illegitimate interests, put my position in order, and refuse to recognize my fellow villagers and call me brothers at work. Solve problems in work fairly and timely, regardless of time and remuneration at ordinary times, and stick to their posts on rest days and holidays.
XX years passed quickly. Looking back on the supervision work in the past year, the deepest experience is that to do a good job in supervision, we must be strict and conscientious and have a strong sense of responsibility. No matter how complicated the project is, as long as the supervisors can perform their duties in strict accordance with the construction norms and regulations, they can fully grasp the whole project dynamics and control the whole project quality. At the same time, supervisors have high professional quality, and they can give advance hints for each working procedure and each link, which will lead to possible quality. In a word, my experience in one year's work is that as a supervisor, only with good conduct, concise business, good use of my own experience and authoritative test, clear purpose, rigorous style and respect for others can I get respect and recognition from others. As engineers and technicians, only by constantly improving their professional technical level and business skills, improving their communication skills and adaptability to the environment, can they better serve the construction of the project, promote the improvement of the project quality, and thus make themselves better developed. In my work, different pressures are also rare challenges and tests for me. Although there were many difficulties and twists and turns in my work in the past year, looking back, I learned a lot, learned a lot, and summed up many experiences and lessons, which laid a solid foundation for better work in the future.
The past has passed, and the lessons of achievements and failures can only represent a kind of past experience. Future development depends on continuous efforts and creation in the future.
For myself, in my future work and life, I will constantly improve my own shortcomings, sum up experience and lessons, constantly improve my professional and technical level and professional quality, constantly enrich myself, and make greater efforts for next year's work plan. At the same time, usually pay attention to self-charging, search online for exam information in time, strive for more professional qualifications for yourself, strive for an early postgraduate entrance examination, and let yourself have the ability to go to the next level; Strive to improve their comprehensive quality from all aspects, advance towards the goal of comprehensive management of talents, and make greater contributions to the company and themselves.
XX year is coming, and there is still a long way to go in the new year. I want to meet the challenge with a new working attitude and enter the new year with a new working face. I firmly believe that with the guidance of the company leaders and the help of my colleagues, I will be able to better complete the tasks assigned to me by my superiors and make my due contribution to the development and take-off of the enterprise.
Summary of Engineering Supervision 4 20xx years will soon be over. Looking back on 20xx's work, I have the joy of fruitful results, the difficulty of tackling key problems with my colleagues, and the disappointment of encountering difficulties. Time flies, unconsciously, the hopeful 20xx year is coming. The important work this year is summarized as follows:
First, the main work content of an individual for one year
This year, I mainly participated in the first phase of customs clearance project of Yantai Port Bonded Port Area, the general survey of underground pipelines in Yantai City, the restoration project of three jetty yards in Yantai Port, the displacement observation of the comprehensive building and the measurement of several projects of the company.
Second, perform job responsibilities
In this year's work, I still carry out all kinds of work with the attitude of working and learning, sum up the process and main points of each work, find out the problems I don't understand, consult the instructions and consult my leading colleagues in time, and accumulate work experience bit by bit.
In terms of engineering quality, strict supervision shall be carried out in accordance with supervision specifications, engineering drawings and supervision rules. When I participated in the customs clearance project in the bonded port area, I was on the scene most of the time. The project seems simple, but the site is very large, and many points are constructed at the same time. We must grasp the key points of supervision to reduce workload and improve work efficiency and effectiveness. If problems that cannot be solved are found, report to the project leader in time and consult relevant specifications. While solving the problem, I also filled my knowledge gap in this field, and I can solve it independently in the next similar situation. The parts that need to be on site should be on site all the time, and the site records should be made well. The concealed works to be accepted should be accepted in strict accordance with the acceptance specifications. If the acceptance is unqualified, the construction of next working procedure is strictly prohibited. Check and confirm the original certificate test report and quality certificate of materials and equipment entering the site, and witness the sampling and parallel test of steel bars and interlocking blocks. For projects with overlapping operations, coordinate the construction sequence of each construction unit on site and strive to be the best. At the end of each month, the site construction situation will be checked with the construction plan. If the progress is backward, the construction unit will be required to take measures to speed up the construction on the premise of ensuring the quality.
In terms of engineering data, supervision diaries are written every day according to the site conditions, and the site records and other data of that day are sorted and filed, and the construction unit is urged to report the corresponding engineering data. Regularly organize and archive witness sampling, parallel detection and other data, and make various accounts so as to prepare and archive the data at the end of the project.
Third, work experience, feelings and shortcomings
Through this year's supervision work, I feel that as a supervisor, only by following the rules, being strict with myself, integrating into the team, respecting others and being serious and responsible can I win the respect of others. I was exposed to many new things at the construction site. With the careful guidance and help of my old colleagues, I have learned a lot of new theoretical knowledge and practical experience and broadened my knowledge. In this year's work, I have gained a lot, but there are also many shortcomings, such as lack of work experience, lack of care and patience in the face of intense work, which also leads to many flaws in my work. In the future work, I will study hard, constantly sum up experience, learn lessons, correct my own shortcomings, and strive to foster strengths and avoid weaknesses.
Four. Personal career development opinions and views on the company next year.
Engaged in supervision work, knowing too much and too little, can never be satisfied with the present. So next year, I will ask more questions, learn more and do more, and gradually learn various professional knowledge according to the needs of my work. Abide by the company's various management systems in work and life, strengthen the cultivation of team consciousness, further integrate into our collective, use spare time to learn more norms, read more relevant papers, and improve their professional level. I also hope that the company will organize more training for our new employees so that we can better adapt to this job, so that we can do more things for the company.
Summary of project supervision work 5 I. General situation of the project
Xx Cable TV Business Complex is located opposite to xx Park on Cheng Gui Road, and consists of TV Complex (main building) and annex building. The main building contains a single-story studio hall of about 65,438+0,300 square meters. Other divisions and office buildings are arranged according to their functional characteristics. The news center, program editing center, broadcasting center and large conference room are located on the seventh floor and above of the main building, and the general office building is arranged below the sixth floor, with clear division of labor and convenient contact. The annex is five stories high, the main building is nine stories high, and the basement is one floor, with a total construction area of 14348 square meters and a civil engineering budget of 26 million yuan.
The main building of this project is frame-shear structure, and the auxiliary building is frame structure. The roof beam of the studio is a 20-meter-span unbonded prestressed beam with a section of 400× 1300. The roofs of the nine-story conference room and special workshop adopt15m and16m long-span well-shaped floors. The foundation adopts bored piles with diameters of φ600, φ800 and φ 1000. Due to the high groundwater level and thick soft soil layer, in order to achieve the design bearing capacity of single pile, the pile tip is required to enter the moderately weathered rock for 2 meters or more1d. Because of the soft topsoil and high groundwater level, the basement construction needs foundation pit support scheme.
The outer walls of the main building and annex buildings are all pasted with tiles. The facade of the main building adopts hidden frame glass curtain wall and large-span suspended transparent glass (the interior decoration is all constructed by the secondary decoration team).
Second, the supervision organization
Entrusted by the construction unit, our company participated in the supervision of the project from the preparatory stage of the project construction. In order to better achieve the target value of the supervision contract, according to the characteristics of this project, the project supervision organization (see attached table) was established, and the general supervision engineer responsibility system was implemented, with two civil engineers, electromechanical 1 senior engineer and water supply and drainage 1 senior engineer, and detailed project supervision planning and supervision implementation rules were compiled. Perfect supervision rules and regulations have been established, such as post responsibilities, internal supervision and management system, supervision personnel work system and supervision procedures. , so that supervisors can clearly define their job responsibilities, work actively, devote themselves to supervision work with a high sense of responsibility and excellent professional skills, and strive to provide quality services for the construction unit.
Third, the performance of the supervision contract
The three goals of the project are: the quality of the project reaches an excellent level, the investment scale is controlled within 26 million yuan, and the construction and installation period is 365 days.
Construction and installation project1997165438+10/0, completed on February 30th, ***4 17 days, after deducting the shutdown of TV station restructuring (xx TV station merged with xx cable TV station.
Through the organization of the construction unit and the supervision unit, the relevant units participating in the construction carry out the completion acceptance, and on the basis of inspection data and on-site entity sampling inspection and evaluation, the project quality is approved as excellent grade.
The bidding for the construction drawing of the construction and installation project of this project is not perfect. When determining the contract cost, only three types of projects, the budget quota of Guangdong Province, the information price and winning rate announced by the Construction Committee, and the principle of actual settlement when the project is completed are determined. Therefore, investment control is the most critical in the construction process, and the supervision engineer strictly controls the measurement of the project. When the project is completed, the project cost is approved to be RMB 22,665,438+0.365,438+0 million, which can effectively control the project.
A, project quality control
In order to ensure the quality of the project, the personnel of the supervision team established the methods of pre-control, tracking monitoring and supervision to help control the quality of the project, which are mainly reflected in:
1, strictly control the preview.
Familiar with drawings, contracts, technical specifications and acceptance criteria. Strictly review the construction organization plan, especially the quality assurance system, whether the safety measures and the configuration of people, materials and machines meet the needs of engineering construction, and supervise the implementation during the construction process, such as the height of large bay16m and the span of 20m; The floor of the small studio is 6.8m, with a span of16m; The lobby is 8.2m high and spans11m. In the process of construction, the construction party is strictly required to formulate the construction scheme of high formwork and supervise the whole process. Only after meeting the requirements can the next working procedure be allowed to enter the construction, which ensures the construction safety and engineering quality.
2, the implementation process supervision
Strictly control the quality of raw materials, semi-finished products and finished products entering the site to ensure that qualified materials are used in the project. When materials enter the site, in addition to strictly examining the certificate of approval, they should also be sampled and witnessed at the specified frequency, and materials that do not meet the requirements should be resolutely eliminated. For example, φ 12 steel bars failed to pass the sampling inspection, and this batch of steel bars was eliminated many times, effectively ensuring the quality of raw materials, thus ensuring the quality of the project.
3. Improve the standby system.
Establish and improve the on-site supervision system, implement on-site supervision on key parts, ensure the quality of working procedures, and strictly check each working procedure during construction. For example, during the construction of unbonded prestressed tendons in a large studio, the positioning coordinates of the tendons are rechecked before installation, and many serious deviations are corrected in time to ensure that the design and specification requirements are met.
(3) Timely and accurate visa confirmation for concealed works, providing perfect basic data for project settlement, is a necessary means of investment control. For example, in the construction of drilling (punching) piles in this project, the hole cleaning acceptance of each pile should be adhered to, and the engineering quantity should be confirmed to prevent false reporting.
(4) Strictly control the measurement of project settlement, which is the key link of investment control. After the completion of this project, our cost engineer reviewed the construction settlement, and * * * reasonably reduced 3.462 million yuan, saving the project investment for the construction unit.
Second, the safety and civilized construction supervision
Actively supervise the management of safe and civilized construction. During the whole construction process, no safety accident occurred, and the project progressed smoothly, basically meeting the relevant regulations of civilized construction requirements in xx city.
Four, supervision work experience
1, serious and responsible, enthusiastic service
Supervision work should fully reflect the comprehensiveness of its service for engineering construction. In addition to the "three major control" objectives, contract management, engineering information management and organization and coordination are also indispensable. The setting, implementation, comparison and correction of supervision objectives should run through the whole process. In view of the construction of this project, according to the actual situation of the project, the supervision personnel made a supervision plan and set up quality pre-control points, with clear objectives and positive work.
2, organization and coordination of the realization of the goal
It is very important for all contractors to cooperate with each other to achieve the supervision goal. In this project supervision, due to the complexity of professional technology, numerous contractors, strict requirements for three-dimensional construction and mutual cooperation of various professions, and the active cooperation of supervisors, the supervision work went smoothly, which ensured the effective realization of the whole project construction supervision goal. For example, during the construction of the main structure, the supervision engineer will coordinate various professional teams to embed pipelines on time and organize acceptance in time, which will play a positive role in better coordinating the overall project progress.
3, safeguard the interests of the construction unit and establish the image of supervision.
In the process of engineering construction supervision, the supervision engineer put forward a series of rationalization suggestions, which not only saved the investment for the construction unit, but also embodied the purpose of supervision high-tech service and established a good image of construction supervision.
4, the construction unit's code of conduct is conducive to project construction supervision.
The code of conduct of the construction unit plays a positive role in the development of construction supervision of this project. When signing the entrusted supervision contract, clarify the obligations, responsibilities and rights of the construction unit and the supervisor, and follow the construction procedures. Thus, the supervision engineer can fully exercise his rights, play an active role in the "three controls, two controls and one coordination" of engineering construction, and better realize the engineering construction goal.