Technical summary and work summary 1
In 20xx, under the leadership of branches and sub-branches, the rural power sector took the "th
Technical summary and work summary 1
In 20xx, under the leadership of branches and sub-branches, the rural power sector took the "three innovations" rural power strategy as the goal, deepened the work of striving for Excellence, consolidated the safety foundation, accelerated the construction of standardized power supply stations, took improving the equipment level of rural power lines as its own responsibility, put people first, and strictly managed, which laid a good foundation for completing the annual task. The work in the first half of this year is summarized as follows:
I. Completion of main indicators
1, safety production index:
(1) No personal injury accident occurred;
(2) No misoperation accident occurred;
(3) No major equipment accident occurred;
(4) No road traffic and fire accidents occurred;
(5) There is no electric shock accident in rural areas;
(6) Obstacles such as equipment without personnel responsibility.
2. Production and operation indicators (as of May 3 1):
(1) The electricity sold was 4,088.59 million kwh (excluding large users of rural power lines), with a year-on-year increase of17.66%;
(2) The comprehensive average electricity price index is 452.53 yuan/thousand kwh, which is 65,438 yuan +09.53 yuan/thousand kwh higher than that of 433 yuan/thousand kwh, and 2.6% lower than that of 466.65 yuan/thousand kwh in 20xx;
(3) The implementation rate of rural classified comprehensive electricity price is100%; The actual meter reading rate of electric energy meter is100%;
(4) The low voltage line loss rate is 8.74%;
(5) The power recovery rate is100%;
(6) The reliability of power supply is 99.76%;
(7) The qualified rate of 220v voltage is 96.5%;
(8) The switching rate of compensation capacitor at 0.4 kV side of distribution transformer is 99.7%;
(9) The total leakage protector can be put into 99.8%.
Two, the completion of rural power key work
1, engineering construction
(1) Complete the final accounts audit of 20xx, 20xx high-energy distribution transformer replacement and 20xx high-loss substation reconstruction project.
(2) Completed the household table sorting project and final accounts audit. Completed the task of transforming the household table of 4400 households in 25 power transfer villages, which enabled the power transfer villages to use electricity at the same price in urban and rural areas, reduced the management cost of enterprises, straightened out the management system, and expanded the company's electricity sales market;
(3) The second batch of street lamp projects 3)20xx years. The lighting project of street lamps in four villages was completed, which promoted the construction of new countryside. Completed an investment of 200,000 yuan;
(4) Complete the final accounts audit of Sanjian Substation 10kv wiring project to realize power supply in LULU Village.
(5) Completed the 20xx medium and low voltage reconstruction contract.
Contract signing, bidding and purchasing of materials, commencement information, formulation of three measures, construction drawing and other engineering preparations. Four of them started work, but they were temporarily suspended due to the arrival of main materials and the lack of compensation.
(6) Complete the electrical transformation project of Chencun Avenue.
2. Equipment management. Strengthen the transformation and rectification of equipment through spring inspection and technical transformation. In view of frequent tripping of 10kv lines, 68 sets of lightning arresters were replaced and 16 sets were added. Test the grounding resistance of the grounding device in the remote distribution station area. Excavate 3 places, add resistance reducing fluid 2 places, and replace grounding body 1 pair. Clean up the corridor, cut down 335 illegal trees and prune more than 70 trees/kloc-0; 70 transformers (43 from SDIC and 27 from customers) were tested, and 3 transformers were put into storage for maintenance. At the same time, focus on the hidden dangers of user lines and distribution transformers, and all 66 aluminum wire hooks have been rectified. In view of the security risks existing in subscriber line facilities, the Confirmation Letter of Safety Risks of Subscriber Line Facilities was issued and rectified within a time limit. Due to proper measures, the number of trips has dropped significantly. In view of the low voltage in the station area, organize technicians and professionals in the station area to actually test the load situation, adjust the load wiring, so that the imbalance of the three loads is not more than 15%, and provide the distribution transformer output to the maximum extent; Intensify the propaganda of electricity use, and guide well irrigation and power users to avoid peak electricity use; Lease 7 distribution transformers, with rotation of 1 1 and new distribution of1; Anti-aging replacement of low-voltage lines 1.6 km effectively relieves overload pressure in some areas and reduces low-voltage line loss. Through daily patrol, regular patrol and special patrol during the Spring Festival and the college entrance examination, the personnel of the power supply station have managed serious hidden dangers 1, eliminated 29 general defects, replaced 7 sets of drop switches 1, maintained 24 sets of line vacuum switches1,improved distribution transformer warning signs, and improved line identification plates 1562, and prevented the collision of towers.
3. First-class construction engineering. According to the first-class standard, research and integrate the basic account data, and merge and summarize the accounts with duplicate contents. At the same time, according to the actual situation, all departments have carefully improved the defects and emergency repair processes of the institute, standardized the first-class work and inspection guidance, purchased two new computers and maintained four. Improve Zhongyang training base.
4. Power management. Sign a safety commitment letter with rural power employees; Strengthen work style and labor discipline rectification; The management methods and implementation rules for performance appraisal of power supply stations were compiled and issued, and the rural power department led a team to organize relevant personnel to inspect and assess the 10kv lines, stations, electricity prices, electricity charges, line losses, business indicators, safety management, personnel management and civilized production of seven power supply stations. The problems found are: loose labor discipline; The implementation of the two safety regulations is not in place, the load side management department is not in place, the transformer capacity does not match the account card, the electricity price is not in place, the power supply is switched, there is no household electricity consumption, the metering device has no tail seal and ear seal, the user name is confused with the nature of electricity consumption, and the nature of electricity consumption is falsely reported; Illegal use of electricity; Stealing electricity and other phenomena. We take technical and organizational measures, increase technical input and management assessment, plug management loopholes and prevent hidden power loss. Through inspection, the basic management, electricity price and charge management of power supply station are standardized, and the labor discipline is serious and standardized.
Service behavior, improve the management level of power supply station, and establish a good market image.
5. Education and training. In the first half of the year, power supply personnel were trained 160 person-times, including 28 person-times of superior training and 32 person-times of branch training. The training cost was more than 40,000 yuan, and the training in marketing, business development, safety, three-level ability and standardized operation was completed, and a professional skill competition was organized. Through training, the power supply personnel's systematic understanding of business knowledge has been deepened, the operational level of business knowledge of power supply personnel has been improved, and the safety of frontline personnel has been improved. Continue to promote the construction of talent pool, and train and select two-level rural power talents through multiple channels and forms. 1 person was selected as the outstanding rural power talent of State Grid Corporation, and 4 people entered the talent pool of the branch.
Three, the main problems in rural power work
1, power distribution equipment is overloaded. Overloading of distribution transformers and lines causes frequent accidents such as low voltage, high loss and burning, and high pressure during peak summer. There are many hidden dangers in the low-voltage station area, and the intensity of personnel maintenance and emergency repair is high, which also affects the quality service;
2. The metering device runs in the whole cycle. Since the power network reform in 20xx, the meters have not been checked by cycle rotation, and have been running beyond the limit for a long time. The terminals are rusted, poorly contacted and caught fire, which not only leads to inaccurate measurement, but also easily leads to indoor fire due to frequent burning of metering devices (meters), and the power supply station bears great psychological pressure.
3. The vehicles maintained by the power supply station are out of service, with poor condition and high maintenance cost.
Four, the second half of the rural power work ideas
Adhere to the policy of "safety first, prevention first, comprehensive treatment", around the annual work plan of the branch, quantify the safety production indicators, vigorously carry out anti-violation work, standardize the operation behavior of personnel, eliminate equipment defects, and ensure that personal accidents, fire accidents, road traffic accidents, personnel responsibilities with equipment, personnel responsibilities with power outages, electric shock deaths in rural areas and other obstacles do not occur, and complete various economic indicators issued by the branch. Implement the "three new" rural power development strategy, promote the integration and corporate management of rural power, build a new rural power development model integrating urban and rural areas, promote management innovation and system innovation, strengthen the intensive development, lean management and standardization of rural power, continuously improve the management level, management efficiency and economic benefits of rural power, promote the sustained and healthy development of rural power, and better serve the construction of new socialist countryside. Continue to consolidate the achievements of first-class power supply enterprises, improve rules and regulations, build basic data, and successfully pass the re-inspection of provincial companies. Deepen the construction of Hongqi Station Line, strive for projects and funds, and strive to reach the standard of Hongqi Station Line along the highway 10kv trunk line. Strengthen project management, implement project management requirements, strictly examine and approve procedures and bidding procedures, rationally use project funds and reduce project costs. Strengthen the traffic safety management of power supply stations, put an end to road traffic accidents of the same or above, and put an end to drunk driving and drunk driving incidents. Intensify market research, severely crack down on the phenomena of electricity consumption without household registration, false report on the nature of electricity consumption, illegal electricity consumption, electricity theft, collusion between internal and external sources, etc., clean up moths in rural power teams, plug management loopholes, prevent hidden loss of electricity and increase operating income. Strengthen education and training, gradually improve the training and education mechanism, incentive assessment mechanism and management mechanism of rural power employees' employment salary, cultivate corporate culture, create an atmosphere of respecting talents, gathering wisdom, cultivating talents and inspiring people, improve employees' professional quality, professional skills and execution, build a professional workforce, cultivate and select compound professionals, and hire people with strong ability, dedication and responsibility to management positions or key positions, and strive to end the five-year system. Strengthen voltage and reactive power management and improve equipment utilization.
20XX June 22nd
Technical summary and work summary II
Since joining the work in October-October, 20xx, I have participated in the construction of Jingba Road Project, xxx Road Project, xx Road Project, XX West Road Project, XX East Road Project, xxx Project, etc. At present, I am responsible for the data collation of bt project construction in the port area in xxx, and have served as a student, librarian, contract administrator and political worker.
During my work as a documenter in the construction technology department, I was meticulous and conscientious. The main work includes:
1, cooperate with various professional engineers to strictly control engineering data. Because the engineering data truly reflect the achievements of engineering construction, and the data are various forms of information records formed in the process of engineering construction, only by fully cooperating with other professional engineers can this work be completed and done well.
2, responsible for the management of construction data, as well as the collection, sorting and archiving of construction data. Construction data is a real record in the process of engineering construction, and it is a systematic project. It involves the substantive work of engineering contractors such as supervision units, construction units, construction units and design units, and is a symbol of scientific, standardized and legal construction work.
3. Prepare meeting minutes.
4, according to the data sorting program will be included in the scope of urban construction archives to xx building archives. Only when all the previous links are done well can the files be handed over smoothly.
The South Ring Road project undertaken by us is not only of excellent quality, but also adds a beautiful landscape to the port area in appearance. During the construction of xx road project, I actively cooperated with leaders and technicians, and formed a good working relationship with the construction unit and supervision unit to ensure that the information could not be signed. In response to the "Safe Site Creation Activity" of 20xx City Planning and Construction Bureau, I was accepted as the "Safe Site Leading Group" and became one of the main leaders of the activity. The "Safety Site Creation Account" that I am responsible for has been well received by the project department and the company leaders, and has been recognized by the superiors at one time, which has gained positive influence for the company. Later, he was also responsible for activities such as "one law and three certificates" and "creating a civilized construction site".
The construction materials and completion materials of the four projects I participated in or were responsible for were completed on time, seriously and with high quality, which laid a good foundation for the timely completion and final accounts of the projects. Therefore, it has been praised by the leaders of the project department and the construction technology department for many times.
In addition, in the process of project construction, I am also responsible for the contract management of the project, especially the implementation of the labor contract law. There are many labor contracts that need to be re-signed by the unit and centralized management of migrant workers, which has taught me a lot. During my work, I keep learning and improving my professional skills and practical experience, hoping to do better in my future work.
Technical Summary and Work Summary Part 3
With the care and support of school leaders, I have done a good job in teaching this year based on reality, constantly updated my knowledge and improved my own quality. The work of this school year is summarized as follows:
First, based on reality, do a good job in teaching
The students in our school are in a special situation in information technology, because some transfer students. Different from other subjects, these transfer students have never studied information technology before, which is blank in this respect. They don't even know how to use the mouse target and how to turn on and off the computer. Where are the other students? I have been able to find games in my online neighborhood and know how to share, hide and access folders. Sometimes teachers can't help it. How to make a student who has never been exposed to information technology master the most basic knowledge? I carried out the "hierarchical teaching" mode, strengthened individual counseling, realized one-to-one and many-to-one help among students, and basically solved the problems in conventional teaching.
Second, based on teaching, do a good job in teaching and research group.
Under the requirements and guidance of the Academic Affairs Office, the work this semester is normal. There is a work summary every month, the time and place of concentrated study, the implementation of information, and records. At least once a month, there is a special theoretical study with strong information.
Third, strengthen study and improve professional level.
Usually pay attention to their own culture and business study. I can recite a teaching theory book, read more than two magazines widely, write papers with necessary quality and teaching, and take notes on more than a dozen cards every month. Any teaching activity is always inseparable from the main line of combining theory with practice, especially information technology. With the support of school leaders, I participated in the training organized by the Municipal Education Bureau in 20xx, and learned a lot from it.
According to the above summary, I deeply feel that as long as we are based on reality, carefully analyze the research textbooks and outlines, study the students well, and win the support of school leaders, teachers and students, we can creatively do a good job in the teaching of information technology courses and make my work pioneering and enterprising.
Chapter 4 Technical Summary and Work Summary
This school year, I took over the teaching of labor skills in Grade One and Grade Two. Since the beginning of the first school year, I have been engaged in the teaching of labor technology with a serious and rigorous academic attitude and diligent persistence, and have achieved certain results. In order to continuously improve the quality of teaching and promote the all-round development of students, the teaching of labor technology in this school year is summarized as follows:
First, stimulate students' interest in learning and let them experience the joy of learning.
The subject of labor technology has always been a branch in the school, so students have a weak foundation and are generally not interested. In order to correct this view and improve students' understanding of this subject, I start with cultivating students' cognitive ability, and further understand students' ideological status and some students' knowledge defects through feeling the surrounding environment and yearning for a better life, and gradually find out the basic characteristics of each student. Then, according to the characteristics of students, carry out some colorful activities, such as which flowers are there in the four seasons, and strive to create a good atmosphere, so that students can gradually reverse their boring impression of labor skills and stimulate their interest in learning. Finally, I use various opportunities to give students at different levels a sense of accomplishment, so that every student can experience the success and happiness of learning.
Second, study business seriously and strive to improve the teaching efficiency of 45 minutes in class.
In business, I never pretend to be "experienced" with my years of teaching experience. I actively use various opportunities to learn new educational and teaching concepts, study teaching materials and methods, and persistently "recharge myself" to improve my professional theoretical level. In class, I combine the new curriculum ideas I have learned with reality and try my best to put them into classroom teaching to improve the efficiency of 45 minutes in class. After class, I often discuss with my colleagues all kinds of problems encountered in the teaching process, learn from each other and improve together, from which I feel that learning is endless. To give full play to the role of classroom teaching as the "main position" and improve the efficiency of classroom teaching for 45 minutes, we must keep pace with the times and persistently study and explore new teaching theories and practices.
Third, combine caring for students with strict requirements, and strive to make every student progress.
If you kiss your teacher, you can believe it. In the process of contact with students, I don't pretend to be a "teacher", try to communicate with students on an equal footing, establish a "friend-like" profound friendship, and strive to care for the growth of every student. Communicate with students more and help them solve all kinds of puzzles in their study and life. At the same time, in the face of individual naughty students, strict requirements and correct guidance methods are also implemented, so that they can establish a correct concept of honor and disgrace. Facing students at all levels, I should not only care about most students, but also set strict requirements for some unruly troublemakers. In class, I try to combine stratified teaching with individual counseling; After class, I let outstanding students pair up with "students to be advanced" to help each other and improve together. Over the past year, students' weak basic knowledge has been steadily improved.
Fourth, the existing shortcomings and the direction of efforts
Some students' bad study methods and habits formed over the years need to be further standardized and guided; In the future, I will continue to explore an effective mechanism to improve students' interest in learning and promote their all-round development in the spirit of "teaching and learning". Continue to keep close contact with the parents of students, cooperate with their education and train our next generation, and strive for a double harvest of personal growth and student growth.
Chapter V Technical Summary and Work Summary
20xx 65438+ 10 officially took part in the work, and was assigned to work in Room xx of xx Bureau of xx City. At the beginning of my work, I found that the professional knowledge I learned at school was very different from the actual work. In order to change my role as soon as possible and adapt to the requirements of my work, I study my professional knowledge and improve my job skills. In just half a year, through my own efforts and the help of my colleagues, I have been able to skillfully carry out more complicated daily affairs.
First, political and ideological aspects.
Politically, I am strict with myself, take an active part in various political activities, consciously study political theory, especially the "Theory of Three Represents" theory, strive to improve my political theory literacy, try to practice Theory of Three Represents, and be consistent with the CPC Central Committee in thought and action. Have a strong sense of the overall situation and organizational concept, put the cause first, regardless of personal gains and losses, put the cause and the interests of the broad masses of the people first, and strive to practice the fundamental purpose of serving the people wholeheartedly. Be fair, just, just and upright in the work, have strong professionalism and dedication, work hard, be proactive, have a down-to-earth style, do not shirk, and stress efficiency. Pay attention to investigation and study, be diligent in thinking, and have clear working ideas. Can combine the general theory of scientific research management with scientific research practice, and actively make suggestions and suggestions for the system to formulate practical scientific research development goals and measures. Be unambiguous in the face of right and wrong, and play an exemplary role for a cadre in career development and reform.
Second, organization and coordination
In practical work, I study hard to analyze, study and solve problems with Marxist standpoints, viewpoints and methods, and have certain organizational coordination and scientific decision-making ability. Pay attention to the study of modern scientific research management knowledge and master the general laws of scientific research management in humanities and social sciences. As a part-time management worker, I can help department leaders to do a good job in the ideological and political work of employees and provide a guarantee for the effective development of department work. In the work, we fully believe and let go of the department-level cadres in charge, and pay attention to training, which has played their role well.
Third, business ability.
Since I joined the work, I have worked hard to learn the theoretical knowledge and professional skills of my major, attached importance to constantly improving my professional level and teaching ability, and strived to improve my professional technical ability and level through different forms of study in my spare time according to the actual needs of management work. Through years of hard work, my professional skills and ability to control my work have been greatly improved, laying a solid foundation for better completing various tasks. Since joining the work, he has been awarded the honorary title of advanced individual in the city's management work for many times.
Fourth, continuing education and learning.
In order to better adapt to the current land management work, and strive to do their own work. I attach great importance to further study and have participated in technical training organized by various departments many times. In June, he participated in the first vocational training for senior secretaries in xx City and obtained the vocational qualification certificate for senior secretaries. Since joining the work, I have actively undertaken all the work of management, and I can be conscientious and successfully complete all the tasks assigned by the organization. I have never influenced my normal work because of personal matters, and I have always been able to actively participate in various activities organized by the authorities. Because of his excellent work, he has been affirmed by the bureau leaders many times.
Verb (abbreviation of verb) professional scientific and technological achievements
Problems in intransitive verbs
X There are not many representative works and highlights in engineering and technical management, insufficient innovation, insufficient investment in scientific research, insufficient decision-making ability and level of scientific research management, and few major achievements. In the future work, I will definitely study harder, use the knowledge I have learned to explore the basic laws of protection work, constantly improve working methods, improve work efficiency, work hard, and become a qualified management professional and technical personnel.