Current location - Education and Training Encyclopedia - Graduation thesis - A paper on project cost
A paper on project cost
Here, too.

Some information, take a look.

Dynamic control of project cost in project implementation stage

The paper should be checked first.

The research scope of dynamic control of project cost is defined, and the principles and three systems of dynamic control of project cost are put forward, namely, dynamic control of project cost.

Planning system, monitoring system and regulating system. In the next chapter, these three systems will be analyzed in detail, and their dynamic control of project cost will be analyzed.

In the project cost control planning system, firstly, the unit project is decomposed by wbs theory.

It provides a theoretical basis for compiling the division project cost plan. Re-analyze the shortcomings of the current project cost planning method in China, and put forward

Wbs theory is consistent with the progress.

Method of project cost planning based on gis.

In the project cost monitoring system, through the investigation of existing projects

Project characteristic attribute and project cost attribute, using fuzzy mathematics theory to calculate the similarity between built projects and proposed projects, and determine the similarity between built projects and proposed projects.

Put forward the most similar project, and then use the gm( 1, 1) model in the grey system to calculate the data of the proposed project according to the existing project information. Then, using earned value and control chart theory, the earned value-control chart model of project cost monitoring is constructed, and the control parameters of the model are calculated, and the model monitoring standard is determined, so as to monitor the project cost in real time.

In the project cost adjustment system, according to the deviation information in the monitoring system, firstly, various factors affecting the project cost deviation are analyzed, and the weights of the influencing factors are analyzed through questionnaire survey, and the weights of the influencing factors are sorted to find out the influential factors with greater weights.

Adjustment measures to be taken

Stone.

Finally, using an engineering example, according to the general idea and control principle of dynamic control of engineering cost, the engineering cost plan is compiled to predict the actual engineering cost of the proposed project, and then the actual engineering cost of the proposed project is predicted.

The price control model analyzes the cost deviation in the actual construction process, and analyzes the cost deviation of each

The deviation puts forward specific adjustment methods. Through actual cases

Examples are given to illustrate the dynamic control planning system, monitoring system and project cost adjustment.

Scientific and practical nature of the system.

The graduation thesis of project cost is in

China requires paper publishing.

A lot. I asked the teacher above for help before. Much better than many individuals and small organizations on the Internet.