Sub-projects of ship construction on water include: foundation trench, wharf ground excavation, underwater drilling and blasting construction, foundation bed riprap, foundation bed tamping, foundation bed leveling, barrel transportation and barrel floating installation. The required ships are six 8m3 grab dredgers, three 500m3 mud barges, three 1000m3 mud barges and two 44 1kw tugboats. There are 3 drilling and reef-blasting boats, 1 submarine barge, 2 riprap boats, 1 leveling boat 1 boat, and 2 400-ton barges converted into transport boats. In order to ensure the safety of ship construction and personnel, the project department formulates this regulation and preventive measures according to the actual construction situation.
I. General provisions on the construction of ships on water
1. The construction ship shall keep in touch with the dispatching room and the local meteorological and hydrological station at any time, listen to the weather forecast every day, and make records, so as to know and master the weather changes and water regime dynamics at any time and take timely countermeasures.
2. All kinds of construction ships (including traffic ships and transport ships that cooperate with construction operations) must meet safety requirements, hold all kinds of valid certificates at the same time, and be equipped with all kinds of qualified crew members according to regulations. Ship machinery, communication, fire fighting, lifesaving, pollution prevention and other equipment must be safe and effective, and pass the safety inspection of the local maritime safety administration.
3. The construction ship shall keep smooth communication with the dispatching room day and night, and display effective navigation, berthing and operation signals according to regulations.
4. Before construction, you should apply to the local maritime bureau for an above-water and underwater construction permit. Special lifeboats should be set up for water construction, and special personnel should be on duty. Life-saving equipment such as lifebuoys and life jackets should be equipped at each construction operation point.
5. Strictly implement the safety operation rules of ship machinery and equipment, and timely repair and maintain the equipment to ensure safe operation. Major accidents such as machine damage must be reported to the project department immediately.
6, in strict accordance with the approved tonnage loading, shall not be overloaded, unbalanced navigation, to prevent accidents.
7. Oil, sewage and garbage on board should be collected and recorded. It is strictly prohibited to discharge and dump into the river, and equipped with fire fighting equipment.
8. Strictly implement the Regulations on the Safety Management of Underwater Construction and Navigation and the Regulations on the Safety Management of Water Shipping, and operate carefully to ensure safety. Water traffic and pollution accidents should be reported to the project department immediately.
9. All ships must be equipped with enough life-saving equipment such as lifebuoys and life jackets according to regulations, and life jackets must be worn when working on deck. Safety nets should be hung on the personnel passage, the springboard should be fixed, and railings and safety nets that meet the standards should be installed around the water working platform. At the same time, anti-skid work should be done well.
10, earnestly implement the safety alert protection measures for the construction platform facilities, bridge piles and underwater pipelines in the construction operation area, and do not expand the scope of the safe operation area (construction waters) for water construction without authorization to ensure the safety of people, ships and things in the operation area.
1 1. Implement the safety construction management system in the operation area, ensure that ships, rafts and facilities irrelevant to the construction operation are not allowed to enter the construction waters, and prevent safety accidents between the construction ships and other construction ships that hinder the normal construction.
12. Each operation team shall designate experienced responsible comrades to be responsible for the safety management of water operations, so as to ensure the implementation of various management systems and preventive measures for environmental protection of personnel, ships, operation areas and waters.
13. Domestic garbage and plastics on the construction ship are not allowed to be thrown into the water at will. Domestic garbage must be put into a covered storage container and transported to the shore regularly for dumping.
Two. Provisions on ship safety management
(a) the safety requirements of the construction ship and crew
1, water construction must be in strict accordance with the "Regulations on Navigation Safety Management of Water and Underwater Construction in People's Republic of China (PRC)" and apply to the local maritime department for the "Water and Underwater Construction Permit".
2. The construction ship shall hold a valid certificate of nationality or ship registration.
3, the construction ship must go through the visa formalities before entering and leaving the port. Operating ships that do not frequently enter and leave the port shall apply to the maritime department for a regular visa.
4. The seaworthy area of the construction ship shall meet the requirements of the navigation area. All construction vessels, including dredgers, barges, reef-blasting vessels, leveling vessels, riprap vessels, diving barges, transport vessels, etc. , should hold a valid airworthiness certificate issued by the ship inspection department.
5. The construction ship shall be equipped with qualified crew sufficient to ensure the safety of the ship in accordance with the Minimum Safe Manning Rules of People's Republic of China (PRC). The captain, chief engineer, driver, engineer and operator must hold qualified certificates of competency.
6. When a construction ship is sailing, anchoring or working, it should display different signals according to different construction conditions in addition to the specified signals.
7. At each construction site, warning lights should be displayed or lighting should be used according to regulations at night to avoid collision between sailing ships. When the lights are displayed, attention should be paid to avoid direct light on the water surface, which will affect the lookout of the people on board.
8. Construction ships should strengthen the duty system, keep listening to VHF calls for 24 hours, and observe and understand the surrounding situation. Ships should have night lighting equipment, and ships with power generation equipment should be equipped with windproof lights and battery lights.
(2) Regulations on the Safety Management of Traffic Vessels
1. Traffic vessels must hold valid certificates (airworthiness certificates) and safety certificates that meet the requirements of Class III navigation areas, and the captain, chief engineer, driver and operator should hold valid certificates of competency.
2. Traffic boats must be equipped with sufficient life-saving equipment such as life jackets, lifebuoys and life rafts, as well as adequate fire fighting equipment, oil pollution equipment and oil-sewage separators.
3. Ships shall be equipped with VHF telephones and maps of water areas for water operations.
4. The ship shall be equipped with a safe emergency passage, and the schematic diagram of the safe passage shall be posted on the wall.
5. Sail according to the navigation route, stop site and time specified in the dispatching room, and stop at a fixed point.
6. The ship shall transport employees to and from work according to the approved manned quantity, and shall not be overloaded; If the number of nuclear carriers exceeds, the captain has the right to refuse to sail.
7. It is strictly forbidden to ship and carry inflammable, explosive, toxic and harmful dangerous goods on traffic boats. If the work is urgent, the carrier should contact the captain in advance and handle it properly. It is forbidden to mix people and goods.
8. The personnel on board who take up and take down the cable must wear life jackets, stand in a proper position, fasten the cable after the ship is in place and stable, set up a springboard, and do a good job in protecting the personnel getting on and off the ship to prevent accidents.
9. Employees who take the traffic boat must consciously abide by the regulations of taking the boat, obey the unified command of the crew, go up and down in turn after the ship is firmly anchored, and must not jump off the boat after grabbing or the ship is not firmly anchored, and must not stand and ride at the bow, stern or boathouse; It is forbidden to drink and ferry or board the ship.
10. Non-drivers are forbidden to enter the bridge, and it is forbidden to tamper with all life-saving and fire-fighting facilities on board at will; Unauthorized operation by non-drivers is prohibited.
1 1. Spitting is strictly prohibited on traffic boats, and smokers must smoke in designated areas. Cigarette butts and scraps of paper should be put into garbage bins, and environmental protection should be done consciously.
12. The ship's garbage should be recycled centrally, and it is forbidden to throw it into the water at will. The oily sewage from ships must be treated by a separation device and then concentrated, and recorded in writing.
13. The captain and chief engineer should always check, maintain and repair the ship's mechanical equipment and safety facilities to ensure safe operation. There should be sufficient lighting and signal display when sailing at night.
14. In case of severe weather such as gale, thunderstorm and storm of magnitude 6 or above, the traffic boat should stop running and anchor at the designated place.
(3) Regulations on the Safe Use of Construction Ships
1. All construction vessels (including dredgers, reef-blasting vessels, riprap vessels, material carriers, etc.). ) must hold a valid certificate (airworthiness certificate) and relevant certificates that meet the requirements of Class III sea areas; The captain, chief engineer, driver and operator shall hold valid certificates of competency.
2. The construction ship must be equipped with sufficient life-saving equipment such as life jackets, lifebuoys and life rafts, as well as adequate fire-fighting equipment and facilities, such as oil and sewage separators.
3. The ship shall be equipped with VHF telephone and contact telephone, as well as the recent navigation notice in the construction operation area.
4, should be in accordance with the designated navigation routes, stops and practice points, fixed-point berthing.
5 ships carrying equipment and materials must be loaded according to the approved tonnage, and shall not be overloaded or unbalanced; The loaded equipment and materials shall be placed stably and securely tied.
6. Ships should be equipped with safe emergency passages, and the passages on both sides of the cabin are clear. It is forbidden to pile up any articles, and at the same time, anti-freezing and anti-skid work should be done in winter.
7. It is strictly prohibited to transport and carry inflammable, explosive, toxic and harmful dangerous goods on construction ships. If it is necessary to carry it urgently because of work, the carrier should contact the captain in advance and handle it properly. It is forbidden to mix people and goods.
8. The garbage on the ship should be recycled centrally, and it is forbidden to throw it into the sea at will. Oily sewage from ships must be treated by a separate device and recorded in writing.
9. The captain and chief engineer shall regularly inspect, maintain and repair the mechanical equipment and safety facilities of the ship to ensure that there is sufficient lighting and signal display for safe operation and night navigation.
10. In case of severe weather, such as gale, fog, thunderstorm, storm, etc. above level 6, it is forbidden for construction ships to work and run on water, and anchor at the anchorage designated by the maritime department to avoid the wind.
Third, the water construction safety measures
1. All construction teams in the project department must take the safety of water construction as the top priority, strictly implement the relevant management regulations of water construction, designate special personnel to be responsible for the safety of all construction ships and operating points, actively cooperate with the safety and quality department of the project department, form a secondary safety management network, form a comprehensive safety management system, implement safety measures layer by layer, and strengthen safety management.
2. Keep regular contact and communication with local government, maritime, meteorological and other administrative and industry management departments, supervisors and owners, obtain relevant policies, laws and information on water construction safety in time, and report the construction progress and requirements in time to get the support and cooperation of all parties.
3. Each construction ship shall establish a perfect safety system. Establish the whole supervision system of safety access, safety supervision, education and training, assessment and evaluation, and establish corresponding safety management files.
① Safe entry. Before a construction ship is put into operation, it shall carefully check the valid certificates, seaworthiness and resource allocation of the ship, and report the inspection and audit of the construction ship to the maritime authority.
② Safety inspection. Conduct monthly self-inspection on the safety of construction ships on the water, and cooperate with relevant departments and maritime departments to monitor the construction ships, including the implementation of safety systems such as safety equipment, fire fighting and lifesaving, various safety management accounts and illegal accident records. Apply to the maritime department for a safety inspection of the construction ship every six months.
③ Safety education and training. Regularly organize safety education and training for water construction operations, and organize construction ship units to carry out on-site experience exchange and emergency plan drills according to the actual situation of water construction operations. Invite experts in maritime affairs and meteorology. Conduct special safety education and training for the relevant personnel of the construction ship.
④ Safety assessment. Establish a safety risk fund system and a monthly and quarterly assessment system to reward those who are competent in safety management, or punish them until they are disqualified from water construction. In case of major general accidents or major safety hazards during the construction process, construction ships will be listed as key supervision ships. Ships listed as key supervision should be rectified in time, and the rectification plan, implementation plan and rectification results should be submitted to the supervisor and shipowner for record on a regular basis.
4. On-site management. During the construction period, warning boats should be equipped according to the requirements of the maritime department to maintain the water traffic safety in the safe operation area day and night, and apply to the competent department for sending patrol boats when necessary to strengthen the on-site traffic command in the construction area and maintain the navigation order.
Four. Safety and environmental protection measures for the construction of main components of ships
The sub-projects of hydraulic ship construction at No.402 berth in Fangchenggang include: foundation trench, berth excavation, underwater reef blasting and drilling construction, foundation bed riprap, foundation bed compaction, foundation bed leveling and barrel floating installation. This safety and environmental protection measure is specially formulated to ensure the smooth progress of sectional works.
1, foundation trench and parking lot excavation
Dredging in this project is divided into foundation pit excavation, berth excavation and whirlpool water excavation, totaling * * * 4.09 million m3, dredging 2.42 million m3 and reef blasting 6.5438+670 million m3. Dredging and ballast pressing are carried out by 8m3 grab boat group, and reef blasting is carried out by a drilling and blasting ship modified from a 400-ton barge. Ships required: 6 grab dredgers of 8m3, 3 dredgers of 500m3, 3 dredgers of 1000m3 and 2 tugboats of 44 1kw; Three drilling and reef-blasting vessels modified from 400-ton barges.
(1) During the construction period, environmental protection laws and regulations shall be observed to reduce the adverse impact on the environment during the construction period.
(2) Strengthen the management of ships, strictly follow the Marine Environmental Protection Law, and carry out offshore construction in accordance with the relevant management regulations of the Marine Environmental Protection Law to prevent sewage and oil pollution from ships and avoid unnecessary pollution to the marine environment.
(3) The quantity and quality of excavated soil shall be reported to the marine administrative department in advance, and the construction can be started only after applying for dumping permit.
(4) Discharge mud strictly in accordance with the mud discharge area designated by the marine administrative department.
(5) Each mud unloader shall carefully record the situation in the mud unloading sea area. If abnormal phenomena are found on the sea surface, measures should be taken and reported to the relevant departments in time.
(6) Establish waste recovery, storage and treatment systems, such as the recovery of waste engine oil on board.
2. Underwater reef blasting drilling and blasting construction
The quantities of the foundation trench, front berth and reef-turning of this project are 1672242 m3, in which the quantities of the foundation trench and front berth are 184 1446 m3 and the quantities of reef-turning are 1488094 m3. The required ships are two 24HP anchor ships, two 30-60t fireworks warehouse ships and 1 traffic ships.
(1) Establish a safety management system with the project leader as the team leader, and strictly implement the relevant provisions of the Technical Specification for Blasting in Waterway Engineering.
(2) Regularly conduct on-the-job training and safety education for employees, insist on holding relevant certificates, and firmly establish the idea of safety first.
(3) Strictly implement the system of receiving initiating explosive devices and keep them strictly to ensure that the initiating explosive devices are not lost.
I believe that after the above introduction, everyone has a certain understanding of the safety management regulations and preventive measures for water construction ships. Welcome to Zhong Da for more information.