Time goes by, never stops, and a piece of work is over. Looking back on my work during this period, I must have achieved a lot. It's time to write a work summary and analyze the past work. So is it really difficult to write a work summary? The following is my summary (5 selected articles) of the job title evaluation of construction projects. Welcome to read the collection.

Summary of professional title evaluation of construction engineering 1 1. As a budget officer of the project department, I can complete the operation and management of the project department on time according to the rules and regulations of the company and the project department.

1, Internal Skill. According to the requirements of the company, the actual construction output value and cost analysis of the month are counted at the end of each month. Participate in the cost analysis meeting in time, make an analysis report on the monthly profit and loss of the project department, prepare the budget for the construction stage according to the actual situation of each sub-project on each floor, print all the quantity analysis, and distribute it to the production manager as quota labor and quota materials. In the actual construction process, according to the actual situation on site, the quantity and content of the quota will be adjusted scientifically and reasonably as the basis for manual control and distribution of the engineering task list, and the quota materials will be used as the warehouse of the quota. At ordinary times, I always actively cooperate with the project manager in contract management, participate in some subcontracting negotiations, and draft some subcontracting contracts according to the company's regulations and the actual situation of the project department. After the subcontract is signed, I will track and manage the subcontract, complete the actual construction tasks of the project department last month (including the rough tasks of subcontractors) at the beginning of each month, make statistics on the quota materials, submit relevant reports to the company, submit the main material plan for next month to the company at the end of each month, and estimate the construction output value of next month. In the process of construction, the quota acquisition and cost tracking control are implemented to provide some reasonable guarantee measures for the cost control of the project department, provide some business information and data for the project department in time, and do a good job in project cost accounting in time. Attend project meetings on time and be on duty according to company rules and regulations.

2, foreign (to the owner and supervision) work. Submit the construction progress report to the owner and supervisor at the end of each month as the basis for paying the project progress payment, check the engineering quantity with the investment supervisor in time, and cooperate with the project manager to urge the owner to pay the project progress payment last month after the progress output value is determined. Issue the engineering visa to the owner in time, do a good job in quoting some claims, especially some engineering materials, and quote them to the owner and supervisor in advance, so that after the owner's review, the materials engineer of our construction party can purchase them in time and make the project construction smooth.

In short, adhere to the business policy of maximum income and minimum expenditure. Internal strength should be timely, accurate and realistic, grasp the quota, control the quantity, and sometimes leave a certain margin; Foreign work information is complete, make full use of policies and opportunities, always handle the relationship between the owner, the supervisor and the constructor, and sometimes encounter some work difficulties, contact the leader in time to report, so as to find a better solution to the problem and strive for the maximum profit for the company.

Second, actively do a good job in engineering audit.

We have completed the settlement of Xiangyin Road and the audit of Yuqiao Garden.

Third, obey the work arrangement of the company leaders and actively do a good job outside the project department.

I always put the overall situation first in my work. Actively participate in the company's bidding work and other budget work. No matter how busy my project department is, I always obey the work arrangement of the company leader. At that time, there were many events in the project department, so I always worked overtime and used my time reasonably and scientifically, which not only completed the events in the project department, but also completed the tasks arranged by the company.

Fourth, actively adapt to and abide by the implementation of the company's various management system reforms, and further strengthen the sense of responsibility.

Since the beginning of this year, the company's rules and regulations have been improved or further improved. I always actively adapt to this situation, based on the company's current rules and regulations and the professional ethics of budget officers, strengthen my sense of responsibility, do my work well in time, and try my best to serve the enterprise.

Fifth, use the rest time after work to strengthen study.

Usually, we should pay attention to collecting the current quota documents in Shanghai and strengthen the study of business knowledge such as engineering quantity calculation skills. Study computer knowledge hard and improve your work efficiency.

The above is a rough summary of my personal work, please review it. If there are any shortcomings in my work, please point them out so that I can correct them in time and work better.

Summary of title evaluation of construction engineering 2 20xx was recognized as an assistant engineer in June 5438+February, and worked in Hebei Second Engineering Construction Co., Ltd. and Tangshan Modern Construction Engineering Co., Ltd. successively. In September of XX, I served as the chief of technical quality department of Tangshan Modern Construction and Installation Engineering Co., Ltd. During this period, I worked hard to learn professional technical knowledge, promoted "new technology, new structure, new materials and new equipment" in the process of technical management, and devoted myself to scientific and technological innovation and progress. Later, he served as assistant engineer, and successively served as technical director in Fengnan State Taxation Bureau Group Residential Community Project and Tangshan No.1 Middle School No.2 Teaching Building Project. After the completion of these two projects, they were both rated as high-quality projects in Tangshan. On the basis of being rated as municipal projects, the second teaching building project of Tangshan No.1 Middle School was also rated as high-quality projects in Hebei Province in XX years. During the years of training in the front line of construction, the professional theoretical knowledge learned in the university was quickly transformed into professional ability through integrating theory with practice. As the company's technical and quality management department, under the direct leadership of the company manager and the company's chief engineer, we meticulously carry out technical management and strictly control the engineering quality. After several years of efforts, the company has established a strict management system and obtained three internationally recognized construction enterprise certifications: quality management system (ISO900 1), occupational safety and health management system (OSHMS) and environmental management system (ISO 1400 1). It is the first company in Hebei Province to obtain three certifications. In the past five years, in the process of contributing to the development of the company, my professional and technical ability has also been enriched and improved. In a word, I have done some useful work in the past five years, but there are still many problems to be improved.

The professional and technical work in recent years is summarized as follows:

First, actively promote the use of "four new" technologies to build building products.

Xx years 65438+February, in Tangshan No.1 Middle School, the second teaching building project department as technical director. Engineering quality is the life of construction enterprises. In order to obtain excellent engineering quality, technical managers are required to have the advanced consciousness of creating excellent projects. As the technical director of the project, I will take the lead in establishing and improving the relevant technical and quality management system of the project department. According to the construction method of the project, with me as the person in charge, the project quality objectives are decomposed into various professional and technical posts, and the construction is organized according to the requirements of technical posts. A series of management systems, such as technical review system, engineering quality inspection system, hidden acceptance system, quality common fault control measures and semi-finished product protection measures, have been established successively, which is conducive to ensuring engineering quality. According to the characteristics of this project, such as large bay and large amount of concrete pouring, the formwork support adopts tool quick release system, and plastic-coated bamboo is used to glue large formwork to ensure that the gap between bamboo formwork is not greater than1mm; The joint height difference is not more than 1mm, and the surface flatness is not more than 2 mm. The ceiling plastering process can be cancelled, which not only saves cement consumption, but also completely eliminates the quality hidden danger of ceiling plastering, and realizes the double harvest of economic benefits and social benefits. The surface of internal and external wall tiles should be smooth and clean, with the same color; Joints should be filled tightly and straight, with the same width and color; The details of the roof waterproof layer have been carefully treated, and the practice is consistent and beautiful; The surfaces of doors and windows should be clean, free from scratches and bumps, and the coating surface should be smooth, flat, uniform in thickness and free from air holes; The difference in width and height between two adjacent steps of stair tread shall not exceed 10mm, the tooth angle shall be neat, and the anti-skid strip shall be straight. In the process of construction, the construction was carried out in strict accordance with the requirements of design and construction drawings, national norms, procedures and general atlas, and all sub-projects were carefully completed in accordance with the requirements of creating quality products, thus achieving the quality goal of "creating quality products with high standards and high quality". Through the direct participation and control of the technical work of the project, the quality, progress and benefit of the project have received good results. The second teaching building project of Tangshan No.1 Middle School won the best quality project (gold medal) in XX and the Hebei Quality Project Award in XX.

Two, to study professional and technical business, do a good job.

Since working in Tangshan Modern Construction and Installation Engineering Co., Ltd., all the work has been done better. After being transferred to the head of technical quality department, it coincided with the establishment of ISO900 1 quality management system. Due to tight time and heavy tasks, this comrade voluntarily gave up his personal rest time, devoted himself wholeheartedly to the compilation and revision of quality management manuals, program documents and work instructions, and worked overtime without regrets, which fully reflected the vanguard and exemplary role that a young professional and technical personnel should have. After summing up our company's experience in establishing quality management system, I formed the article "Analysis of Building Quality Management System" and won the first prize of Hebei Province's scientific paper on building system.

In his daily work, this comrade has a solid professional knowledge, a solid theoretical foundation, and works like a duck to water. He is proficient in everything from technical guidance and quality inspection and acceptance at the construction site to verification and management of construction technical data. The technical documents and all kinds of application materials formed in the work are rigorous in structure, standardized in terminology, unique in opinions and sophisticated in judgment. The technical documents sent to the city for exchange have been praised by the relevant leaders of Tangshan Construction Bureau and Tangshan Quality Supervision and Inspection Station for many times, winning honors for the enterprise.

With the gradual deepening of the company's management system reform, the company leaders decided to start the OSHMS occupational safety and health management system certification and ISO 1400 1 environmental management system certification. In the process of establishing the above two management systems, this comrade, as always, devoted himself to the compilation of system documents, initial state evaluation, identification of major hazard sources and environmental factors, and formulation of management schemes, and made outstanding contributions to the successful registration and certification of enterprises. In the process of establishing enterprise quality management system, occupational safety and health management system and environmental management system, I personally learned a lot of internationally accepted management knowledge. At the same time, as an internal auditor of the three systems, I have always worked hard for the continuous improvement of the three management systems.

Summary of job title evaluation of construction engineering 3. I have been engaged in construction work since I joined the work. From budget to construction site, from participating in technical work to presiding over construction, we finally combined our professional knowledge with practical experience in our work and successfully designed several projects. On the one hand, my work achievements have been recognized by leaders and colleagues. On the other hand, I am deeply in love with this line.

When I first joined the work, the leader arranged the budget work. I used this time to familiarize myself with the drawings and recall what the teacher taught me at school. Concretize an abstract theory. In just two months, the works are colorful. Because I basically understood the designer's intention, I remembered the drawings after reading them several times. The quota was used reasonably and the calculation was accurate. Two months later, the leader trusted me and asked me to work on the construction site.

Starting from the most basic level, I studied hard and humbly asked experienced engineers and old workers for advice, which greatly improved my practical working ability. In 2000, when the company was doing the comprehensive building project of Kaiping building materials market, I took a worker to be fully responsible for the setting-out work of the project and made the budget for water, heating and electricity for the project. I usually work hard, master a lot of basic knowledge, and also determine my position among the company's technical personnel. In the second half of 2000, when the company was doing the aquatic products wholesale market in Nanxindao, Tangshan, I became the head of plumbing technology and participated in the civil engineering technical work. Due to the tight construction period and imperfect preliminary design, I boldly innovated and put forward my own views and opinions, which were affirmed by the representatives of Party A and the owners. So I was commissioned to do most of the later design. My technical experience has increased rapidly in this project.

In 20xx, the company disintegrated for various reasons, so I applied for a job in Tangshan Sanyou Group Jidong Chemical Co., Ltd., and previously worked in the Infrastructure Department as the representative of Party A to supervise the construction quality of various construction teams. I went deep into the construction site, strictly checked, used my spare time to strengthen my theoretical knowledge, summed up the previous work, and got a deeper understanding of the construction industry. At the same time, I presided over the design and construction of the whole company's plumbing renovation, participated in the design of the company's frozen circulating water, and the project was successfully constructed, which brought huge economic benefits to the enterprise. According to the accounting of the company's enterprise management office, only one water heating renovation will save the company 65,438+10,000 yuan every year.

In 20xx, the leader put me in charge of the company's infrastructure team. Infrastructure team 150 people, basically covering all temporary employment of the company, responsible for internal infrastructure construction and equipment maintenance. After I arrived, I quickly became familiar with my work and quickly entered the role. Successfully completed more than ten overhauls organized by the company. In recent years, the company has many technical transformation, technical measures and expansion projects. I led the infrastructure team to complete several major renovation projects, such as new refrigeration project, new fractionation project, new polymerizer project, new drying project, new 42% alkali project and new rectification project. After the completion of the project, all qualified, get the praise of colleagues and company leaders.

Autumn 10 is the harvest season, and I am facing new challenges. The company will build a new oxygen and nitrogen production workshop, and at the same time, several units will be moved to a new location, and the construction period is very tight. But I am not afraid, but I am happy to meet it, because this is my favorite job, my career and my tomorrow!

Summary of the evaluation of the title of architectural engineering 4 20xx In July, I successfully completed my studies, graduated from Inner Mongolia Vocational and Technical College of Architecture with a major in engineering cost, and entered the construction industry in the same year. I have been engaged in project cost work since I joined the work. The summary is as follows:

First, learn professional knowledge and improve job skills:

20xx officially joined the work in July. At the beginning of my work, I found that the professional knowledge I learned at school was very different from the actual work. In order to change my role as soon as possible and adapt to the work requirements, I study hard the professional knowledge of engineering cost and improve my job skills. In a short period of six months, through my own efforts and the help of my colleagues, I can skillfully carry out more complicated daily affairs of project cost.

Second, the political thought:

Politically, I am strict with myself, actively participate in various political activities, consciously study political theory, have a strong sense of overall situation and organizational concept, put my career first in my work, regardless of personal gains and losses, put my position in a new position, put highway construction and the interests of the broad masses of the people first, and strive to practice the fundamental purpose of serving the people wholeheartedly. Be fair, just, just and upright in the work, have strong professionalism and dedication, work hard, be proactive, have a down-to-earth style, do not shirk, and stress efficiency. Pay attention to investigation and study, be diligent in thinking, have clear working ideas and be able to integrate theory with practice.

Third, organization and coordination:

In practical work, I study hard to analyze, study and solve problems with Marxist standpoints, viewpoints and methods, and have certain organizational coordination and scientific decision-making ability. Pay attention to learning modern management knowledge and master the general laws of humanities and social science management. It can assist department heads to do a good job in the ideological and political work of employees, which provides a guarantee for the effective development of departmental work.

Four, work management:

1, cost control

Project management runs through the whole construction process. In project management, we should conscientiously do a good job in pre-control, process control and post-tracking First of all, we should be familiar with the construction drawings, technical requirements, specifications and standards, which are the basis of engineering construction and the standard of quality inspection. Before quality inspection, we must understand the design intent and do a good job in quality management. In the process of construction, make full use of supervision, strengthen on-site inspection, deal with quality problems decisively, arrange special personnel to follow up and be responsible, and don't go through the motions carelessly. If problems are found, they are all shortcomings of quality management, and we must pay the price for quality problems so that the construction unit will not dare to make it again.

Step 2 go deep into the scene

Fully grasp the engineering dynamics. Settlement audit can not only be the calculation audit of drawings and engineering changes, but also go deep into the site and check carefully to ensure the quality of engineering settlement. The cost engineer should master the engineering trends and know whether the project is constructed according to the drawings and engineering changes, whether some negotiations have not been carried out, whether some removed parts have not been notified of changes, and whether changes have been made on the basis of changes. Find problems and check them one by one on the spot.

Step 3 review

The quality control of audit process is the core of the whole audit quality assurance, which plays a key role in the quality control of audit process, ensuring audit quality and reducing audit risk. When determining the project cost, we should adhere to the current valuation standard as the basis, and review it according to the provisions of the construction contract and bidding documents, as-built drawings, site visas and design changes.

Five, the study of professional theoretical knowledge:

Rich professional knowledge is the premise of engaging in professional and technical work. Since becoming an assistant engineer, I have been constantly summing up experience, constantly enriching my professional theoretical level and practical construction ability, and strengthening the study of professional theoretical knowledge.

Since taking office, through the training and education of the company, the guidance and help of leading colleagues, personal unremitting efforts and open-minded study, my political consciousness, ideological and moral character, work ability, professional level, management ability and management level have been continuously improved, and my comprehensive quality has also made great progress. I have made a series of achievements in highway construction and management, and accumulated rich practical experience in highway technology, highway construction and highway construction management. I will, as always, do my job well, constantly strengthen the study and improvement of professional knowledge, and improve the comprehensive professional quality.

Six, continuing education and learning:

After the evaluation of assistant engineer, he participated in continuing education for three years.

Seven. Existing problems:

The above is a brief description of my technical work in recent years. Through learning from books, learning from practice, learning from others, plus my own analysis and thinking, I have indeed made great gains and progress. However, achievements and shortcomings coexist, and experience and lessons keep pace. There are not many representative works and highlights, insufficient innovation, insufficient decision-making ability and level, and few major achievements.

In the future, I will, as always, go all out in my work, keep learning, strive for progress, constantly improve my professional quality, exercise my work ability and sum up experience.

Summary of title evaluation of construction engineering 5. I graduated from University of Science and Technology in 20xx with a four-year undergraduate degree. Then I worked as an engineer in the construction team. Outstanding performance in "virtue, ability, diligence and achievement".

First, political thought and moral quality.

First of all, we should actively demand ideological progress, keep up with the pace of the times, seriously study the principles and policies of the party and the state, and understand the latest social trends. Although I haven't joined the China * * * Production Party, I have always been strict with myself according to party member's standards, consciously accepted the supervision and help of party member and my colleagues, and made unremitting efforts to overcome my own shortcomings and make up for them, so that I can stand the test in the long years to come and join the great China * * * Production Party as soon as possible.

As an engineer, I have always adhered to the professional ethics of engineers, and strived to find the greatest intersection and balance between administrative means, the interests of developers and the needs of the masses, so that every project I am responsible for is truly pragmatic. Therefore, it is the basic principle of my work to treat every project seriously and attentively. This point has also been unanimously recognized by the planning bureau and hospital leaders.

Since I joined the work, I have a strong sense of ownership, closely linking the development of the company with my own development. I always abide by the company's rules and regulations, actively obey the leadership's work arrangements, successfully complete various tasks, and safeguard the collective honor. Work hard at work, study relevant professional knowledge, sum up work experience and skills, and constantly enrich and improve yourself. At the same time of self-improvement, we also strive to shoulder the burden of "academic leader" of the unit, organize colleagues to summarize exchange projects at ordinary times, help new colleagues enthusiastically, enhance the cohesion of the unit and promote the overall progress of the team.

Second, the intermediate title of construction engineering technology

Since taking up my present post, I have been determined to forge ahead, work hard, obey the leadership, obey the arrangement, abide by the law, unite with comrades, be helpful, care about the collective, be conscientious, down-to-earth, be loyal to my duties and do my duty. Actively participate in political and professional studies, attend classes on time, leave early and return late, pay attention to moral cultivation, actively fulfill the obligations of party members, earnestly perform the duties of first-class teachers, coach and train young teachers to participate in education and teaching reform, and guide teaching research.

Do a good job in students' work, behave in a more standardized way, be a teacher, behave in a standardized way, and be responsible for students. In our work, we put our love for students in the first place. The relationship between teachers and students is harmonious, and we are comfortable with our work. Many things have been solved. We love, respect, trust, care and cherish students, and treat them equally regardless of their grades. Give more enthusiastic help and care to students who are withdrawn. Therefore, the teaching achievements are outstanding, the students' moral character is excellent, and the education and teaching work is well completed. Therefore, it has won the trust and respect of leaders and teachers.

In education and teaching, we are dedicated to our posts and strict in teaching. In classroom teaching, I insist on studying the syllabus carefully, analyzing the intention of compiling teaching materials carefully, preparing lessons carefully, paying attention to designing the teaching methods of each class, studying the application of modern educational technology in classroom teaching, and paying attention to cultivating students' various abilities. At work, learn with an open mind, don't be ashamed to ask questions, digest in time, absorb the essence of others, practice in your own teaching, and constantly sum up and improve.

Three. Work performance and performance of duties

Since I joined the work, I have always been on the front line of engineering construction, and participated in many projects such as Shi Sheng Binjiang and Shi Sheng Building. In practical work, I have always maintained a serious and responsible working attitude, studied hard with an open mind, constantly strengthened my theoretical knowledge and improved my professional level. After seven years of training, I have grown into the backbone of engineering technology. In these projects, I can combine theoretical knowledge with practice and guide practical activities with theoretical knowledge. Cooperate with the construction unit to successfully complete the project on the premise of ensuring the quality and safety of the project. After delivery, it was well received by users and supervised by relevant units.

In order to reach a new level, I sincerely hope to be promoted to an engineer with intermediate title, so as to better carry out my work and serve the society. Although I am serious and responsible for my work, my theoretical knowledge and professional level have improved rapidly, but the construction industry is a deep and wide-ranging industry, and my management ability and overall ability need to be further improved. I will, as always, be meticulous and diligent in my work, study hard for professional knowledge, keep improving my business, be brave in innovation, constantly strive to enrich my theoretical knowledge, improve my working ability and strive for greater progress. After working for six years, I have been trying to be an excellent technical manager of construction engineering and contribute my strength to the construction industry.