The registered address of the company is Jimo Road 1, Pudong New Area, China. Its main producing areas are located on the banks of Huangpu River in eastern Shanghai, the south bank of Chongming Island in the Yangtze River estuary and the south bank of the Yangtze River in Jiangyin City, Jiangsu Province, covering an area of more than 2.8 million square meters with a total length of 4,782 meters.
Chengxi Shipping Co., Ltd. has strong technical force and advanced technology development capability. Among the nearly 7,000 employees, there are about 2,000 middle and senior technicians. The company always regards the management concept of quality first as the lifeline of survival and development, and has passed the ISO 900 1: 2000 quality management system certification of China Classification Society Quality Certification Company (CSQA) and Lloyd's Quality Certification Company (LRQA) respectively, and established a set of quality management system. The company introduced advanced ship design system software, and developed SB3DS ship design system software on the basis of digestion and absorption. CAD and CAM technologies are widely used, with a first-class ship building technology center and advanced design methods.
The company has 50,000-ton and 70,000-ton berths 1 unit, 50,000-ton and 6,543,800-ton dry docks 1 unit, 6,543,800-ton and 23,000-ton floating docks 1 unit, and 5 floating docks from 30,000-ton to 6,543,800-ton. Since the founding of the People's Republic of China, the company has built more than 500 offshore oil drilling platforms and refrigerated ships, container ships, multi-purpose ships, bulk carriers, timber ships, passenger ships, chemical ships, refined oil ships and special operation ships for domestic and foreign shipowners, and repaired and modified nearly 10,000 ships of various types (below1.20,000 tons). At present, more than 500,000 tons of ships are built and ships are repaired 1 ship. The company takes "ship repair is the first in the country and shipbuilding has its own characteristics" as the strategic goal of leap-forward development. As one of the five ship-repairing bases of China State Shipbuilding Corporation, the first-phase construction project of Chongming ship-repairing base has been basically completed. After the completion of the second-phase construction project (marked by large-scale ship repair and dry dock), the ship repair capacity will double.
The company advocates advanced culture, pursues advanced management concepts, business concepts and talent concepts, establishes the overall situation of unity and harmony, and the moral concept of honesty and trustworthiness, persists in strengthening the construction of two civilizations in enterprises, increases the cohesion of employees internally, shapes the good image of enterprises externally, and continuously enhances the core competitiveness of the company.
Go to his website/this is the website of Jiangyin West.
Please refer to both.