Current location - Education and Training Encyclopedia - Graduation thesis - Annual work summary of quality supervisor.
Annual work summary of quality supervisor.
Annual work summary of quality supervisor.

The purpose of quality supervisor's annual work summary is to improve product quality and establish a good brand. Annual work summary, quality supervisor, I brought it to you, I hope it will help you.

The first article: annual work summary, quality supervisor, time flies. On this day of saying goodbye to the old and welcoming the new, I look back on my work in the past year. With the support and help of company leaders and colleagues, relying on my own professional foundation and work experience, in accordance with the company's unified deployment and requirements, closely surrounding the "eternal" construction project, with the goal of low consumption, high efficiency, high quality and on schedule, I fully fulfilled the management functions of the engineering department. Be brave in innovation, coordinate and cooperate, work hard, do everything possible to ensure the realization of all the established goals throughout the year and better complete all the tasks assigned by the company. The overall construction of the engineering department has also jumped to a new level. The work in 20XX years is briefly summarized as follows:

I. Completion of tasks throughout the year

1. It is both an opportunity and a challenge for me to get in touch with ground source heat pump at the beginning of the year, and it is more important for me to meet such a challenge. To this end, I use my spare time to collect and learn more about ground source heat pump, so as to consolidate my professional knowledge and meet the challenge.

2. Since mid-March, I have assisted General Ye and Coral Sand Community in more than ten rounds of negotiations on site leveling. Finally, the two sides decided to implement it in the following three steps:

1 Both parties determine the earthwork quantities of A30, A29 and A33, in which A30 is 120000M3 and A29 and A33 are 60000M3.

Both parties shall specify the construction contents: drainage, dredging and earthwork construction.

3 Both parties have made it clear that the unit price of earthwork leveling is 18 yuan /M3. .

Finally, the two sides decided that the total price was 3.5 million yuan (paid in one lump sum).

3. In mid-March, the bidding work of pile foundation construction unit and supervision unit was ready.

4. The measured municipal elevation provided by zhijiang city Construction Bureau is inconsistent with the actual municipal road elevation, and the four-line diagram provided by the plan is inconsistent with the actual surveying and mapping data of the parcel, which is then reflected to the design institute, which adjusts the overall evaluation with the measured data.

5. Draft the supplementary agreement and earthwork leveling contract between the supervision unit and the pile foundation unit.

6. In the process of cooperating with Pan Xiao in applying for the construction permit, in the early stage of bidding, I conducted a comprehensive understanding and research on the bidding work and became familiar with the policies and regulations of key links.

7. Solve the water and electricity problems at the construction site.

In mid-August and mid-July, due to the tight time and heavy workload of site leveling in A30 Bid Section, I arranged all the work of site earthwork leveling, and adopted the methods of stubble pressing, interlocking and overall promotion, and timely connected the upper and lower links to ensure the normal development of pile foundation construction.

9. In the process of pile foundation construction, due to the complicated geological conditions, the design length of pipe pile does not meet the actual geological requirements. I organized personnel to carry out geological exploration again, which overcame the difficulties of water cut, power cut and temporary construction, helped the exploration unit complete the geological exploration task on time, and ensured the smooth progress of pile foundation work.

At the beginning of 10 and 12, the foundation pit support and earthwork will be started. Due to the tight construction period and the heavy tasks of foundation pit support and earthwork, the construction unit has to carry out a lot of night construction besides daytime construction. In order to ensure the construction progress, I often go to the site to follow up the construction under unfavorable natural factors such as 12 winter night and rainy day, and track it day and night to coordinate and solve it for the construction unit at any time.

Because of the complexity involved in the construction, I haven't had a day off since the project started. I have to leave the construction site after 9: 00 every night, giving up the opportunity to rest on holidays, and always insisting on timely coordination and solving various problems encountered in the construction.

Second, the work plan for next year

1. Strengthen self-study and improve professional level.

Years of accumulated work experience have made me feel a heavy burden on myself, and also made me deeply feel the importance of learning. Only by constantly maintaining and improving one's work and study ability can one have sustained fighting capacity and work innovation ability. Over the past year, I have worked hard to broaden my personal knowledge, strengthen my study of real estate specialty and related legal knowledge, strengthen my understanding of the context and trend of real estate development, as well as the surrounding environment and the development of the same industry, deeply understand the overall planning of the company, and know all kinds of situations of the company like the back of my hand. In the coming year, I will continue to take study as an important work plan to improve my practical working ability and professional quality, adapt to the development of the times and the company, and contribute my due strength to the development of the company.

2. Strive to grasp the engineering quality of the "Eternal" business center project.

"Eternal" business center project is a key project in the city, and it is particularly important to grasp the quality of the project. In management, I always adhere to the concept of "carving by digging", comprehensively implement refined and scientific management, conscientiously implement various measures to create excellence, carefully do every working procedure and every link, and strictly supervise and control. While assisting the engineering supervision company, it has gradually formed its own engineering quality supervision system. With supervision as the main task and self as the supplement, we will strive to build the "eternal" business center project into a provincial excellent project.

3. Complete the basic project of "Eternal" business center project.

In the next year, in order to successfully complete the main project of the "Eternal" business center project, especially the basement and waterproof layer construction in the main construction stage, considering the rainy weather in Hangzhou, we will improve the company's capital utilization rate and save the company's resources, such as using small well point precipitation to overcome the problems of high groundwater level and rainy season construction during the construction process, and successfully complete the foundation project.

Looking back on the work in the past year, although some achievements have been made and affirmed by the company leaders, these achievements can not be achieved without the support and help of the company leaders, the encouragement and help of various brother departments and the efforts of the engineering team to sum up the achievements. I still see many shortcomings, such as strengthening the on-site management experience and better improving the company's resource utilization. The summary of the results only makes me face the actual work situation more objectively, and also encourages me and my team members to make persistent efforts to achieve better work results next year and make progress and growth together with the company. I hope leaders and colleagues will criticize and correct me.

Part II: Annual Work Summary of Quality Supervisor I. Annual Review

Looking back on 20xx years, through one year's work and study, my working ability has been improved to some extent. In particular, the electrophoresis purity detection technology of salt-soluble protein of corn seeds has made greater progress, and the membrane made is clear and accurate, which can distinguish seeds. From September 2005 to the last year of 2009, according to the general arrangement of the head office, I took the post of seed quality inspector, mainly responsible for seed germination rate, moisture, purity and sampling. I know that no matter what position I am in, I will try to be a good waiter for leaders at all levels, business departments and seed industry. Over the past year, I have practiced my ideas from three aspects, striving to be better, stronger and more in place. Next, I will briefly report my work in the past year to leaders at all levels.

1, study hard and improve your quality in an all-round way.

The work of quality inspection room is a special post, which needs to constantly update knowledge and improve skills. In order to meet this requirement, I attach great importance to learning, and basically achieve "reading 10,000 words a day and learning a book a month". Over the past year, I have carefully studied the guiding ideology of Theory of Three Represents and Hu Jintao on building a harmonious socialist society, and devoted myself to practical work with full ideological enthusiasm. Strive to build a harmonious socialist society and Theory of Three Represents Theory with practical actions, so that this great spiritual strength can be transformed into my full enthusiasm and work enthusiasm. Actively cooperate with business departments and processing plants. Discuss with them to solve the problem of low germination rate after seed coating.

2. Work hard and successfully complete all tasks.

In the past year, it was very difficult to test the seed quality of non-professional students, but I actively responded to the difficult challenges, including germination rate test 120 times, moisture test 32 times and purity test 4 times (no official report). According to the requirements of the leaders, every time a batch of seeds is put in, a sample is planted according to the sampling standard, and the germination rate, moisture and purity are all done in turn. According to the application of various business departments, the germination, moisture and purity of stored seeds, self-propagating new seeds and purchased seeds were tested in time and seriously.

While doing a good job in the indoor investigation, I also systematically studied the field investigation, and assisted Director Hu Jibin in the field investigation of Qihe Jiangtun Breeding Base. When cotton seeds are ripe, they also go to the site to buy, sample and seal samples three times with all the staff in the quality inspection room.

When sorting corn materials, Comrade Ni Feng often takes time to help copy seeds, bag them and sort them out. He also used his spare time during the experiment to help Comrade Chen Jian disassemble, copy seeds, bag and box small cotton materials.

After work, when the processing plant is short of manpower, I often help temporarily to complete the unpacking and packaging of cottonseed before coating processing. Also participated in the storage and transportation department's cooling and drying work of cotton seeds before land reclamation (mainly referring to the first batch of cotton seeds produced in Qihe Jiangtun).

3. Be positive and correct in daily life and work attitude.

Over the past year, I have been able to consciously abide by the rules and regulations of the head office. At work, don't be late, don't leave early, take the initiative to ask for leave, respect leaders, unite colleagues, treat others sincerely and work hard. Efforts: First, self-discipline according to regulations. I will never do what the leader forbids, but I will try my best to do what the leader asks. China Paper Union will not violate the rules and regulations, and will be a competent seed quality inspector. The second is to use system self-discipline. I strictly abide by the rules set by the head office. In terms of economic expenditure, we must resolutely ask for instructions before we act, not first. You can also take a positive attitude towards your work and work hard to finish it, so as not to be offside and not in place. In the work coordination with other colleagues in the quality inspection room, we have achieved mutual understanding, mutual help, mutual learning and sincere treatment, established friendship and gained many useful inspirations. I know that behind the achievements are the efforts and struggles of all the staff in our quality inspection room. In the future, I will still treat extraordinary things with a normal heart, be brave and enterprising, and do everything well as always.

Second, the main problems

Looking back at my own problems, although I can work hard and make some achievements, there are still many places that need continuous improvement and perfection. I have been working hard to do well. This kind of performance mainly includes: first, due to the lack of professional knowledge and experience in the work, the solutions to some problems are too simple and the working methods are too simple; Sometimes, we look at problems one-sidedly, and we are not calm enough to deal with some problems. Second, it is necessary to further strengthen the planning, systematicness and scientificity of seed inspection and improve the ability of comprehensive analysis and problem solving. Thirdly, in the electrophoresis experiment, the technology has not been fully mastered, and now we can only judge the consistency of seeds, and the purity analysis of parents of maize hybrid seeds needs to be further improved. Fourth, on the basis of completing the tasks assigned by the leaders, we should give full play to our own advantages, continue to strengthen the study of professional knowledge, and further improve the inspection skills of various seeds.

Three. Work plan for 20xx years

In the new year, I am determined to seriously improve my business and work level and contribute to the leap-forward development of the company's economy. Next, I will learn work and management experience from other colleagues and colleagues with an open mind and learn good working methods; At the same time, in my spare time, I will work hard to learn business theory knowledge, expand my knowledge, and constantly improve my professional quality and management level, so that my comprehensive quality can be improved to meet the development of the company and the needs of society. It is necessary to further strengthen the professionalism, enhance the sense of responsibility and improve the level of work completion.

I think I should try my best: first, according to the requirements of the leaders, strengthen study and master the seed electrophoresis detection technology as soon as possible;

Second, broaden professional knowledge, participate in all kinds of seed inspector qualification training and examination, and make yourself a qualified seed inspector as soon as possible; Third, seriously study and implement the seed quality control system, work hard, accept the routine and temporary tasks arranged by the company, and finish them in time; Fourth, the inspection instruments should be operated correctly, cleaned in time, registered in time, and maintained daily; Fifth, I love my job, continue to study relevant laws and regulations, redouble my efforts in political thought and professional knowledge, and improve my theoretical level and legal awareness.

In short, state of mind determines state, and state determines success or failure! Responsible for the company, caring for the society, persistent in work, enthusiastic about colleagues and confident in yourself! Be the best of yourself!

Part III: Annual Work Summary of Quality Supervisor: Under the leadership of the company and the Quality Control Center, all front-line personnel of our quality inspection department have done a good job in product inspection and testing, fulfilled the basic duties of inspectors, and done a lot of work to ensure the normal operation of the whole factory and product quality control, and at the same time ensured the normal operation of the quality system. Looking back on the work in the past year, we have done some work mainly from the following aspects.

I. incoming inspection of products

1. Quality control of raw materials With regard to the service life of products, we control the quality of products from the source by strictly controlling the entrance. For all purchased raw materials, firstly, the inspection system shall be carried out according to the regulations, and the inspectors shall confirm the quality certification documents submitted by the suppliers, inspect the appearance, size and other aspects, and conduct mechanical performance tests when necessary.

2. Improve the transparency of inspection. Carry out product inspection as soon as possible according to the inspection quantity, and issue inspection reports in time, so as to facilitate the warehousing procedures of the warehouse, increase the transparency of inspection, and strictly implement the quality inspection standards. On the premise of meeting the quality requirements, product inspection is responsible for the company and does not harm the interests of suppliers.

Second, the inspection of semi-finished products

1. Semi-finished products have wide detection range and high precision. In order to ensure the quality of products, we implement a full inspection system for products, strictly control the inspection process, implement a system of being responsible for the results, and strictly implement it. All employees' products are passed through the inspector's hands, which embodies a lot of efforts of the inspector. I don't know how many days and nights of overtime work have sacrificed the rest time of the inspectors.

2. Strict process control procedures. Products with process flow can only be released after going through relevant formalities according to Product Process Control Procedure, and the previous process is responsible for the next process, and the next process is responsible for the re-inspection of the previous process, so as to ensure the checks at all levels.

Third, its own shortcomings.

1. Occasionally I will make mistakes in my work because of carelessness, which will bring unnecessary trouble to my work. In the future, I will finish my work seriously with a rigorous working attitude.

2, because of personality reasons, others are not active enough. In order to complete the work more perfectly in the future, I will take the initiative to communicate with my leading colleagues. I hope to learn from them what they can't learn in textbooks through conversation.

Since I left school and stepped into this historical stage, I feel this society is very strange for the first time. Whether it's work or interpersonal relationship, everything is very difficult for me, a novice. After these months of baptism, I really grew up a lot.

;