Time flies and a piece of work is over. Looking back on my work during this period, I must have gained a lot. It's time to write a work summary. How to write a work summary to give full play to its role? The following is a summary of the professional technical work of engineering supervision that I have compiled for you, for reference only. Let's have a look.

Summary of professional technical work of engineering supervision 1 In terms of on-site supervision, the construction and acceptance of planting soil roof, indoor wooden hanging board, ground decoration project, multifunctional exhibition hall, aluminum-plastic curtain wall installation and atrium landscape project are supervised in strict accordance with the quality acceptance standards of each process.

In terms of quality control, due to the tight construction period required by Party A, Guangdong manufacturers are responsible for materials and personnel during the construction of wooden hanging boards. In order to catch up with the progress, the construction unit constructed non-professional carpentry construction, and the flatness and flat-fell seam after installation could not meet the specification requirements. During the on-site supervision, we promptly stopped the construction unit from blindly catching up with the progress, and reported the actual situation and existing quality hidden dangers to the engineering minister of Party A.. Finally, the construction unit and the wooden hanging board production and installation unit are willing to increase the cost and send more professional installers in time.

In terms of planting soil roof construction, the engineering department of Party A requires outdoor landscape units to complete the planting soil and landscape engineering construction of the roof at the weekly meeting. In order to catch up with the progress, the construction unit did not submit to our supervisor the relevant documents and materials of the qualification and construction scheme of the construction unit, and Party A did not issue us a landscape contract signed with the construction unit. For this problem, I sent a work contact form to Party A in time. In order to supervise the site materials and construction quality as required, Party A was asked to issue a roof landscape construction contract for us, but Party A told us that the contract had not been signed yet. In this case, the construction unit purchased the materials by itself, and all the materials used on site had no contract basis. We immediately stopped this behavior, and promptly reported the situation to Song Ni, the head of Party A's cost department, indicating that the supervision unit had no basis for controlling the use of materials on site. Finally, the cost department of Party A increased the procedures for the identification and approval of material prices, which effectively controlled the quality of on-site construction.

On-site coordination, actively coordinate the process connection between the participants of interior decoration, facade glass curtain wall and atrium landscape construction to ensure the smooth completion of the project.

In the aspect of engineering quantity audit, in strict accordance with the requirements of design and drawings, combined with the actual situation on site, the engineering quantity and economic visa were audited in time and accurately, and the project supervision was finally completed successfully.

Summary of professional technical work of engineering supervision 2 Dear judges:

Hello everyone!

I graduated from Guizhou University in September 20xx, majoring in thermal energy and power engineering. Since my work, I have participated in the supervision of many major power engineering projects. Here is a brief introduction to the top ten projects that have participated in construction and supervision.

From June 20xx to March 20xx, he was the supervisor of Pinghe Thermal Power Project, the first phase of Tongzi Coal Chemical Industry in Guizhou Province. April 20xx-July 20xx, Sichuan Shuanglong ±800kV high-voltage converter station project, as supervisor. August 20xx-March 20xx, Zhejiang section of Lingzhou-Shaoxing ±800kV DC transmission line project, responsible for the professional supervision of the project. 20xx Since March, I have worked as a professional engineer in the 800 kV converter station project in northern Shanxi.

Through the study of several projects, I can skillfully use the relevant rules and regulations, have a deeper understanding of this work, enrich my professional level, and my efforts have also been affirmed by the leaders. In addition, after work, I also participated in some learning and training activities, including quality system training and safety system training organized by the company. After studying, my practical knowledge has been better sublimated and my theoretical knowledge has been enriched. Under the guidance of experts, I formed papers on some in-depth discussions, which prepared rich practical experience and theoretical basis for my work. Since I joined the work, I have studied hard, actively linked with reality, and diligently summarized. Under the careful instruction of many industry predecessors, my business ability has made great progress. Through more than 7 years' working practice, I already have the working ability and evaluation qualification of an engineer. I will continue to study actively in my future work, improve my working ability, and at the same time strengthen the study of extended disciplines and interdisciplinary subjects, and strive for higher goals.

Through more than seven years' working time, I have consolidated and systematically mastered the professional basic theory and professional knowledge, and constantly improved my professional, engineering archives and safety management level in practical work. Proficient in understanding, mastering and using laws and regulations, technical standards and specifications, project supervision and project files related to the specialty, as well as relevant professional knowledge and communication and coordination.

After more than seven years of major national UHV projects, I have not only greatly improved my professional level and accumulated rich work experience from the front-line project supervision work, but also exercised my hard-working professionalism under difficult conditions. In the future work, I will study harder, work harder, constantly improve my professional level and make contributions to China's electric power construction.

Summary of professional technical work of engineering supervision 3 I joined the company at the end of 20xx after graduating from university, and have been engaged in the supervision of power transmission and transformation projects in Nanjing Engineering Supervision Department since then. During these five years, I participated in 220kV Ningdongnan-Huake double-circuit transmission line project, 500kV Huaneng Jinling Power Plant Phase II-Longwangshan transmission line project, 220kV Jinling Power Plant Phase II startup and standby power supply temporary transmission line project, 220kV Dongyang-Rongdong line reconstruction transmission line project, 220kV Huake transmission line project-Hushu traction station transmission line project, 220kV Suzhuang transmission line project-Hushu traction station transmission line project, 220kV 35 kV Great Wall Substation Step-up Substation Project, 35kV Jiangning Road Horizontal Line Reconstruction Project, 220kV Suzhuang Substation xx0kV Supporting Outgoing Project (Suyang Line) and Suzhuang Substation xx0kV Supporting Outgoing Project (Sugao Line). With the support and help of leaders and colleagues, I have made certain achievements in thinking, work and study, and my overall quality has also been improved to a certain extent. I summarize here as follows:

First, study hard professional knowledge and do a good job in a down-to-earth manner.

At work, I constantly learn cultural knowledge and professional knowledge, further improve and enrich my knowledge structure, and strive to improve my knowledge level and professional quality. Every time the new norms and standards of the power industry are issued, I study and study them carefully in time, strive to master them as soon as possible, and apply them to engineering construction, constantly summing up experiences and lessons. In order to master more business knowledge, I participated in the site supervision of several key projects, and have been studying in the construction front line, accumulating rich construction experience. Then, through systematic study, my comprehensive quality in engineering technology and project management has reached a new level. In learning, I have been strict with myself since I joined the work, and I take my work seriously. Although the working conditions are very difficult, it is an opportunity for us young people to exercise and challenge ourselves. I always keep in mind that I should keep learning in my work and combine theory with practical work well. In the process of work, I constantly ask my experienced colleagues for advice and study, and apply what I have learned. I also collect and sort out some information in the course of my work and turn it into information for future use. In my spare time, I read some professional books, check some professional websites, learn and master some advanced professional and technical knowledge, and improve my comprehensive ability. In my future work, I will improve my quality through continuous study and practice, so that my progress can be synchronized with the development of society to meet the needs of my work.

Second, study hard new knowledge and arm yourself with knowledge.

While doing my job well, I am constantly learning new knowledge and trying to enrich myself. The achievements since 20xx are as follows:

Attend training and study in 20xx years and obtain supervisor certificate; In the same year, he obtained the title of assistant engineer; 20xx years, obtained the witness certificate through study; In 20xx, he was awarded as an advanced individual by Nanjing Engineering Supervision Department; In 20xx, he obtained the national second-class constructor certificate through study.

Generally speaking, in the front-line work of electric power construction in the past five years, I have applied my professional and technical knowledge to practice and achieved some results. I have certain professional and technical working ability, but there are still many shortcomings to be improved. In my future work, I will strengthen my study, overcome my shortcomings, and strive to continuously improve my professional and technical level to better meet the needs of modern electric power construction.

The above is my professional summary since I have been engaged in power transmission and transformation for more than five years. Through technical summary, we can see our own shortcomings and defects while affirming our own work, improve and improve them in future production and work, and constantly create our own professional and technical value. A threesome must have a teacher. I firmly believe that we can learn from each other and consult each other in our daily work, and our professional level will certainly go up a storey still higher. Never too old to learn, knowledge is infinite, and learning can't stop. In the future work, I will devote myself to my work with full enthusiasm, give full play to my technical expertise in the electric power construction industry, create higher economic benefits for enterprises and make greater contributions to enterprises and the country.