For example:
(1) When the signal is turned on, the signal light is broken. If you want to turn on the guidance signal after the train approaches, you must manually unlock it and wait for 3 minutes before guiding the train.
(2) After the signal is turned on, if a switch section fails in the route, the track relay loses excitation and falls, and the route cannot be unlocked, so it can only be unlocked after the fault is repaired;
(3) Once some protection paths in the 6502 electric centralized circuit are disconnected, they can't be found during normal operation, and they can't play a protective role again after disconnection. The first two items affect efficiency, and the latter one is not conducive to safety, both of which need to be improved.