I. Overview of the Project
X county government business building has a construction area of 8492.64㎡, a building height of 19.2m and a five-story frame structure, and is a multi-storey public building. The design life of the building structure is 50 years, the safety level is Grade II, and the seismic fortification is classified as standard fortification (Grade C). The basic design level is Grade C. ..
At present, the foundation project of X county government business building has been completed since it started on April 6th. At the end of July, the main structure was capped, and the second and third floors of masonry were basically completed. According to the progress of the project, the masonry of the whole project was completed this year 10. Part of plastering and part of installation works will be completed by the end of this year.
The main building structure of the cadre turnover house project in X county is a four-story frame structure with a total construction area of 1965.24㎡, which is a multi-story public building. The reasonable design life of the building structure is 50 years, the safety level is Grade II, the seismic fortification crack is Grade VII, and the foundation design level is Grade C. ..
Since the construction of the cadre turnover room in X County started on July 6th, the foundation excavation, foundation pile caps and foundation frame columns have been completed. It is expected that the foundation will be completed by the end of July, the main body will be capped before mid-September, and the infilled wall and local plastering will be completed before mid-October/kloc-0.
Second, the supervisor's work.
According to the requirements of the supervision service contract, after the two parties signed the supervision entrustment contract, the overall objectives of project quality, progress and investment supervision were determined, and the project supervision department was established. According to the supervision contract and the Code for Supervision of Construction Projects, the list of supervision projects is decomposed, and the responsibilities of the chief supervision engineer and professional supervision engineer are defined. Make the supervision work institutionalized, standardized and standardized to ensure the smooth implementation of the supervision task.
With the strong support of the owner and the company, the supervision of this project is progressing smoothly. In the whole supervision project, we strengthened and standardized the management of the supervision itself, strictly implemented various rules and regulations, and ensured the project quality and the earnest performance of the contract.
At the same time of strict supervision, in view of the problems existing in project construction and management deficiencies. Intensified the intensity of "strict supervision" and strengthened the power of sideline patrol; More reasonable suggestions were put forward, and "prior supervision" and "active supervision" were strengthened. In the process of supervision, 100% concealed works and key parts were observed, and the engineering quality problems were eliminated in the bud.
Third, the project supervision and management
Examination and approval of the overall commencement report and the commencement report of sub-projects: Our supervision department will examine the contractor's labor, materials and machinery input, the rationality and feasibility of the construction scheme, the concrete measures to ensure quality and the construction of the contractor's quality inspection system in strict accordance with the requirements of ensuring the construction period and quality and meeting the contract conditions.
The handover of sub-projects is the focus of supervision's daily work and quality control of engineering construction. The supervision department shall conduct a comprehensive inspection of the previous working procedure first, and confirm that it meets the relevant requirements after treatment, before it is allowed to move to the next working procedure.
The supervision department conducted a strict inspection on the ex-factory certificate, model, specification and ex-factory date of the materials entering the site for this project. After the arrival of raw materials, the contractor shall conduct re-inspection and supervision sampling inspection in strict accordance with the specified batch, so as not to miss the inspection, and make clear the parts where the materials are used.
The problems found by the station and patrol should be notified orally at the scene in time, requiring the construction unit to rectify. If the problem is serious or the contractor fails to make rectification as required, the supervision department will issue a notice to the supervision engineer. All the quality problems found were rectified under the supervision of the regulatory authorities and ordered to be closed.
Fourth, the project schedule management
Overall construction progress plan, phased construction plan and monthly construction plan reported by the construction unit. The supervision department has comprehensively considered the requirements of the contract period and the principles conducive to the project quality. In view of the reasonable input of labor, materials and machinery required to complete the plan, to ensure the construction plan and quality assurance of the contractor's planned completion, the supervision department made a reasonable adjustment reply after detailed examination. When the construction period is tight, the construction unit is required to reverse the construction period, and the contractor is required to invest the necessary equipment, manpower, material resources and financial resources, organize scientifically and manage strictly to ensure the normal progress of the construction.
Verb (abbreviation of verb) clean government construction and safety management
The supervision department actively follows the requirements of the owner and superior departments in the aspects of clean government construction, civilized construction, safety and environmental protection. And organize relevant meetings regularly, so that every supervisor can work honestly and fairly. Monitor the implementation of safety measures and the results of rectification. Up to now, there have been no safety accidents in this project.
In short, in the construction supervision work, we have grasped the important parts and key links, put prevention first, and always strictly control to ensure quality. The project is safe and reliable, and meets the design and specification requirements. We will correct the existing problems in time with a rigorous and pragmatic working attitude, overcome the ineffective factors, intensify our work, and hand in a satisfactory project answer sheet for the owner!
Summary of engineering supervision II
Dear leaders, experts and guests,
The post-disaster reconstruction project of _ _ city _ _ county _ _ middle school was successfully completed with the joint efforts of all participating units. Here, on behalf of the ancient city supervision project department of Zheng Ling Construction Supervision Consulting Co., Ltd., I summarize the supervision work of this project as follows:
I. Overview of the Project:
The post-disaster reconstruction project of city and county middle schools was contracted by Sichuan Seventh Construction Group Co., Ltd. The project is located in the middle school campus of the former ancient city, with a frame structure, including four floors of teaching building, four floors of student apartment building and one floor of student canteen. All building roofs are ceramic tile roofs, with a total construction area of 137 17.57m2 and a total cost of 40 million yuan.
Second, the supervision organization:
According to the supervision contract and supervision outline, combined with the specific conditions of this project, our company established a project supervision organization composed of chief supervision engineer Lei Yu, civil supervision engineer Liu Bing, He Yingqiang and hydropower supervision engineer Chen Wenchang, and entered the site on October 20th to supervise this project. The project supervision team strictly implements the supervision procedures, adheres to the purpose of "honesty, law-abiding, fairness and science", and implements supervision with the work style of "earnest, rigorous and meticulous" to complete the supervision task.
Third, the supervision work:
1, pay special attention to prior control and strictly control the construction.
In the whole supervision process, we should adhere to pre-control and active control, formulate supervision plans according to contracts and design documents, formulate specific supervision work procedures, and clarify work contents, actors, acceptance criteria and work requirements.
Before the commencement of this project, according to the requirements of supervision specifications, we have reviewed the qualifications of the construction unit, the institutions, personnel and systems of on-site quality management and technical management, and the qualifications and employment certificates of operators of special types of work. According to the application form of construction organization design scheme submitted by the contractor, the construction organization design is reviewed, and the supervision scheme is compiled accordingly, and the measurement, positioning and setting-out of the project, including axis size and horizontal elevation, are reviewed on the spot, which further clarifies the supervision objectives and requirements and creates conditions for the smooth development of supervision work.
2, strictly control the raw materials and semi-finished products come into play.
All raw materials and semi-finished products entering the site must be inspected in writing first, that is, certificate of conformity, certificate of use and quality guarantee. , meet the requirements for appearance inspection. After there is no abnormality, the supervisor shall witness the sampling and send it to the municipal testing center for re-inspection so that the materials can enter the site.
Re-inspection before use, unqualified materials refused to be used in the project. The certificate and quality guarantee of building materials in this project are complete, and the main building structural materials such as steel, cement, gravel and yellow sand have been sampled and rechecked after entering the site, all of which meet the qualified requirements.
3, strict process inspection, strengthen process control.
In the process of construction supervision, strengthen the means of construction process inspection, and the construction can only be carried out after passing the inspection. Without the experience of the previous process, the construction of the next process can not be carried out. Our project supervision department pays special attention to the acceptance of concealed works, and on-site supervisors supervise key parts, such as cast-in-place reinforced concrete, beams, slabs, ladders and roofs.
In the process of construction, we attach great importance to and strictly control the construction quality of reinforced concrete projects, especially floor projects. In the whole construction process, we focus on controlling the quality of steel bar binding, the pouring thickness of bottom plate, the concrete mixture ratio, slump and maintenance to ensure the construction quality of concrete. In the wall construction, we have grasped the following key points: first, the wet watering of bricks; The second is the correct mixing of mortar; The third is the quality of masonry, in which the fullness, cohesion, vertical flatness and setting of Rachel bars of mortar are the key points of supervision.
In the process of supervision, * * * issued 9 supervision contact sheets, 33 supervision engineer notices and 3 safety hazard rectification notices. In the process of project implementation, hold weekly site meetings on project quality, cost, progress, safety, contract management and other matters, and hold 12 special site meetings according to the actual situation of the project.
4. Strengthen post-event control to ensure the construction quality meets the contract requirements.
(1) No quality accident occurred in the whole construction process of this project. As a general quality problem, the construction unit carried out internal rectification after self-inspection; On the other hand, after the supervision and inspection, the construction unit will be notified for rectification.
(2) Promptly urge the construction unit to collect and sort out all kinds of engineering data, and earnestly do their own supervision data.
(3) Require the construction unit to protect the finished products of the completed project.
5, the project schedule control:
The progress of the project is directly related to whether the construction project can be completed and put into use on schedule. My supervision team first reviews the overall progress plan of the construction unit, and after reporting it to the owner for approval, urges the construction unit to construct in strict accordance with the overall progress plan. And according to the total schedule, prepare the monthly schedule. Once the deviation is found, the construction unit is required to make appropriate adjustments to the labor force, materials, equipment and funds in time to ensure that the project is completed as planned.
6. Investment control:
The project supervision department shall control the payment of the supervision project according to the construction contract, actual construction progress and project quality.
7, safe production and civilized construction:
"Safety first, prevention first", in the process of supervision, the project supervision team always takes safety supervision as the focus of work, which runs through the whole process of supervision work. And participated in the seminar on safety supervision of construction projects organized by the _ _ County Construction Bureau. Combined with the actual situation of the project, urge the construction unit to establish the responsibility system for safety in production, do a good job in the education of safety in production and civilized construction, organize the construction unit to carry out safety inspection on a regular basis, and timely issue a document asking the construction unit to make rectification within a time limit for the existing safety hazards. No safety accidents occurred during the construction of this project.
Through the joint efforts of the construction unit, design unit, contractor and supervision unit, under the guidance and supervision of relevant government departments, the project has been basically completed according to the contract. Engineering technical data have been sorted out as required, and the engineering quality meets the requirements of design, specification and use function. I wish Pingwu Gucheng Middle School a successful post-disaster reconstruction project.
Here, I would like to express my heartfelt thanks to the participating units such as _ _ Middle School, _ _ Design and Research Institute and _ _ County Quality Supervision Station for their strong support and cooperation in our work!
Summary of engineering supervision work 3
The year 20__ is coming to an end. Looking back on the work of 20__ years, there are fruitful joys, difficulties in tackling key problems with colleagues, and melancholy when encountering difficulties. Time flies, unconsciously, 20 years full of hope is coming. The important work this year is summarized as follows:
First, the main work content of an individual for one year
During this year, I mainly participated in the first-phase customs clearance project of _ _ Port Bonded Port Area, the general survey of underground pipelines in _ _ City, the restoration project of the three jetties storage yard in Yantai Port, the displacement observation of the comprehensive building and the measurement of several projects of the company.
Second, perform job responsibilities
In this year's work, I still carry out all kinds of work with the attitude of working and learning, sum up the process and main points of each work, find out the problems I don't understand, consult the instructions and consult my leading colleagues in time, and accumulate work experience bit by bit. In terms of engineering quality, strict supervision shall be carried out in accordance with supervision specifications, engineering drawings and supervision rules. When I participated in the customs clearance project in the bonded port area, I was on the scene most of the time. The project seems simple, but the site is very large, and many points are constructed at the same time. We must grasp the key points of supervision to reduce workload and improve work efficiency and effectiveness. If problems that cannot be solved are found, report to the project leader in time and consult relevant specifications. While solving the problem, I also filled my knowledge gap in this field, and I can solve it independently in the next similar situation. The parts that need to be on site should be on site all the time, and the site records should be made well. The concealed works to be accepted should be accepted in strict accordance with the acceptance specifications. If the acceptance is unqualified, the construction of next working procedure is strictly prohibited. Check and confirm the original certificate test report and quality certificate of materials and equipment entering the site, and witness the sampling and parallel test of steel bars and interlocking blocks. For projects with overlapping operations, coordinate the construction sequence of each construction unit on site and strive to be the best. At the end of each month, the site construction situation will be checked with the construction plan. If the progress is backward, the construction unit will be required to take measures to speed up the construction on the premise of ensuring the quality.
Engineering data:
Write a supervision diary every day according to the site conditions, and sort out and file the site records and other materials of the day, and urge the construction unit to report the corresponding engineering materials. Regularly organize and archive witness sampling, parallel detection and other data, and make various accounts so as to prepare and archive the data at the end of the project.
Third, work experience, feelings and shortcomings
Through this year's supervision work, I feel that as a supervisor, only by following the rules, being strict with myself, integrating into the team, respecting others and being serious and responsible can I win the respect of others. I was exposed to many new things at the construction site. With the careful guidance and help of my old colleagues, I have learned a lot of new theoretical knowledge and practical experience and broadened my knowledge.
In this year's work, I have gained a lot, but there are also many shortcomings, such as lack of work experience, lack of care and patience in the face of intense work, which also leads to many flaws in my work. In the future work, I will study hard, constantly sum up experience, learn lessons, correct my own shortcomings, and strive to foster strengths and avoid weaknesses.
Four. Personal career development opinions and views on the company next year.
Engaged in supervision work, knowing too much and too little, can never be satisfied with the present. So next year, I will ask more questions, learn more and do more, and gradually learn various professional knowledge according to the needs of my work. Abide by the company's various management systems in work and life, strengthen the cultivation of team consciousness, further integrate into our collective, use spare time to learn more norms, read more relevant papers, and improve their professional level. I also hope that the company will organize more training for our new employees so that we can better adapt to this job, so that we can do more things for the company.
Summary of project supervision work 4
With the passage of time, 20 years passed quickly. At the end of this year, it is very helpful for me to review my work in the past year, calm down and sum up my achievements and gains, and find out my shortcomings, so as to facilitate my future work and sum up my work in the past year. I sincerely hope that everyone will give me a hint about my improper summary. In the past year, with the strong support and care of the leaders of the company and the project department, I earnestly adhered to "the guiding ideology of pre-control, standardization, science and high quality is firmly established" to ensure the satisfaction of every owner and work hard wholeheartedly. 20__, tell me about my work.
First, the quality control of engineering construction, control the work done in advance, after receiving the engineering design and construction drawings, I will first be familiar with the drawings, understand the design intent, understand the main technological process and engineering characteristics of the construction process, record the suggestions on the construction drawing paper in writing, take corresponding measures to apply to the construction site, and do a good job in sampling data of related projects.
Second, record and inspect all materials, personnel and mechanical equipment on site, and prevent unqualified materials from being used in the project. For the construction of key parts of the project, arrive at the station in advance, check whether the construction preparation work is in place, and make a written record of the whole construction process.
Three. Inform the project management department of the construction unit in oral or written form of the problems found in the patrol inspection in each construction process, report to the resident supervision engineer, supervise the construction unit to carry out rectification and recheck, and do a good job in on-site supervision.
4. With regard to the control of safe and civilized construction, I have accumulated some experience by studying the safety production law and establishing the viewpoint that safety prevention is the priority, that is, work should be done first, because accidents can be prevented but unpredictable, and corresponding inspection systems should be established, such as checking whether the full-time safety officer on site is in place, and checking whether the safety protection tools such as safety protection net, safety belts and helmets for aerial workers are complete. Check whether the key parts of the site project are provided with safety warning signs, and rectify them in time when potential safety hazards are found. Supervisors have an unshirkable responsibility for the safety of the construction site, do a good job in daily safety inspection, supervision and management, make corresponding data records, strengthen patrol work, strengthen process control, and do their work better and more seriously.
20__ years' work is busy and full. In order to perform supervision duties, work actively, obey the arrangement of leaders, never shirk, and think of the project wholeheartedly, I will study professional business knowledge more attentively in the coming new year of 20__, and strive to provide effective benefits for the company.
Project supervision work summary 5 pages
The year 20__ is coming to an end. This is my first year in XX Company. Since I started work in July this year, through the care, help and patient guidance of leaders and colleagues, I have changed from a childlike college student who has just left school to a worker who has just entered the society.
1, main work contents and post responsibilities.
According to the company's arrangement and work needs, I came to the * * project department to do information management, mainly engaged in the sending and receiving, sorting and filing of documents. I took over the data management of the whole project department from the former librarians and learned about the current project progress. Under the careful guidance of leaders and colleagues, I am conscientious in my work. Now let me introduce the main contents of my work:
1) Register to send and receive files. The correspondence documents are complex, and the loss and forgetting of documents can be effectively prevented by sending and receiving the document register; At the same time, we can clearly understand the progress and existing problems of the project from the register of sending and receiving documents, so it is very important to register the sending and receiving documents well.
2) Responsible for data management. Collect, classify, arrange and file data in strict accordance with the requirements of specifications and related documents. Data service site and guidance site complement each other and are indispensable. Do a good job in the collection and filing of documents and materials in each construction stage. The integrity of materials is related to the quality of the whole project and the construction and completion of the project. At the same time, the document also reflects the level of supervision work and is an important basis for measuring and evaluating supervision work.
3) Assist in preparing monthly supervision report and attendance sheet. The monthly supervision report is the summary of the project progress and supervision work by the supervision department within one month; The attendance sheet is a record of the working days of the supervision department in one month. Both of them are important basis for relevant departments to inspect and evaluate the work of supervision departments, so it is very important to do this work well.
4) Assist in completing the monthly work report. The monthly work report is an important internal document for the company to count the output value of engineering business and file it electronically. Cooperate with the monthly supervision report, print paper documents according to the requirements of the company, and send them to the relevant departments of the company within the specified time after being reviewed and signed by the chief supervision engineer or the representative of the chief supervision engineer.
5) Record the supervision log and fill in the daily work record. Truthfully and timely reflect the work content and situation. It is also an important basis for the company to evaluate personal work. Print the daily work records into paper documents, and send them to the relevant departments of the company within the specified time after being reviewed and signed by the chief supervision engineer or the representative of the chief supervision engineer.
2. Work experience and feelings
Through the work and study in the past five months, I have a systematic and comprehensive understanding of the supervision work, and also made clear the supervision work flow, work content and working principles. Through the guidance and help of leaders and colleagues, the professional level has been obviously improved, but there are still some shortcomings, which need more exercise and study. In my spare time after work, I taught myself the internal documents and related standards of the company, which not only deepened my understanding of the company culture and system, but also enriched my professional knowledge.
Summary of project supervision: 5 articles related to Daquan;
★ Summary of five selected supervision work
★ Five experiences in engineering construction supervision.
★ Model essay on summary of construction project supervision work
★ Five formats for personal work summary of supervision.
★ Summary of project supervision for half a year.
★ Model essay on personal work summary of supervision engineer
★ 2065438+250 words through the annual work summary, in 2009, the project manager.
★ 20 19 annual work summary of project supervision
★ 3 essays on the summary of municipal engineering supervision.
★ Five selected supervisors' personal work summaries.
var _ HMT = _ HMT | |[]; (function(){ var hm = document . createelement(" script "); hm.src = "/hm.js? F3 deb 3 e 38843798 ce 8b 6783 fc 0959 c 85 "; var s = document . getelementsbytagname(" script ")[0]; s.parentNode.insertBefore(hm,s); })();