Luding Bridge, also known as Dadu Bridge, is an iron cable bridge across the Dadu River in Luqiao Town, Luding County, Ganzi Tibetan Autonomous Prefecture, Sichuan Province, China, and is the main landscape cultural relic of Luding Bridge Scenic Area. So what is the construction process of Luding Bridge?

1. During the Kangxi period of the Qing Dynasty, the exchange of materials between Tibetans and Hans reached the Dadu River by ferry or zip line, and sometimes it was impossible to cross the river in time. There are mountains of goods on both sides of the Dadu River, and some fresh foods (such as delicacies, meat dishes, etc.) rot because they can't cross the river, and frequent dispatch of troops has formed an obstruction here.

2. In September of the forty-fourth year of Emperor Kangxi of Qing Dynasty (1705), in order to unify the whole country and solve the problem of blocked roads leading to Tibetan areas in Han areas, Emperor Kangxi ordered the construction of the first bridge on Dadu River.

3. In April (1706), the first bridge of Dadu River was completed. Emperor Kangxi wrote the letter "Luding Bridge" with the words "Lushui" (that is, Dadu River was called "desert water" and Kangxi mistakenly thought it was "Lushui") and "Pingding" (pacifying the rebellion of the local toast). Luding Bridge began to become a link between Tibet and Han nationality, hence the name Luding County.

4.1June, 969, Luding Bridge was repaired once. During the overhaul, many new technologies were adopted, such as replacing the original hand-forged crude iron with low-carbon round steel chains and replacing the traditional hand-pulled bellows with blowers.

5, 65438+June 2 1, 0970, 340 detachment of 7848 troops of China People's Liberation Army inspected Luding Bridge, and the No.7 bottom chain (counted down from the river) broke 30 meters on the east bank, and then the 07039 engineering headquarters sent personnel to pull the broken chain out of the river and connect it with a heavy truck ring.

6.1February 4th, 972, China writer Guo Moruo wrote "Luding Bridge", a symbol of cultural relics protection units in Luding Bridge.

In July and March, 1974, National Cultural Heritage Administration, China allocated funds to overhaul Luding Bridge. When it was about to be completed, the handrail chain on the upstream side suddenly broke, which triggered a chain reaction. Three chains were broken, which caused the deck to tilt and the maintenance tools placed on the deck fell into the river.

8. 1975, a domestic veteran organized a visit to Luding Bridge. After dozens of people boarded the bridge, three of the nine bottom chains suddenly broke and the deck was tilted at 45 degrees.

9. In 2003, with the approval of the former Ministry of Construction of People's Republic of China (PRC), Luding Bridge Scenic Area was established.

10, as of 20 16, 10, Luding Bridge has a history of 3 10 years. Now the iron ring of the bridge is cast with the marks of blacksmiths and craftsmen, which is the supervision mechanism of bridge maintenance.

The construction of Luding Bridge ends here.