Two. Matters needing attention in business objectives
1. The quotation preparation instructions shall conform to the requirements of the tender documents, and be concise and appropriate.
2. The format of the quotation sheet shall conform to the format required by the tender documents, and pay attention to whether the subheads are sorted correctly.
3. The "Summary Table of Bid Quotation", "Summary Table of Bid Quotation", "Comprehensive Quotation Table" and other quotation tables shall be filled in according to the provisions of the tender documents, and shall be signed and sealed by the preparer, reviewer and bidder as required.
Three. Matters needing attention in technical bidding documents
1, check the accuracy of the project description;
2. The planned commencement and completion dates shall conform to the schedule and provisions of the tender documents, and the stages and node time limit for a sub-project shall conform to the provisions of the tender documents. The construction period should be reasonable in advance and corresponding measures should be taken. If you can't advance, you can never advance, such as the construction period of the bridge project.
3. The written description of the construction period and the arrangement of the construction sequence should be consistent with the "image progress diagram", "crossing diagram" and "network diagram". In particular, the construction period of bridging and paving works should be carefully arranged according to the specific conditions to avoid the phenomenon of inconsistency with reality.
4. Overall deployment: the construction team and principal responsible persons should be consistent with the capital review plan, and the written explanation should be consistent with the Plan, the Organization Diagram, the Resume of Personnel and the proposed positions.
5. The construction scheme must match the construction method and technology.
6. The construction scheme meets the requirements of the tender documents and the relevant commitments in the tender. Material supply is consistent with Party A's requirements: unified storage and transportation, Party A's supply or bidding. The temporary communication scheme shall be handled according to the requirements of the tender documents. (If overhead lines are needed, wireless quotation is not allowed). The number of construction teams should be configured according to the provisions of the tender documents.
7. Project progress: The total project duration and key project duration meet the requirements of the tender documents.
8. Are there any special arrangements for special projects? The engineering measures for winter construction should be appropriate, and those that affect the quality must be stopped. The expansive soil should be stopped in the rainy season, and the bridge and culvert foundation across seasonal rivers should be completed before the rainy season, and the working procedures and construction period should be reasonably arranged.
9. Note: Whether the process arrangement of the "network diagram" is reasonable and whether the key lines are correct.
10. Check whether the Network Diagram indicates correctly when it needs to be interrupted, whether the end of each project belongs to the corresponding position, and whether the virtual operation is reasonable.