Current location - Education and Training Encyclopedia - Resume - Work plan of annual geological disaster emergency drill in Nanhai District
Work plan of annual geological disaster emergency drill in Nanhai District
In order to further improve the emergency response capability of geological disasters, improve the operability of emergency plans for sudden geological disasters, and minimize casualties and property losses caused by disasters, Nanhai District Land and Water Affairs Bureau (Land and Water Bureau) and Xiqiao Town People's Government plan to conduct a joint emergency drill for geological disasters at Dengshan Avenue in Xiqiao Town on Tuesday 2011.19. In order to ensure the smooth completion of the exercise, the following work plan is formulated.

I. Guiding ideology

Adhere to the working principle of "prevention first, combining prevention with treatment", highlight the working idea of "people-oriented", focus on emergency disposal of sudden geological disasters, and strengthen organization and leadership.

Second, the purpose and significance

Xiqiao is one of the areas with great pressure on the prevention and control of geological disasters in the whole region. There are 1 1 hidden geological hazards in the town, and there are 2 hidden geological hazards threatening residents. It is of great significance to carry out emergency drills for geological disasters. Through this emergency drill, the people's awareness of disaster prevention and self-help ability to deal with sudden geological disasters will be improved, the ability of emergency handling of geological disasters will be enhanced, and the operability of emergency plans for sudden geological disasters will be tested and improved.

Third, the background and content of the exercise.

Affected by the continuous heavy rainfall, the person in charge of monitoring the landslide geological disaster points in Xiqiao Mountain found a small number of landslides on the north slope of Dengshan Avenue in Xiqiao Mountain (behind West Second Street) and Biyudong, showing signs of major landslide geological disasters, and the situation was critical. After the inspectors found out, they immediately reported the situation to Xiqiao Land Office. After receiving the report, Xiqiao Land Office immediately telephoned Nanhai Land Construction and Water Affairs Bureau (Land Office) and Xiqiao Town Emergency Office, and immediately rushed to the scene to verify the situation. After receiving the report, the District Land and Urban Construction Water Affairs Bureau (Land Office) immediately reported the situation to the District Emergency Office, the Municipal Bureau of Land Resources and Urban-Rural Planning, and invited the Foshan Geological Bureau to send experts to the scene to carry out emergency investigation. After on-site investigation and verification, it is dangerous and may directly threaten the safety of people around West Second Street and tourists in scenic spots. According to the Emergency Plan for Sudden Geological Disasters in Nanhai District, Foshan City, the District Bureau of Land, Urban Construction and Water Affairs (Land) reported the relevant situation to the leaders in charge of the district government in time, and the district government decided to immediately start the emergency plan for sudden geological disasters at the district and town levels, set up a geological disaster emergency headquarters, and promptly informed all members of the headquarters to quickly prepare for emergency rescue and disaster relief.

Fourth, the time and place of the exercise.

The drill time is planned to be1October 20119 (Tuesday) at 9: 00, at the hillside on the north side of Dengshan Avenue in Xiqiao Town (behind West Second Street) and Biyudong Scenic Area.

Verb (abbreviation for verb) participating guests

(1) Leading guests: leaders of the municipal bureau and relevant leaders of the district.

(2) Observation guests: 1 ~ 2 Directors or deputy directors and staff in charge of land disasters in various towns and streets.

Six, exercise organization and responsibilities

In order to strengthen the organization and leadership, ensure the smooth progress of the drill and achieve the expected results, the joint emergency drill headquarters for geological disasters was established.

Chief Commander: Huang Songhua, Mayor of Xiqiao Town

Deputy Commanders: Zhang Jian, Xiqiao Town

Members: Pan Ruhai District Land Construction and Water Affairs Bureau (Land Office), District Safety Supervision Bureau, Yongtian Li District Emergency Office, District Meteorological Bureau, Yerui District Third Prevention Office, Xiqiao Town, Shenhailong Xiqiao Town, Zouxiqiao Town, Li Run Laixiqiao Town, Longhua Qiangxiqiao Town, Xiqiao Town, Hongrongheng Xiqiao Town, Liu. District Land Construction and Water Affairs Bureau (Land), Pan Guoxiong Xiqiao Town Party Committee Office and Emergency Office, Heyou Town Land Construction and Water Affairs Bureau, Tan Xiqiang Xiqiao Town Social Work Bureau, Xiqiao Town Safety Production Supervision Bureau, Zou Xiqiao Town Health and Population Planning Bureau, Chen Junxun Xiqiao Mountain Scenic Area Management Office, Xie Xiqiao Town Land Construction and Water Affairs Bureau (Land), Xiqiao Town Land Construction and Water Affairs Bureau (Land) Chen Xiqiao Town Environmental Transportation and Urban Management. Tan Xian Xiqiao Town Municipal Office, Yu Fujin Xiqiao Town Armed Forces Department, Ou Meiping Xiqiao Town Publicity and Culture Office, Huang Bojia Xiqiao Police Station, Ye Juxing Xiqiao Traffic Police Squadron, He Xiqiao Fire Squadron, Li Xianneng Xiqiao Traffic Management Office, District Yubiao Xiqiao Radio Station, Huangzuo Nanhai District Fourth People's Hospital, Li Ru Vocational Xiqiao Town Health Supervision Branch, Rao.

There are 7 working groups under the Emergency Exercise Command, whose members and responsibilities are as follows.

1. General Contact Group

Team leader: Hong Rongheng

Members:, Pan Guoxiong,, Chen Junxun, Xie.

Responsibilities: Responsible for making emergency drill work plan; Be responsible for the preparation of exercise materials; Be responsible for holding a preparatory meeting to clarify the exercise process and the work responsibilities of relevant units; Be responsible for the overall organization and comprehensive coordination of the exercise.

2. Public Security Traffic Section

Team leader: Zou

Members: Ye Juxing, Chen, Xian, Li Xianneng, Tan Xian.

Responsibilities: Responsible for maintaining public security and traffic order at and around the disaster site; Implement martial law blockade on the scene of geological disaster areas; Responsible for evacuating irrelevant personnel in the disaster area and assisting the emergency rescue team to transfer people and tourists in the disaster area; Complete other tasks assigned by the headquarters.

3. Emergency rescue team

Team leader: Li Runlai

Members: Group 1 (north of West Second Street): Yu Fujin, 10 reserve, 5 firefighters.

Group 2 (Jasper Cave): He, 10 reserve and 5 firefighters.

Job responsibilities: quickly organize militia reserve and fire squadron to rush to the disaster area to organize rescue and disaster relief; Complete other tasks assigned by the headquarters.

4. Investigation and Monitoring Team

Team leader: Li Runlai and Hong Rongheng

Members: Group 1 (north of West Second Street): He, Xie, Lin Haijia, Liu, Zhao Yatian.

Group II (Jasper Cave): Pan Yongbo, Liu Jianhua, Lin Gangjian, Zhang Dongping and Liang Baoyin.

Responsibilities: Organize experts to carry out on-the-spot investigation, find out the conditions, trigger factors and influence scope of disasters, determine the grade of geological disasters, monitor and evaluate the stability of disaster points, and formulate emergency rescue plans; Put forward the best route for evacuation and transfer of personnel and opinions on temporary resettlement sites for victims; Complete other tasks assigned by the headquarters.

5. Medical and Epidemic Prevention Department

Team leader: Luo Lirong

Members: Zou, Chen, Huang Zuo, Li Ru.

Job responsibilities: quickly set up and mobilize the on-site medical rescue team; Responsible for contacting, designating and arranging hospital treatment, organizing and directing the injured people on site to receive first aid and be transferred to hospital for treatment; Responsible for mobilizing and arranging medical equipment and ambulance vehicles; Responsible for the health and epidemic prevention work in disaster areas and safe havens to ensure that there is no major epidemic after the disaster.

6. Victim Placement Team

Team leader: Shen Hailun

Members: Tan Xiqiang, Li Jianxiong

Job responsibilities: responsible for the evacuation of people and the placement of tourists; Responsible for the distribution of relief materials; Responsible for the management and maintenance of safe havens.

7. Communications Group

Team leader: Long Huaqiang

Members: Ou Meiping, Ou Yubiao, Xie.

Job responsibilities: responsible for publicity and reporting, on-site shooting and influencing production before and after the drill. (Specifically, arrange three camera guns for the radio station to shoot the whole scene at the headquarters and two rescue sites; The Office of Work Safety has arranged two DVs, one to assist in filming the whole process of tourists evacuating from Biyudong to the emergency shelter of Xiqiao Senior High School, and the other to assist in filming the whole process of the headquarters site (the site where the information of the affected people is registered); The National Land Institute arranged a DV to assist in filming the whole process of the north side of West Second Street (the scene of mass evacuation).

Seven, emergency plan drill team and large-scale material preparation

(a) the professional team, the number of participants and the items to be prepared before the emergency plan exercise.

(1) There are 22 people in the militia reserve of the armed forces.

(2) Public security, traffic police, urban management, fire fighting 10, and 2 public security, traffic police, urban management and fire engines.

(3) Land, Urban Construction, Water Affairs Bureau (land) 10, and Construction Department 5.

(4) Health and Population and Family Planning Bureau 10 (including the Fourth People's Hospital and Health Supervision Office). Be responsible for preparing 1 120 ambulances and first aid equipment, sanitation and epidemic prevention, and practicing the examination and treatment devices for the wounded.

(5) 2 people in the traffic control office. Prepare 1 bus, pick up the affected people and evacuate according to the established route.

(6) The Social Welfare Bureau and Dongbi Community, with 5 people each, are responsible for resettling and evacuating people and tourists.

(7) Five persons from the Safety Production Supervision and Administration Bureau are responsible for image-assisted shooting and emergency tent installation.

(8) There are 2 publicity offices and 3 radio stations, which are responsible for publicity and video shooting.

(9) The Municipal Office has 4 people, who are responsible for preparing water horses.

(10) 2 persons for power supply, water supply and telecommunications, and 1 vehicle for power supply, water supply and telecommunications. (wearing work clothes, responsible for repairing water, electricity and other lines)

(1 1) 50 participants, including the masses and tourists. Among them, there are 30 residents, and Dongbi Community is responsible for contacting and convening; There are 20 tourists, organized by Xiqiao Mountain Scenic Management Office.

(2) Preparation of basic materials for emergency drills

The Emergency Office and the National Land Office are responsible for the basic materials of emergency drills, specifically for the site layout of emergency drills, the selection of safe havens and the preparation of related equipment and materials. The specific contents include:

Emergency drill location: headquarters and safe-haven resettlement sites;

Battlefield headquarters: tables and chairs, banners and team badges;

Dangerous goods: chairs, signboards, 30 boxes of mineral water, 10 general tent, 2 emergency tents, etc.

Equipment and material preparation:

(1) Exploration monitoring equipment: tape measure, tape measure, etc.

(2) Emergency rescue equipment: stretchers (provided by the hospital), safety helmets (collected by participants in the Party and government offices one day in advance) and rain gear (raincoats, rain boots and umbrellas);

(3) Emergency supplies: striped cloth and sandbags;

(4) Others: evacuation signs, portable small broadcasts, whistles, warning isolation belts, warning signs, water horses, eight-way walkie-talkies, etc.

Eight, emergency drill plan

(1) Stage 1: Hazard report (pre-shot the day before the exercise and demonstrated by the host)

At 9: 30, geological hazard inspectors found a small amount of collapse on the hillside on the north side of Dengshan Avenue in Xiqiao Town (the back side of West Second Street) and on the hillside of Biyudong Scenic Area. There were cracks in front of the mountain, the soil swelled, and the cracks at the back edge widened sharply, showing signs of landslide, and the situation was critical.

At 9: 35, the geological disaster inspectors immediately reported the site situation to Xiqiao Land Office and described the landslide precursors. Xiqiao Land Institute immediately reported to the District Land Construction and Water Affairs Bureau (Land) and the town government after receiving the call, and Xiqiao Land Institute together with geological disaster experts rushed to the scene to guide disaster prevention and avoidance.

At 9: 40, the District Bureau of Land, Urban Construction and Water Affairs (Land) immediately called the leaders of the District Bureau and District Government (District Emergency Office) to report the relevant situation. Geological disaster emergency experts rushed to the dangerous site to carry out emergency investigation, and initially determined the geological disaster level, inducing factors and disaster scale.

(2) Phase II: Start the plan.

At 9: 45, after receiving the report, the district and town governments launched the emergency plan for sudden geological disasters, and established the geological disaster joint emergency headquarters. The headquarters is temporarily located in Xiqiao Town Comprehensive Management Letters and Calls Stability Center. (Moderator's statement)

Deputy Chief Commander (Zhang Jianhe, Headquarters): "The chief commander of the report, according to the report of the District Bureau of Land and Urban Construction and Water Affairs, there are a few collapses on the hillside on the north side of Dengshan Avenue in Xiqiao Town (behind West Second Street) and the hillside of Biyudong Scenic Area, with cracks in front of the mountain, soil uplift, sharp widening of the cracks at the rear edge, and signs of landslide, which is critical."

Commander-in-Chief (Huang Songhua, headquarters): "Check the danger immediately, evacuate the surrounding people as soon as possible, and prepare for emergency rescue. Please immediately notify the member units of "Regional Geological Disaster emergency headquarters" to rush to Xiqiao Town to guide and assist in emergency rescue and disaster relief; Inform Xiqiao Town Government to quickly organize relevant departments of the town to organize personnel to evacuate to a safe area according to the emergency plan for geological disaster evacuation. "

District Government (District Emergency Office) (Yongtian Li, headquarters): "Geological disasters suddenly occurred on the hillside on the north side of Dengshan Avenue in Xiqiao Town (behind West Second Street) and the hillside of Biyudong Scenic Area. The emergency plan for sudden geological disasters in Nanhai District has been launched. All members of emergency headquarters are requested to rush to Xiqiao Town to give guidance and assistance in emergency rescue and disaster relief. Emergency headquarters is located in Xiqiao Town Comprehensive Management Letters and Calls Stability Center. "

Working Group: Assemble from the box office at the North Gate (the assembly point before the drill starts) to the parking lot of the comprehensive petition stability center in Xiqiao Town (vehicles stop in front of the comprehensive petition stability center according to the designated position, and people queue up to run into the designated assembly point and queue vertically).

Deputy Chief Commander (Zhang Jianhe, Headquarters): "Report to Chief Commander, all working groups have been assembled, please give instructions."

Commander-in-Chief (Huang Songhua in front of the rostrum): "There are sudden geological disasters on the hillside on the north side of Dengshan Avenue in Xiqiao Town (behind West Second Street) and Biyudong Scenic Area, and the emergency plan for landslides in Xiqiao Town has been started. Please ask the emergency office to study, formulate and quickly implement the emergency plan according to the investigation and evaluation results of the emergency expert group on land geological disasters; According to the evacuation plan, the Town Social Work Bureau, Dongbi Community Neighborhood Committee and Xiqiao Mountain Scenic Area Management Office organized residents in the area under the jurisdiction of West Second Street and tourists from Biyudong Scenic Area to evacuate to Xiqiao Town's comprehensive petition stability center and made good arrangements; The town health and family planning bureau immediately contacted the nearest hospital and set up a medical point at the safe-haven resettlement site to rescue the injured people and tourists; Town health supervision branch, to carry out health and epidemic prevention; The armed forces immediately organized reserve and fire squadrons to rush to the scene to carry out emergency rescue; Xiqiao police station, traffic police squadron and urban management sub-bureau immediately rushed to the scene to carry out public security work at the rescue site and surrounding houses to divert traffic and ensure the smooth flow of rescue vehicles. All working groups are requested to act quickly according to their respective responsibilities and report the progress in a timely manner. "

(3) The third stage: emergency rescue and disaster relief

At 9: 55, (Li Runlai (north of West Second Street) and Hong Rongheng (Biyudong)), the District Land and Resources Bureau, the Town Land Institute and the emergency expert group carried out the dangerous situation investigation, monitoring and evaluation of the disaster bodies, found out the inducing reasons, the size and level of the disaster bodies, reported them to the emergency office, formulated the on-site emergency rescue plan and prepared emergency materials.

Emergency expert group (Zhao Yatian, rescue site) (intercom): "After investigation, the soft soil of the mountain leads to shallow sliding surface. The landslide in Biyudong Scenic Area is about 5m long and 3m wide, with an average thickness of 1 m and a total amount of15m3. The landslide on the north side of Dengshan Avenue (behind West Second Street) is about 20 meters long, 5 meters wide, with an average thickness of about 5 meters and a total amount of about 500 cubic meters. It is a small landslide. After monitoring, it is found that the landslide is still creeping and sliding, which may directly threaten the safety of residents on the north side of Dengshan Avenue (West Second Street) and tourists in Biyudong Scenic Area, and the danger level is medium. It is recommended to immediately cover the landslide with colored strips, dredge the surrounding drainage ditches, pile sandbags under the landslide for temporary support, and evacuate the threatened personnel as soon as possible. "

Deputy Chief Commander (Zhang Jianhe, Headquarters): "Report to the Chief Commander. After investigation, it is found that the mountain soil is soft and there is a shallow sliding surface. The landslide in Biyudong Scenic Area is about 5 meters long and 3 meters wide, with an average thickness of about 1 meter and a total amount of about 15 cubic meters. The landslide on the north side of Dengshan Avenue (behind West Second Street) is about 20 meters long, 5 meters wide, with an average thickness of about 5 meters and a total amount of about 500 cubic meters. It is a small landslide. After monitoring, it is found that the landslide is still creeping and sliding, which may directly threaten the safety of residents on the north side of Dengshan Avenue (West Second Street) and tourists in Biyudong Scenic Area, and the danger level is medium. The emergency expert group has completed the preliminary investigation, and suggested covering the landslide with colored strips immediately, dredging the surrounding drainage ditches, piling sandbags under the landslide for temporary support, and evacuating the threatened personnel as soon as possible. Please ask the commander-in-chief for instructions. "

Commander-in-Chief (Huang Songhua, Headquarters): "Agree to carry out emergency rescue and disaster relief according to the opinions of the expert group, and make every effort to ensure the personal safety of the threatened personnel. All emergency rescue teams will immediately put into emergency rescue work, and the traffic security team will block the rural roads entering the landslide danger zone, and set up a cordon at the same time. No one can enter the danger zone except the emergency rescue and disaster relief personnel; Conduct public security patrols in the disaster areas to ensure the safety of the disaster areas. "

Deputy Chief Commander (Zhang Jianhe, Headquarters): "The expert group continues to carry out monitoring work; The monitoring and early warning group shall delimit dangerous areas as soon as possible, enclose warning lines and hang warning signs and indicating signs; The rescue and relief team is responsible for comprehensive rescue and relief work, emergency rescue and reinforcement of unstable slopes, and transfer of threatened personnel and property; The resettlement rescue team is responsible for the affected people to avoid and evacuate to temporary resettlement sites in an orderly manner according to the scheduled route and carry out rescue work. " At the same time, the staff of Dongbi Community Neighborhood Committee and Xiqiao Mountain Landscape Management Office organized relevant personnel to evacuate to Xiqiao Town Comprehensive Management Letters and Calls Stability Center.

10: 10, the armed forces department of the town organized the reserve and fire squadrons to be divided into two groups, and went to the geological disaster site to carry out emergency rescue work according to the guidance of the district and town land departments and the emergency expert group. Xiqiao police station, traffic police squadron and urban management sub-bureau arrived at the rescue site, surrounded the cordon, implemented security alert, and diverted traffic to ensure the smooth entry and exit of rescue vehicles. Xiqiao Construction Office, power supply, water supply and telecommunications departments arrived at the rescue site to inspect the building, power supply, water supply and communications to ensure that water, electricity and communications were not affected (filming was made the day before construction, and the power supply, water supply and telecommunications departments rehearsed). The traffic control office contacted a bus to transport the affected people and tourists to the emergency shelter of Xiqiao Senior High School, Xiqiao Comprehensive Management Letters and Calls Stability Center. The Fourth People's Hospital of Nanhai District received a notice from the Town Health Planning Bureau, and arrived at Xiqiao Town Comprehensive Management and Stability Center to set up a temporary medical point to rescue the injured people and tourists (Dongbi Community and the scenic spot assigned a person to play the injured (make a wound with red syrup) and simulate dressing the wound on the spot). The Town Social Work Bureau and Dongbi Community are responsible for the evacuation and resettlement of the Comprehensive Management Center (distributing mineral water and registration materials on site, etc.). ). The town emergency office, social work bureau and safety supervision bureau organized personnel to install emergency tents.

10:15-10: 35, according to the emergency rescue plan of emergency experts, two rescue teams at the rescue site covered the landslide with colored strips, dredged the surrounding drainage ditches, and piled sandbags under the landslide for temporary support.

10: 35, (Li Runlai, emergency scene): "Report to the deputy commander, after 1 many hours of emergency rescue, evacuation and monitoring, all the threatened personnel have been safely transferred, the landslide danger has been basically controlled, the loose debris on the upper part of the landslide has been cleared, the landslide scope has not been further expanded, and the danger has been basically eliminated." (At the same time of reporting, two rescue site personnel began to assemble back to Xiqiao Comprehensive Management Letters and Calls Stability Center).

(iv) The fourth stage: removing the danger.

10: 40, deputy commander (Zhang Jianhe, headquarters): "Report to the chief commander, after 1 many hours of emergency rescue, evacuation and monitoring, all the threatened personnel have been safely transferred, the landslide danger has been basically controlled, the loose debris on the upper part of the landslide has been cleared, the landslide scope has not been further expanded, and the danger has been basically eliminated. Please indicate. "

Commander-in-Chief (Huang Songhua, Headquarters): "Patrol early warning personnel continue to monitor and report any abnormality immediately."

(v) Stage 5: Summary

1 1: 00, all rescuers gather in the comprehensive management center and line up vertically. The deputy commander-in-chief and commander-in-chief made concluding remarks.

Selected geological disaster emergency drills 20 13

Selected geological disaster emergency drills 20 13

Selected geological disaster emergency drills 20 13

Selected geological disaster emergency drills 20 13