Self-evaluation of long-term private, automated parts and mechanical equipment manufacturing quality management; Familiar with チック alloy ァルミニダィカストやプスチッ. Proficient in the use and manufacturing of various measuring instruments. Official: 20 1 1/05- Today: Quality of technicians in quality management department of photoelectric industry (Suzhou) Co., Ltd.: 1. 1.2 サプィヤーにしてののをフ.1 Make the first draft of SIP and make a plan. 1.4 pre-specification, combination, assembly and performance confirmation of new products and products. 2.サプラィヤ 125402. 1 residents, official, hand-made plans, schemes, etc. 2.2 サプラィヤーのとしにのサプィとしし Defective incoming materials, confirm, urge and improve. 3.2 Production line, やIQC materials, judgment standards, education and guidance, and characteristics of materials in various departments. サプラィヤーのやしぃぉよびのしぉび. 3.3 The production line should have no abnormal combination, directly analyze the department and directly solve the bad situation. Pay attention to the influence of production lines, problems, technologies and substances. 3.4 Weekly quality seminars, reports, materials and information of various departments. 3.54M Strengthen management and improve management level. 3.6 Improvement on the proposal of "achieving the goal" in that year. 2007/08-201/05: Technical Quality Department of Bo Industrial Machinery (Suzhou) Co., Ltd. 2) Clarify the quality requirements, sample stages and production process evaluation of new products, and guide the production of manufactured products. New products, evaluation in import stage, product design, proposal, standards and methods. 3) Responsible for quality management, adjustment and annotation. 4) Introduce mass production, be responsible for mass production and supervise mass production. 2006/0 1-2007/7: official contents of QE in the quality assurance department of Suzhou Ge Yuan Products Co., Ltd.:1) Daily project audit guidance. 2) New products, new products, new products, new products and organizations. Participate in daily quality reports and various quality improvement activities, and conduct "quality abnormality", "quality improvement" and "certification" operations. 3) Be responsible for reviewing the manufacturing, thermal management, CNC, painting, site quality and internal completion of the 8d report. Share to
Retry translation results
Sorry, the system response timed out. Please try again later.
Support online translation between Chinese and English, Chinese and Japanese, support web page translation, input web page address in the input box to provide one-click clearing and copying functions, and support bilingual comparison and viewing, so as to make your experience smoother.