The Xuyong branch line starts from Xie Jia depression bordering Xuyong, Sichuan, passes through Shuanghe, Pianyan and Tianba at the southern end of Weixin County, and passes through Maanshan Hub. The total length of the line is 1 15.778 km. The whole line is built according to the standard of two-way four-lane expressway, with a design speed of 80 kilometers per hour and a subgrade width of 24.5 meters.
Extended data
Yibi Expressway is connected with Zhenbi Expressway under construction and Hezhen Expressway to be built soon through Zhenxiong Interchange. Interchange adopts the form of variant alfalfa leaves, which mainly solves the traffic flow conversion between Zhenbi Expressway and Hezhen Expressway. The interchange is a hub interchange, and the interchange is located between the main toll station of Zhenbi Expressway and Zhangjitun Tunnel.
The construction of Zhenxiong Interchange will effectively reduce the traffic pressure of Zhenxiong, which is of great significance to realize "unblocked Zhenxiong" and promote the rapid economic development of Zhenxiong County.
The construction of Zhenxiong Interchange in Fenghuang Net-Yibi Project is busy.
Public Network-Three expressways in Zhaotong, Yunnan will be opened to traffic this year.
Wang Liang, a high-end player in Qq Speeding Game, has the id of Duxiu, the disc king. With its silky operation, it is widely sought after by many players. QQ