Hangzhou expressway network is planned as "two windings, three verticals and five horizontals".

Among them, "Second Ring Road" refers to two expressways around the city.

At present, there is an expressway around Hangzhou, with a length of 123 km. However, this ring road only encircles half of the main city, Jiangnan and Xiasha, and Linping, Tangqi, Liangzhu, Yuhang, Linpu, Guali and Pengyi are all outside, which is not good for Hangzhou to build a metropolis.

Therefore, it is planned to build a wider second expressway around the city outside it, and construction has begun in some places.

"Three verticals and five horizontals" refers to three north-south expressways and five east-west expressways, with a total of eight roads.

Among them, "one vertical" and "one horizontal" have been completed, namely-

Shangtang Shanghe Expressway (vertical): It starts from Nanzhuangdou Interchange in the north and passes through Shangtang-Zhonghe Elevated Road, Qianjiang Fourth Bridge, Times Avenue and Joy Interchange, with a total length of 35.3 kilometers.

Liushi Expressway (transverse): It starts from the west line around the city, passes Liuxiang Road, Shi Xiang Road and Shida Expressway to Dajing Interchange around the city, with a total length of 20.9 kilometers.

Qiu Shi Expressway (Vertical)

It is necessary to speed up the construction of the third stage.

Qiu Shi Expressway starts from Shitang Interchange in the north and goes around the north line, passing through Banshan Tunnel, Shiqiao Road, Tao Qiu Road, Qianjiang Third Bridge and Fengqing Avenue to the south line, with a total length of 33.5 kilometers, of which-

Mid-level Tunnel (Shitang Interchange-Hangbo Road): 5 kilometers long, construction has started.

Shiqiao Road (Hangbo Road-Airport Road): 6 kilometers long, completed.

Fengqing Avenue (Airport Expressway-Kang Bin Road): 3.7 kilometers long, built according to quasi-expressway.

Fengqing Avenue (Kang Bin Road-Hu Xiang Road): 3.5 kilometers long, and construction is planned to start on 20 12.

South Extension of Fengqing Avenue (Hu Xiang Road-Huancheng South Line): 6.3 kilometers long, and construction is planned to start this year.

There is also a very important section, that is, Airport Road to Qianjiang Third Bridge, which is 6.2 kilometers long and is called "Qiu Shi Expressway Phase III", which is being studied in the early stage.

"Qiu Shi Expressway, the Mid-Levels Tunnel in the north will be completed by the end of this year, and the viaduct from Shiqiao Road to Airport Road has also been completed. The third Qianjiang Bridge in the south is elevated, with only five or six kilometers in the middle, which has become a bottleneck. Next, we will study how to turn this section into a highway. "

Chen Qian said that at present, they have made a multi-scheme study on the ground, overhead and underground, and made a decision after comprehensively considering factors such as demolition amount, project cost, construction period and traffic organization.

Once the preliminary work is completed, we will speed up the construction.

Jiangnan Avenue-Airport Expressway (Horizontal)

Airport Road should be converted into an elevated road.

This road starts from Times Avenue in the west, passes through Jiangnan Avenue, Airport Road Expressway, and goes around the east line to Xiaoshan International Airport, with a total length of 23.6 kilometers.

The reconstruction project of Airport Road has started, from Fengqing Avenue to Xiaoshan Airport, with a length of 18km, and it is planned to be completed in 20 12 years.

In the future, two-thirds of the airport road will be elevated, the upper expressway, the lower urban trunk road and seven interchanges.

Donghu Expressway (vertical)

The north-south connection of Jiubao Bridge is the key.

It starts from Linping City in the north, passes through Donghu Road, Jiubao Bridge and Tongcheng Avenue to the south line of the ring road, with a total length of 36.438+0 km. Among them-

Donghu Road (Lindong Road-Hangpu Expressway): 3.6 kilometers long, completed.

Donghu Road (Hangpu Expressway-Yuhang Street): 4. 1 km, and construction is planned to start next year.

Xiasha section of Donghu Road (Yuhang Street-Desheng Road): 1.3km long, and construction is planned to start next year.

North connection of Jiubao Bridge (Jiang Yan Road-Desheng Road): 2.5 kilometers long, construction started this year.

Jiubao Bridge: 2 kilometers long, construction has started.

South of Jiubao Bridge (Jiubao Bridge-Airport Road): 6.2 kilometers long, and construction is planned to start this year.

Tongcheng Avenue (Airport Highway-Xiaoshan Railway Station): 4.8 kilometers long, and construction is planned to start next year.

Tongcheng Avenue (Xiaoshan Railway Station-Huannan Line): 6.2km long, and construction is planned to start on 20 12.

This paper focuses on the north-south connection of Jiubao Bridge.

The Jiubao Bridge (the eighth Qianjiang Bridge) under construction is expected to be completed and opened to traffic by the end of next year.

Bridge is apart from the ground18m. How to get on and off the bridge is a key problem to be studied. At present, it is assumed that the approach bridges at both ends of the bridge, commonly known as "wiring", will be built in the form of viaduct, just like the fourth Qianjiang Bridge now. It is estimated that the construction time will be one year, and the Jiubao Bridge will be opened simultaneously.

Tianmushan Road-Genshan Expressway (level)

A tunnel will be built on Huancheng North Road (Kaixuan Road-Jianguo North Road).

This road starts from the west line and passes through Tianmushan Road, Huancheng North Road, Genshan Road and Donghu Road, with a total length of 25.9 kilometers.

Among them, Tianmushan Road (around the west line of the city-Gucui Road) and Genshan Road (Pengbu Interchange-Xiasha) are upgraded, and construction is planned to start on 20 12 or 20 13.

Chen Qian said that Hangzhou is studying to build a tunnel on Huancheng North Road, which will go down from the east of Kaixuan Road and come out from the west of Jianguo North Road to connect Tao Qiu Road and Zhonghe Road (pictured).

"The two highways are not connected. The traffic transfer between Zhonghe Elevated Road and Genqiu Interchange can only reach the ground, passing through the intersection of Kaixuan Road, Huancheng East Road and Jianguo North Road. If you tunnel, the traffic will be very convenient. In the future, traffic to this area can go from the ground, and traffic will go underground. "

Desheng Expressway (Cross)

Continue to extend from west to east.

It starts from the West Ring Road in the west, along Ji Hong Road, Zijingang Road, Wen Yi Road and Desheng Expressway to the East Ring Road, with a total length of 34.5 kilometers, of which-

Ji Hong Road (around the west line of the city-Liuxiang Road): 4. 1 km, which will be started this year.

Wen Yi Road (around the west line of the city-Baochu Road): 8.9 kilometers long, which has been built as a quasi-expressway.

Desheng Road (Baochu Road-Shangtang Section): 2 kilometers long, and construction is planned to start this year.

Desheng Road (Shangtanghe-Shanghai-Hangzhou Expressway): 7.8km long, completed.

Desheng Road (Shanghai-Hangzhou Expressway-Donghu Road): 6. 1 km, and construction is planned to start next year.

Desheng Road (Donghu Road-Xiasha Wen Hui Road): 7.3km long, and construction is planned to start on 20 12.

The west extension section of Desheng Expressway, which the citizens are very concerned about, is 2. 1 km from the present Shangtang River to the east of Baodanghai Community.

All the way through the two most blocked intersections in Hang Cheng, the intersection of Moganshan Road and Wen Yi Road, and the intersection of Hushu South Road and Wen Yi Road.

Zhijiang Bridge-Cai Hong Avenue Expressway (Cross)

Rainbow Avenue extends all the way to the east line around the city.

This road starts from the west of the city, passes through Zhijiang Bridge and Rainbow Avenue, and reaches the east of the city.

Zhipu Road (around the west line of the city-Zhijiang Bridge): 2.8km long, completed.

Zhijiang Bridge and its wiring: 3.2 kilometers long, construction has started.

Riverside section of Rainbow Avenue (Zhijiang Bridge-Xiaoshan Boundary): 9.3 kilometers long, and construction has started.

Xiaoshan section of Rainbow Avenue (Xiaoshan Boundary-East Ring Road): 1 1.3 km long, and construction is planned to start next year.