Current location - Education and Training Encyclopedia - Resume - Resume of maintenance engineer
Resume of maintenance engineer
Maintenance engineer resume template

Name: Resume Net Current address: Dongguan Age: 26 years old Residence: Hunan Nationality: China Marital Status: Unmarried Nationality: Han Nationality Training Certification: Not Attended Height: 167 cm Integrity Badge: Not Applied Weight: 60 kg Talent Assessment: Not Appraised My Major: Job Intention Talent Type: General Worker Application Position: Construction Project Acceptance: Work.

Name: resume. com

Current residence: Dongguan Age: 26 years old Residence: Hunan Nationality: China Marital Status: Unmarried Ethnic Group: Han Nationality Training Certification: Height Not Attended: 167 cm Integrity Badge: Unemployed Weight: 60 kg Talent Assessment: My specialty was not assessed:

working strength

Talent type: general worker position: construction project acceptance: engineer, water supply and drainage/refrigeration/HVAC engineering/plumber:, pre-sales/after-sales technical support engineer: working years: 3 Job description: job description: available date: one week salary requirements: negotiable. I hope to work in Guangzhou, Shenzhen and Dongguan.

Business experience

Guangdong Thermal Power Engineering Corporation: August 0, 20081~ Up to now, the company nature: State-owned enterprise industry: electric power/water conservancy position: maintenance engineer job description: 2008+01-2012: Guangdong Thermal Power Company Guangzhou Hengyun Power Plant Desulfurization Project Department. Responsible for the construction management of desulfurization tower body, flue and auxiliary machines (induced draft fan, oxidation fan, dilution fan, circulating pump, etc.). ) and 2×2 10MW thermal power unit desulfurization technical transformation project paint insulation; Responsible for the preparation of professional project installation schedule, and control and manage the quality, schedule and safety of installation projects during construction; Work with project quality engineer to deal with quality problems; Responsible for the acceptance of installation sub-projects and participate in the acceptance of overall unit projects; Responsible for the project payment settlement of the construction team and the new engineering quantity visa of the project; Responsible for collecting and sorting out the project completion acceptance data.

2012.01—2012.08: Worked as a maintenance engineer and assistant to the project manager in the denitration project department of Guangzhou Zhujiang Power Plant of Guangdong Thermal Power Plant, and was responsible for the construction management of denitration reactor body, flue, auxiliary machines, pipelines and platform stairs in the denitration technical transformation project of 4×300MW thermal power units; Responsible for the preparation of professional engineering installation schedule, and control and manage the quality, schedule and safety of the installation project during the construction process; Work with project quality engineer to deal with quality problems; Responsible for the acceptance of installation sub-projects and participate in the acceptance of overall unit projects; Responsible for the project payment settlement of the construction team and the new engineering quantity visa of the project; Be responsible for eliminating the defects of out-of-stock items 168 hours after trial operation; Responsible for collecting and sorting out the project completion acceptance data. In the construction management work, I studied hard and won the praise of the leaders. Reason for leaving: Suzhou Yankee Electromechanical Engineering Co., Ltd. Dongguan Branch: 2007-1-01~ 2008-06-30 Company nature: private enterprise industry: construction and engineering. Job Description: Responsible for the fire-fighting project of Taihe Trade City Project in Dalang Town, Dongguan (including fire-fighting water system, fire-fighting water supply system, fire-fighting water supply system, fire-fighting water supply system, fire-fighting water supply system, fire-fighting water supply system, reasons for leaving:

academic degree

Graduate school: Hunan University of Science and Technology. Highest education: Bachelor's degree: Graduation date: 20 12-06-30 Specialty 1: Building Environment and Equipment Engineering Specialty 2: Start year End year School (institution) obtained certificateNo. 2003-09-0 12007-06-30 Building Environment and Equipment of Hunan University of Science and Technology. 12007050005082012-07-222012-08-03 Quality Inspector of Guangdong Thermal Power Engineering Corporation-

linguistic competence

Foreign language: English general Cantonese level: good other foreign language ability: Putonghua level: excellent.

Working ability and other professional knowledge

I am serious and responsible for my work, proactive, with strong communication skills and pressure resistance, as well as good work adaptability.

Work, the preparation of professional engineering installation schedule, responsible for the quality, progress, safety and other aspects of professional engineering installation, responsible for the acceptance of the installation of sub-projects, to participate in the acceptance of the entire unit project; At the same time, I also have some management experience and methods of project cost control.

Participated in the quality inspector and safety training of the head office and won the first place in the safety knowledge competition of the head office for two consecutive years.

Through three years of work practice and experience accumulation, I am familiar with the management processes and methods of various projects, as well as the construction and acceptance specifications of maintenance equipment installation projects, and the work of project visas, progress payments and settlement payments.

Self-rated secondary constructor (mechanical and electrical engineering) (editor: 8021);