? Upon receiving the notice from the superior department, the inspection team will go to our project department at the end of February (next week) to review the "Double Excellent Demonstration Site" in Zhongshan on 20 17. The relevant matters are hereby notified as follows:
First, this inspection is a full coverage inspection, involving all aspects of safe and civilized construction of the whole site, especially the prevention of air pollution and fire safety that has been repeatedly emphasized recently.
Two. The specific inspection contents of the inspection team are as follows:
(1) Safety compliance. Check the construction site according to the ten items specified in JGJ59-99.
(two) the implementation of the relevant provisions of the state and province. Mainly includes:
1, implement the national mandatory standards and specifications for safety production in engineering construction;
2, the establishment and implementation of the responsibility system for production safety, the establishment and implementation of various safety management rules and regulations, the establishment of safety production management institutions and full-time personnel and the performance of duties;
3. Project safety supervision procedures;
4. The preparation, review, expert demonstration and implementation of the safety special construction scheme of partial projects with greater risks;
5, safety inspection, layout and implementation of safety hazards remediation work;
6, safety education and training, construction enterprises and project management personnel, special operations personnel related certificates and certificate review;
7, the use of safety protection equipment and mechanical equipment, lifting machinery and equipment disassembly, scaffolding and other professional contracting team qualifications;
8, accident emergency rescue plan preparation and exercise, accident report, investigation, handling and accountability provisions;
9, the fire situation of the construction site, focusing on the flame retardancy of color steel plate dormitory filling materials;
10, enclosure standard setting (continuous enclosure is closed, not opened at will, the final enclosure height is not less than 2.5m, the temporary enclosure height is not less than 1.8m, and the enclosure is kept clean and tidy), the site crossing and road hardening in the site reach the standard (the site crossing and road in the site are hardened by concrete without damage), and the bare soil coverage in the non-construction operation area reaches the standard. And the exposed site is covered with green plants), muck vehicles are washed up to the standard (when vehicle washing facilities are set and muck is transported out, full-time cleaning personnel are arranged to wash and clean, and vehicles are not allowed to take mud on the road), and the construction site and its surrounding areas are cleaned up to the standard (the roads on the construction site are arranged to be cleaned up by full-time cleaning personnel, and the surrounding areas of the construction site (the construction enclosure area is "horizontal to the side",
Three. Related work requirements
In view of the importance of this inspection, the company requires project leaders and managers at all levels to attach great importance to it and immediately carry out self-inspection on the construction site to further improve the safety production on the construction site. Anyone who is praised or praised by the inspection team in this inspection will be given extra rewards in the year-end performance appraisal, and those who are criticized will be punished in the year-end performance appraisal.
Hereby inform!
? Guangdong zhonglu construction engineering co., ltd
20 17 . 12 . 22